Water Districts Rates Data
Region 04
As of 6/30/2007

Batangas
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 162.00 19.50 21.25 23.25 25.50 25.50 357.00 569.50 1/5/2005
2. Lemery 169 C 18 6/30/2007 183,854 6,503 23.74 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
3. Mabini 93 C 27 160.00 18.00 20.25 22.75 25.50 25.50 340.00 542.50 1/22/2001
4. Nasugbu 155 C 7 155.00 16.00 16.60 17.20 18.20 18.20 315.00 481.00 7/4/2006
5. Rosario 111 C 9 160.00 17.00 18.50 20.50 23.00 26.00 330.00 515.00 8/6/2003
6. San Juan 55 C 14 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
7. Taal 516 C 12 1 6/30/2007 84,664 2,989 23.60 158.00 17.20 18.80 20.50 21.20 21.20 330.00 518.00 5/9/2005
8. Batangas City 8 A 30 168.50 19.50 22.00 24.00 26.00 26.00 363.50 583.50 5/30/2006
9. Metro Lipa 12 A 493 6/30/2007 1,477,906 44,082 25.47 116.70 12.80 14.50 16.70 19.50 19.50 244.70 389.70 2/13/2001
10. Tanauan 333 B 87 158.00 17.10 19.15 22.20 26.70 26.70 329.00 520.50 7/31/2002
11. Alitagtag 373 C 10 6/30/2007 57,491 1,756 25.25 180.20 20.00 22.25 24.75 27.50 27.50 380.20 602.70 1/15/2002
12. Balayan 109 C 10 180.00 21.00 24.25 27.75 31.50 31.50 390.00 632.50 10/5/2004
13. Lian 609 D 5 135.00 15.50 18.50 22.50 27.50 27.50 290.00 475.00 6/13/2006
14. Lobo 422 C 13 1 220.00 23.00 24.50 26.50 29.00 29.00 450.00 695.00 9/10/2002
15. San Luis 677 D 1 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
16. Taysan 470 C 6 164.60 18.45 19.60 20.65 21.65 21.65 349.10 545.10 6/28/2005
17. Tuy 377 C 6 180.00 19.30 20.20 21.00 22.70 22.70 373.00 575.00 9/21/2005
Total/Average 765 2

1,803,915

55,330

25.16 175.17 19.35 21.34 23.67 26.46 26.64 368.76 582.20

Cavite
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Carmona 561 B 17 6/30/2007 149,382 5,115 22.90 238.60 26.20 29.00 32.60 37.00 37.00 500.60 790.60 3/16/2004
2. Gen. Mariano Alvarez 393 B 29 212.00 22.45 24.25 27.00 30.75 30.75 436.50 679.00 8/31/2000
3. Indang 99 C 15 3 153.00 18.45 20.65 22.60 22.60 22.60 337.50 544.00 2/20/2007
4. Mendez 424 C 10 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
5. Silang 115 A 77 2 132.00 14.00 15.50 14.50 17.50 20.00 272.00 427.00 9/18/2000
6. Tagaytay City 37 B 19 2 202.00 22.90 25.65 28.90 32.40 36.15 431.00 687.50 2/15/2005
7. Tanza 358 B 11 6/30/2007 214,574 6,982 25.61 150.00 15.90 17.10 18.60 20.40 20.40 309.00 480.00 7/31/2000
8. Trece Martires City 574 B 31 130.00 13.95 14.95 16.00 18.00 18.00 269.50 419.00 6/24/2003
9. Amadeo 601 C 16 211.00 26.00 28.00 31.00 35.00 35.00 471.00 751.00 3/15/2005
10. Gen. E. Aguinaldo 555 D 4 2 163.00 17.30 19.70 23.45 27.60 27.60 336.00 533.00 6/3/2003
11. Maragondon 503 C 5 6/30/2007 74,629 2,735 22.74 118.00 13.00 14.50 16.50 19.00 22.00 248.00 393.00 1/1/2005
12. Dasmarinas City 83 A 144 6/30/2007 2,741,708 94,618 19.47 118.00 14.20 17.05 20.00 23.05 23.05 260.00 430.50 12/1/2005
Total/Average 378 9

3,180,293

109,450

20.11 168.55 18.82 20.86 23.20 26.17 26.94 356.75 565.38

Laguna
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
2. Cabuyao 596 C 18 125.00 13.80 15.20 16.80 18.60 18.60 263.00 415.00 2/7/2006
3. Pagsanjan 122 C 8 3 200.00 22.00 24.00 26.00 29.00 29.00 420.00 660.00 2/15/2005
4. Siniloan 395 C 9 2 120.00 12.90 14.20 15.90 18.30 18.30 249.00 391.00 1/31/2006
5. Sta. Cruz 127 B 19 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
6. Calamba 29 A 82 1 6/30/2007 1,041,207 33,704 25.02 115.35 12.60 14.90 19.10 22.70 22.70 241.35 390.35 7/31/2000
7. Laguna 38 A 16 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
8. San Pablo City 4 A 31 6 100.00 11.00 12.15 13.30 14.00 14.00 210.00 331.50 7/19/2005
9. San Pedro 170 B 54 141.90 14.40 15.05 15.40 15.80 15.80 285.90 436.40 3/11/2003
10. Mabitac 668 D 1 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
11. Pakil 518 D 1 1 100.00 11.00 12.20 13.60 15.20 15.20 210.00 332.00 9/5/2006
Total/Average 251 14

