Water Districts Rates Data
Region 08
As of 6/30/2024

Biliran
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Culaba 872 D 264.00 33.95 42.85 51.75 55.65 55.65 603.50 1,032.00 10/20/2020
2. Naval 118 C 1 3 12/31/2023 183,703 7,059 20.82 105.00 14.35 15.65 17.00 18.55 20.45 248.50 405.00 2/10/2021
Total/Average 1 3

183,703

7,059

20.82 184.50 24.15 29.25 34.37 37.10 38.05 426.00 718.50

Eastern Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Borongan 116 D 1 4 12/31/2023 39,252 2,122 13.96 210.00 22.00 24.00 27.00 31.00 31.00 430.00 670.00 1/2/2003
2. Gen. Macarthur 568 D 1 1 12/31/2022 14,600 886 12.83 300.00 32.00 35.00 39.00 44.00 44.00 620.00 970.00 2/9/2022
3. Guiuan 201 D 6 7/31/2022 198,301 3,680 17.19 228.00 24.20 25.90 28.00 30.50 30.50 470.00 729.00 11/26/2002
4. Llorente 220 D 2 12/31/2004 109 180.00 21.00 24.50 27.50 31.50 31.50 390.00 635.00 11/24/2009
5. Oras 276 D 1 12/31/2023 10,809 450 18.90 198.00 22.80 26.80 31.80 37.80 37.80 426.00 694.00 5/22/2019
6. Sulat 425 D 1 12/31/2015 5,164 438 11.25 198.85 22.35 22.90 24.95 26.10 26.10 422.35 651.35 5/20/2008
7. Taft 584 D 1 1 4/30/2022 25,853 1,454 11.98 280.00 30.75 33.50 37.50 41.75 41.75 587.50 922.50 3/5/2011
Total/Average 1 13 5

293,979

9,030

14.96 227.83 25.01 27.51 30.82 34.66 34.66 477.97 753.12

Leyte
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baybay City 39 C 2 2 9 12/31/2023 291,502 12,386 19.11 166.32 18.79 21.49 24.73 28.51 28.51 354.22 569.12 5/17/2024
2. Metro Carigara 246 B 2 1 12/31/2022 195,590 11,354 13.89 181.45 19.05 20.95 24.00 28.80 28.80 371.95 581.45 4/11/2000
3. Leyte Metro 19 B 3 1 11/30/2023 1,726,879 53,727 20.73 148.50 16.35 19.00 22.15 22.15 22.15 312.00 502.00 5/20/2003
4. Abuyog 121 D 3 12/31/2023 59,528 2,051 17.16 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
5. Babatngon 438 D 1 1 12/31/2023 18,762 924 17.09 180.00 18.50 19.25 20.25 21.50 21.50 365.00 557.50 10/28/2014
6. Isabel 521 D 7 2 5/31/2023 108,200 5,638 17.49 240.00 26.50 29.50 33.00 37.00 37.00 505.00 800.00 11/19/2019
7. Jaro 157 D 1 2 9/30/2023 54,938 1,921 19.90 180.00 19.00 20.25 21.75 23.50 23.50 370.00 572.50 8/19/2008
8. Merida 520 D 2 10/31/2023 49,338 2,194 16.62 129.00 13.90 15.40 17.40 19.65 19.65 268.00 422.00 6/30/2009
9. Metro Hilongos 189 C 5 2 12/31/2023 120,741 6,416 14.03 262.00 28.70 31.20 34.30 37.60 37.60 549.00 861.00 12/16/2003
Total/Average 8 24 15

2,625,478

96,611

18.86 191.91 20.72 22.78 25.38 28.10 28.10 399.13 626.95

Northern Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Catarman 359 D 4 7/31/2023 55,270 1,274 20.00 243.00 27.85 31.50 35.00 39.00 39.00 521.50 836.50 11/7/2017
2. Gamay 619 D 1 180.00 19.30 20.70 22.20 24.00 24.00 373.00 580.00 7/23/2015
3. Laoang 381 D 7 12/31/2010 18,502 441 15.22 250.00 26.00 27.50 29.25 31.25 31.25 510.00 785.00 3/5/2003
4. San Isidro 557 D 1 7/31/2022 6,094 307 19.85 185.00 19.25 20.20 21.70 23.70 23.70 377.50 579.50 7/13/2012
5. San Jose 583 D 1 3 1 12/31/2023 24,447 1,622 13.20 230.00 23.70 24.65 26.30 28.30 28.30 467.00 713.50 6/25/2002
6. Victoria 556 D 1 12/31/2014 10,000 426 12.89 132.00 13.40 13.85 14.50 15.85 15.85 266.00 404.50 5/3/2001
Total/Average 1 16 2

114,313

4,070

16.02 203.33 21.58 23.06 24.82 27.01 27.01 419.16 649.83

Southern Leyte
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Maasin City 291 C 7 2 6/30/2022 161,967 7,288 17.81 160.00 18.45 20.20 22.00 24.00 24.00 344.50 546.50 3/1/2005
2. Sogod 188 C 3 4 3/31/2023 101,450 4,117 19.47 180.00 21.40 24.90 32.30 41.15 41.15 394.00 643.00 1/18/2005
Total/Average 10 6

263,417

11,405

18.41 170.00 19.92 22.55 27.15 32.57 32.57 369.25 594.75

Western Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Calbayog City 284 B 1 2 9/30/2023 422,339 15,095 19.02 287.00 33.15 36.00 40.00 44.75 44.75 618.50 978.50 11/23/2004
2. Catbalogan City 107 C 1 6 3 5/31/2023 248,087 9,713 200.00 22.15 24.30 28.25 32.45 32.45 421.50 664.50 2/13/2018
3. Basey 215 D 1 1 3/31/2024 66,240 2,272 13.11 192.00 20.25 21.90 24.00 26.70 26.70 394.50 613.50 8/23/2005
4. Calbiga 491 D 1 1 12/31/2023 22,940 20,272 1.00 180.00 13.40 14.65 16.15 17.90 17.90 314.00 460.50 12/8/2009
Total/Average 4 10 3 511,519

37,639

9.41 214.75 22.23 24.21 27.10 30.45 30.45 437.12 679.25
Regional Average 4 10 3 511,519

37,639

9.41 214.75 22.23 24.21 27.10 30.45 30.45 437.12 679.25

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.