Water Districts Rates Data
Region 08
As of 6/30/2010

Biliran
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Culaba 872 D 179.00 23.00 29.00 35.00 35.00 35.00 409.00 699.00 10/26/2005
2. Naval 118 C 1 3 6/30/2010 117,153 4,633 18.89 64.60 8.90 9.70 10.55 11.50 12.65 153.60 250.60 10/25/2000
Total/Average 1 3

117,153

4,633

18.89 121.80 15.95 19.35 22.77 23.25 23.82 281.30 474.80

Eastern Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Borongan 116 D 1 4 210.00 22.00 24.00 27.00 31.00 31.00 430.00 670.00 1/2/2003
2. Gen. Macarthur 568 D 1 1 252.00 26.50 29.00 33.00 37.50 37.50 517.00 807.00 8/8/2007
3. Guiuan 201 D 6 228.00 24.20 25.90 28.00 30.50 30.50 470.00 729.00 11/26/2002
4. Llorente 220 D 2 12/31/2004 109 180.00 21.00 24.50 27.50 31.50 31.50 390.00 635.00 11/24/2009
5. Oras 276 D 1 180.00 21.00 24.50 27.50 31.50 31.50 390.00 635.00 11/24/2009
6. Sulat 425 D 1 198.85 22.35 22.90 24.95 26.10 26.10 422.35 651.35 5/20/2008
7. Taft 584 D 1 1 185.00 20.00 22.00 24.50 27.50 27.50 385.00 605.00 3/18/2003
Total/Average 1 13 5

204.83 22.43 24.68 27.49 30.80 30.80 429.19 676.05

Leyte
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baybay City 39 C 2 2 9 78.00 8.90 9.80 10.45 11.85 11.85 167.00 265.00 8/24/1998
2. Metro Carigara 246 B 2 1 181.45 19.05 20.95 24.00 28.80 28.80 371.95 581.45 4/11/2000
3. Leyte Metro 19 B 3 1 148.50 16.35 19.00 22.15 22.15 22.15 312.00 502.00 5/20/2003
4. Abuyog 121 D 3 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
5. Babatngon 438 D 1 1 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
6. Isabel 521 D 7 2 6/30/2010 66,513 2,297 22.85 170.00 18.50 21.00 24.50 29.00 29.00 355.00 565.00 10/20/2009
7. Jaro 157 D 1 2 180.00 19.00 20.25 21.75 23.50 23.50 370.00 572.50 8/19/2008
8. Merida 520 D 2 129.00 13.90 15.40 17.40 19.65 19.65 268.00 422.00 6/30/2009
9. Metro Hilongos 189 C 5 2 6/30/2010 79,269 2,831 15.03 262.00 28.70 31.20 34.30 37.60 37.60 549.00 861.00 12/16/2003
Total/Average 8 24 15

145,782

5,128

18.53 180.99 19.53 21.51 24.02 26.78 26.78 376.32 591.43

Northern Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Catarman 359 D 4 175.00 20.50 23.75 27.25 31.00 31.00 380.00 617.50 4/25/2005
2. Gamay 619 D 1 175.00 20.50 23.75 27.25 31.00 31.00 380.00 617.50 4/25/2005
3. Laoang 381 D 7 250.00 26.00 27.50 29.25 31.25 31.25 510.00 785.00 3/5/2003
4. San Isidro 557 D 1 146.00 16.40 18.80 21.70 25.40 25.40 310.00 498.00 7/11/2006
5. San Jose 583 D 1 3 1 230.00 23.70 24.65 26.30 28.30 28.30 467.00 713.50 6/25/2002
6. Victoria 556 D 1 132.00 13.40 13.85 14.50 15.85 15.85 266.00 404.50 5/3/2001
Total/Average 1 16 2

184.66 20.08 22.05 24.37 27.13 27.13 385.50 606.00

Southern Leyte
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Maasin City 291 C 7 2 160.00 18.45 20.20 22.00 24.00 24.00 344.50 546.50 3/1/2005
2. Sogod 188 C 3 4 6/30/2010 47,041 1,852 18.48 180.00 21.40 24.90 32.30 41.15 41.15 394.00 643.00 1/18/2005
Total/Average 10 6

47,041

1,852

18.48 170.00 19.92 22.55 27.15 32.57 32.57 369.25 594.75

Western Samar
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Calbayog City 284 B 1 2 9/30/2008 197,978 8,695 18.97 287.00 33.15 36.00 40.00 44.75 44.75 618.50 978.50 11/23/2004
2. Catbalogan City 107 C 1 6 3 9/30/2008 135,307 5,921 19.04 175.00 19.45 21.35 24.80 28.50 28.50 369.50 583.00 4/18/2006
3. Basey 215 D 1 1 192.00 20.25 21.90 24.00 26.70 26.70 394.50 613.50 8/23/2005
4. Calbiga 491 D 1 1 180.00 13.40 14.65 16.15 17.90 17.90 314.00 460.50 12/8/2009
Total/Average 4 10 3 333,285

14,616

19 208.50 21.56 23.47 26.23 29.46 29.46 424.12 658.87
Regional Average 14 74 34 643,261

26,229

18.85 186.28 20.37 22.54 25.32 28.29 28.33 390.06 615.53

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.