1,041,207

33,704

25.02 145.75 15.70 17.48 19.65 21.86 22.80 302.75 477.61

Occidental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. San Jose 62 C 20 208.00 22.00 23.40 25.00 26.80 26.80 428.00 662.00 1/2/2007
2. Sablayan 197 C 13 6/30/2007 29,706 1,527 17.41 185.00 19.50 20.50 22.00 23.50 23.50 380.00 585.00 3/13/2007
Total/Average 35

29,706

1,527

17.41 196.50 20.75 21.95 23.50 25.15 25.15 404.00 623.50

Oriental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Pinamalayan 327 D 1 3 155.00 16.60 18.20 20.90 23.50 23.50 321.00 503.00 2/13/2001
2. Naujan 245 D 3 170.00 18.55 20.65 23.20 23.20 23.20 355.50 562.00 2/5/2002
3. Pola 96 D 1 92.60 9.90 11.60 13.65 13.65 13.65 191.60 307.60 9/25/2001
4. Roxas 334 D 1 145.00 15.30 16.20 17.20 18.40 18.40 298.00 460.00 9/18/2006
Total/Average 1 9

140.65 15.08 16.66 18.73 19.68 19.68 291.52 458.15

Palawan
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Puerto Princesa City 26 A 9 36 6/30/2007 537,950 18,687 20.66 200.00 21.35 23.35 26.00 29.35 29.35 413.50 647.00 8/9/2005
2. Aborlan 440 D 4/30/2001 145.00 15.30 16.20 17.20 18.40 18.40 298.00 460.00 9/18/2006
3. Culion 599 D 1 4 110.00 12.00 14.00 17.00 17.00 21.00 230.00 370.00 3/1/2005
4. Roxas 449 D 1 1 180.00 20.50 23.00 25.50 28.00 28.00 385.00 615.00 4/16/2001
5. Taytay 604 D 1 150.00 16.00 17.00 18.00 20.00 20.00 310.00 480.00 2/15/2001
Total/Average 10 40 4

537,950

18,687

20.66 157.00 17.03 18.71 20.74 22.55 23.35 327.30 514.40

Quezon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Infanta - Gen. Nakar 229 C 6 151.00 16.45 18.25 20.65 20.65 20.65 315.50 498.00 6/19/2002
2. Lopez 45 D 3 4 159.00 17.20 18.25 19.65 21.80 21.80 331.00 513.50 1/24/2006
3. Tiaong 151 C 7 200.00 22.50 25.00 30.00 37.50 37.50 425.00 675.00 8/23/2005
4. Quezon Metro 17 A 36 16 6/30/2007 1,210,107 32,294 31.23 108.00 11.65 12.70 13.95 15.50 15.50 224.50 351.50 1/24/2006
5. Atimonan 260 D 1 4 243.40 29.45 33.35 38.00 43.15 43.15 537.90 871.40 11/15/2005
6. Burdeos 581 D 1 243.40 29.45 33.35 38.00 43.15 43.15 537.90 871.40 11/15/2005
7. Calauag 78 C 1 8 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
8. Candelaria 114 C 9 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
9. Catanauan 531 D 1 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
10. Dolores 462 D 1 3 3 130.00 14.50 16.25 18.50 21.25 21.25 275.00 437.50 4/10/2003
11. Guinayangan 303 D 1 3 9 6/30/2007 33,904 1,909 16.15 155.00 17.90 19.65 21.60 23.70 23.70 334.00 530.50 1/3/2006
12. Gumaca 79 D 9 6/30/2007 6,992 627 7.39 262.00 28.40 30.80 33.85 38.05 38.05 546.00 854.00 2/1/2005
13. Macalelon 580 D 3 322.00 33.50 35.50 38.50 42.50 42.50 657.00 1,012.00 3/1/2005
14. Mauban 298 D 5 4 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
15. Polilio 600 D 2 200.00 21.00 22.50 24.50 27.00 27.00 410.00 635.00 1/20/2004
16. San Francisco 842 D 2 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
17. Tagkawayan 130 C 1 3 6/30/2007 40,752 1,795 14.49 171.60 17.95 19.15 20.70 22.45 22.45 351.10 542.60 2/4/2003
Total/Average 6 97 51

1,291,755

36,625

29.21 195.37 21.79 23.63 26.52 29.24 29.24 413.28 649.61

Rizal
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 6/30/2007 210,745 7,174 24.48 175.00 19.00 20.95 23.00 25.15 27.40 365.00 574.50 5/13/2003
2. Pililla 487 C 17 225.00 23.50 25.50 28.50 32.50 32.50 460.00 715.00 6/25/2007
3. Teresa 536 C 11 6/30/2007 83,609 3,500 19.91 160.00 17.60 19.50 21.85 24.90 24.90 336.00 531.00 9/1/2003
4. Tanay 88 B 15 2 6/30/2007 284,432 10,664 21.34 188.00 19.80 22.20 26.50 33.40 33.40 386.00 608.00 6/1/2001
Total/Average 55 2

578,786

21,338

22.16 187.00 19.97 22.03 24.96 28.98 29.55 386.75 607.12

Romblon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 6/30/2007 57,030 1,933 21.14 115.00 11.65 14.80 19.00 23.65 23.65 231.50 379.50 2/8/2005
2. Romblon 64 D 7 6/30/2007 32,020 1,415 18.35 113.00 13.00 14.00 16.00 19.00 19.00 243.00 383.00 7/24/2004
Total/Average 8 1 89,050

3,348

19.96 114.00 12.32 14.40 17.50 21.32 21.32 237.25 381.25
Regional Average 17 1638 83 8,552,661

280,009

23.07 170.83 18.77 20.65 23.08 25.70 26.09 358.62 565.16

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.