Water Districts Rates Data
Region 04
As of 6/30/2005

Batangas
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 162.00 19.50 21.25 23.25 25.50 25.50 357.00 569.50 1/5/2005
2. Lemery 169 C 18 6/30/2005 167,344 6,127 22.76 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
3. Mabini 93 C 27 160.00 18.00 20.25 22.75 25.50 25.50 340.00 542.50 1/22/2001
4. Nasugbu 155 C 7 137.80 14.80 16.50 19.00 20.00 20.00 285.80 450.80 6/7/2005
5. Rosario 111 C 9 160.00 17.00 18.50 20.50 23.00 26.00 330.00 515.00 8/6/2003
6. San Juan 55 C 14 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
7. Taal 516 C 12 1 6/30/2005 81,581 2,824 24.07 158.00 17.20 18.80 20.50 21.20 21.20 330.00 518.00 5/9/2005
8. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
9. Metro Lipa 12 A 493 6/30/2005 1,341,361 40,255 27.77 116.70 12.80 14.50 16.70 19.50 19.50 244.70 389.70 2/13/2001
10. Tanauan 333 B 87 158.00 17.10 19.15 22.20 26.70 26.70 329.00 520.50 7/31/2002
11. Alitagtag 373 C 10 180.20 20.00 22.25 24.75 27.50 27.50 380.20 602.70 1/15/2002
12. Balayan 109 C 10 180.00 21.00 24.25 27.75 31.50 31.50 390.00 632.50 10/5/2004
13. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
14. Lobo 422 C 13 1 220.00 23.00 24.50 26.50 29.00 29.00 450.00 695.00 9/10/2002
15. San Luis 677 D 1 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
16. Taysan 470 C 6 164.60 18.45 19.60 20.65 21.65 21.65 349.10 545.10 6/28/2005
17. Tuy 377 C 6 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
Total/Average 765 2

1,590,286

49,206

26.93 136.60 15.03 16.64 18.57 20.64 21.01 286.98 453.41

Cavite
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Carmona 561 B 17 6/30/2005 97,856 3,342 24.40 238.60 26.20 29.00 32.60 37.00 37.00 500.60 790.60 3/16/2004
2. Gen. Mariano Alvarez 393 B 29 212.00 22.45 24.25 27.00 30.75 30.75 436.50 679.00 8/31/2000
3. Indang 99 C 15 3 120.00 14.20 15.90 17.40 17.40 17.40 262.00 421.00 6/4/2002
4. Mendez 424 C 10 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
5. Silang 115 A 77 2 132.00 14.00 15.50 14.50 17.50 20.00 272.00 427.00 9/18/2000
6. Tagaytay City 37 B 19 2 202.00 22.90 25.65 28.90 32.40 36.15 431.00 687.50 2/15/2005
7. Tanza 358 B 11 6/30/2005 173,127 5,274 27.36 150.00 15.90 17.10 18.60 20.40 20.40 309.00 480.00 7/31/2000
8. Trece Martires City 574 B 31 130.00 13.95 14.95 16.00 18.00 18.00 269.50 419.00 6/24/2003
9. Amadeo 601 C 16 211.00 26.00 28.00 31.00 35.00 35.00 471.00 751.00 3/15/2005
10. Gen. E. Aguinaldo 555 D 4 2 163.00 17.30 19.70 23.45 27.60 27.60 336.00 533.00 6/3/2003
11. Maragondon 503 C 5 6/30/2005 66,817 2,474 22.51 118.00 13.00 14.50 16.50 19.00 22.00 248.00 393.00 1/1/2005
12. Dasmarinas City 83 A 144 6/30/2005 2,096,288 84,490 20.68 89.00 10.80 13.15 15.60 18.45 18.45 197.00 328.50 7/31/2000
Total/Average 378 9

2,434,089

95,580

21.22 136.86 15.07 16.75 18.51 20.86 21.70 287.59 455.18

Laguna
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
2. Cabuyao 596 C 18 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
3. Pagsanjan 122 C 8 3 200.00 22.00 24.00 26.00 29.00 29.00 420.00 660.00 2/15/2005
4. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
5. Sta. Cruz 127 B 19 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
6. Calamba 29 A 82 1 6/30/2005 937,996 30,783 25.39 115.35 12.60 14.90 19.10 22.70 22.70 241.35 390.35 7/31/2000
7. Laguna 38 A 16 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
8. San Pablo City 4 A 31 6 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
9. San Pedro 170 B 54 141.90 14.40 15.05 15.40 15.80 15.80 285.90 436.40 3/11/2003
10. Mabitac 668 D 1 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
11. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
Total/Average 251 14

937,996

30,783

25.39 114.53 12.27 13.65 15.53 17.08 17.48 237.31 373.81

Occidental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. San Jose 62 C 20 125.00 13.00 14.00 16.00 18.00 18.00 255.00 395.00 3/5/2002
2. Sablayan 197 C 13 6/30/2005 29,401 1,456 16.83 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
Total/Average 35

29,401

1,456

16.83 137.50 14.00 15.00 17.00 19.50 19.50 277.50 427.50

Oriental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Pinamalayan 327 D 1 3 155.00 16.60 18.20 20.90 23.50 23.50 321.00 503.00 2/13/2001
2. Naujan 245 D 3 170.00 18.55 20.65 23.20 23.20 23.20 355.50 562.00 2/5/2002
3. Pola 96 D 1 92.60 9.90 11.60 13.65 13.65 13.65 191.60 307.60 9/25/2001
4. Roxas 334 D 1 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
Total/Average 1 9

123.40 13.17 14.53 16.35 17.07 17.07 255.15 400.52

Palawan
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Puerto Princesa City 26 A 9 36 6/30/2005 480,415 15,869 21.66 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
2. Aborlan 440 D 4/30/2001 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
3. Culion 599 D 1 4 110.00 12.00 14.00 17.00 17.00 21.00 230.00 370.00 3/1/2005
4. Roxas 449 D 1 1 180.00 20.50 23.00 25.50 28.00 28.00 385.00 615.00 4/16/2001
5. Taytay 604 D 1 150.00 16.00 17.00 18.00 20.00 20.00 310.00 480.00 2/15/2001
Total/Average 10 40 4

480,415

15,869

21.66 147.50 16.12 17.75 19.87 21.75 22.75 308.75 486.25

Quezon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Infanta - Gen. Nakar 229 C 6 151.00 16.45 18.25 20.65 20.65 20.65 315.50 498.00 6/19/2002
2. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
3. Tiaong 151 C 7 122.00 13.00 15.00 18.00 18.00 22.00 252.00 402.00 2/13/2001
4. Quezon Metro 17 A 36 16 102.50 10.65 11.85 13.00 14.50 14.50 209.00 327.50 7/15/2003
5. Atimonan 260 D 1 4 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
6. Burdeos 581 D 1 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
7. Calauag 78 C 1 8 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
8. Candelaria 114 C 9 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
9. Catanauan 531 D 1 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
10. Dolores 462 D 1 3 3 130.00 14.50 16.25 18.50 21.25 21.25 275.00 437.50 4/10/2003
11. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
12. Gumaca 79 D 9 262.00 28.40 30.80 33.85 38.05 38.05 546.00 854.00 2/1/2005
13. Macalelon 580 D 3 322.00 33.50 35.50 38.50 42.50 42.50 657.00 1,012.00 3/1/2005
14. Mauban 298 D 5 4 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
15. Polilio 600 D 2 200.00 21.00 22.50 24.50 27.00 27.00 410.00 635.00 1/20/2004
16. San Francisco 842 D 2 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
17. Tagkawayan 130 C 1 3 171.60 17.95 19.15 20.70 22.45 22.45 351.10 542.60 2/4/2003
Total/Average 6 97 51

146.43 16.03 17.58 19.68 21.06 21.63 306.79 482.68

Rizal
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 6/30/2005 197,919 6,488 25.42 175.00 19.00 20.95 23.00 25.15 27.40 365.00 574.50 5/13/2003
2. Pililla 487 C 17 130.00 13.20 14.75 17.20 18.40 18.40 262.00 409.50 3/19/2002
3. Teresa 536 C 11 6/30/2005 72,284 2,869 21.00 160.00 17.60 19.50 21.85 24.90 24.90 336.00 531.00 9/1/2003
4. Tanay 88 B 15 2 6/30/2005 248,914 8,611 24.09 188.00 19.80 22.20 26.50 33.40 33.40 386.00 608.00 6/1/2001
Total/Average 55 2

519,117

17,968

24.08 170.60 18.33 20.31 22.95 26.04 26.42 353.90 557.00

Romblon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 115.00 11.65 14.80 19.00 23.65 23.65 231.50 379.50 2/8/2005
2. Romblon 64 D 7 113.00 13.00 14.00 16.00 19.00 19.00 243.00 383.00 7/24/2004
Total/Average 8 1

95.00 10.30 12.22 15.12 17.75 17.75 198.00 320.25
Regional Average 17 1638 83 5,991,304

210,862

23.41 136.63 14.85 16.42 18.39 20.25 20.73 285.17 449.39

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.