Water Districts Rates Data
Region 04
As of 6/30/2002

Batangas
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
2. Lemery 169 C 18 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
3. Mabini 93 C 27 160.00 18.00 20.25 22.75 25.50 25.50 340.00 542.50 1/22/2001
4. Nasugbu 155 C 7 155.00 16.60 18.05 19.90 22.50 25.45 321.00 501.50 9/11/2001
5. Rosario 111 C 9 88.00 9.20 9.80 10.00 11.00 11.00 180.00 278.00 12/1/1997
6. San Juan 55 C 14 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
7. Taal 516 C 12 1 100.00 12.00 12.00 13.00 13.00 13.00 220.00 340.00 4/20/1993
8. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
9. Metro Lipa 12 A 493 116.70 12.80 14.50 16.70 19.50 19.50 244.70 389.70 2/13/2001
10. Tanauan 333 B 87 114.00 13.00 15.00 15.00 17.00 17.00 244.00 394.00 7/6/1999
11. Alitagtag 373 C 10 180.20 20.00 22.25 24.75 27.50 27.50 380.20 602.70 1/15/2002
12. Balayan 109 C 10 160.00 18.00 21.00 25.00 28.00 28.00 340.00 550.00 7/31/2000
13. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
14. Lobo 422 C 13 1 90.00 9.70 10.00 11.00 11.00 11.00 187.00 287.00 9/8/1997
15. San Luis 677 D 1 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
16. Taysan 470 C 6 130.00 14.30 15.20 16.00 16.00 16.00 273.00 425.00 12/11/2000
17. Tuy 377 C 6 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
Total/Average 765 2

112.06 12.28 13.38 14.71 17.04 17.04 234.87 368.68

Cavite
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Carmona 561 B 17 95.00 10.00 11.00 13.00 14.00 14.00 195.00 305.00 2/8/2000
2. Gen. Mariano Alvarez 393 B 29 212.00 22.45 24.25 27.00 30.75 30.75 436.50 679.00 8/31/2000
3. Indang 99 C 15 3 120.00 14.20 15.90 17.40 17.40 17.40 262.00 421.00 6/4/2002
4. Mendez 424 C 10 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
5. Silang 115 A 77 2 132.00 14.00 15.50 14.50 17.50 20.00 272.00 427.00 9/18/2000
6. Tagaytay City 37 B 19 2 166.00 19.00 21.75 25.00 28.50 32.25 356.00 573.50 9/25/2000
7. Tanza 358 B 11 150.00 15.90 17.10 18.60 20.40 20.40 309.00 480.00 7/31/2000
8. Trece Martires City 574 B 31 81.00 9.40 10.00 12.00 14.00 14.00 175.00 275.00 4/13/1999
9. Amadeo 601 C 16 60.00 7.00 7.25 7.50 7.75 7.75 130.00 202.50 7/31/2000
10. Gen. E. Aguinaldo 555 D 4 2 71.00 7.50 8.55 10.20 12.00 12.00 146.00 231.50 3/9/1999
11. Maragondon 503 C 5 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
12. Dasmarinas City 83 A 144 89.00 10.80 13.15 15.60 18.45 18.45 197.00 328.50 7/31/2000
Total/Average 378 9

102.27 11.23 12.41 14.00 15.77 16.11 214.63 338.81

Laguna
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
2. Cabuyao 596 C 18 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
3. Pagsanjan 122 C 8 3 138.80 15.00 16.40 18.35 18.35 18.35 288.80 452.80 2/22/2000
4. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
5. Sta. Cruz 127 B 19 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
6. Calamba 29 A 82 1 115.35 12.60 14.90 19.10 22.70 22.70 241.35 390.35 7/31/2000
7. Laguna 38 A 16 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
8. San Pablo City 4 A 31 6 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
9. San Pedro 170 B 54 98.00 10.00 10.00 10.00 10.00 10.00 198.00 298.00 5/16/1997
10. Mabitac 668 D 1 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
11. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
Total/Average 251 14

94.60 10.14 11.06 12.69 14.04 14.29 196.03 306.66

Occidental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. San Jose 62 C 20 125.00 13.00 14.00 16.00 18.00 18.00 255.00 395.00 3/5/2002
2. Sablayan 197 C 13 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
Total/Average 35

137.50 14.00 15.00 17.00 19.50 19.50 277.50 427.50

Oriental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Pinamalayan 327 D 1 3 155.00 16.60 18.20 20.90 23.50 23.50 321.00 503.00 2/13/2001
2. Naujan 245 D 3 170.00 18.55 20.65 23.20 23.20 23.20 355.50 562.00 2/5/2002
3. Pola 96 D 1 92.60 9.90 11.60 13.65 13.65 13.65 191.60 307.60 9/25/2001
4. Roxas 334 D 1 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
Total/Average 1 9

87.65 9.23 9.82 11.07 11.40 11.40 180.02 278.27

Palawan
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Puerto Princesa City 26 A 9 36 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
2. Aborlan 440 D 4/30/2001 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
3. Culion 599 D 1 4 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
4. Roxas 449 D 1 1 180.00 20.50 23.00 25.50 28.00 28.00 385.00 615.00 4/16/2001
5. Taytay 604 D 1 150.00 16.00 17.00 18.00 20.00 20.00 310.00 480.00 2/15/2001
Total/Average 10 40 4

150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00

Quezon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Infanta - Gen. Nakar 229 C 6 151.00 16.45 18.25 20.65 20.65 20.65 315.50 498.00 6/19/2002
2. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
3. Tiaong 151 C 7 122.00 13.00 15.00 18.00 18.00 22.00 252.00 402.00 2/13/2001
4. Quezon Metro 17 A 36 16 90.00 9.80 10.00 11.00 11.00 11.00 188.00 288.00 7/27/1999
5. Atimonan 260 D 1 4 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
6. Burdeos 581 D 1 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
7. Calauag 78 C 1 8 119.80 14.00 16.00 17.00 17.00 17.00 259.80 419.80 9/18/2000
8. Candelaria 114 C 9 119.80 14.00 16.00 17.00 17.00 17.00 259.80 419.80 9/18/2000
9. Catanauan 531 D 1 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
10. Dolores 462 D 1 3 3 80.00 8.80 10.00 11.00 11.00 11.00 168.00 268.00 12/11/1995
11. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
12. Gumaca 79 D 9 180.00 19.00 20.55 22.55 22.65 22.65 370.00 575.50 6/29/1999
13. Macalelon 580 D 3 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
14. Mauban 298 D 5 4 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
15. Polilio 600 D 2 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
16. San Francisco 842 D 2 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
17. Tagkawayan 130 C 1 3 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
Total/Average 6 97 51

119.83 13.06 14.40 16.14 17.16 17.47 250.52 394.52

Rizal
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
2. Pililla 487 C 17 130.00 13.20 14.75 17.20 18.40 18.40 262.00 409.50 3/19/2002
3. Teresa 536 C 11 125.00 13.00 15.00 17.00 19.00 19.00 255.00 405.00 8/14/2000
4. Tanay 88 B 15 2 188.00 19.80 22.20 26.50 33.40 33.40 386.00 608.00 6/1/2001
Total/Average 55 2

127.50 13.10 14.87 17.10 18.70 18.70 258.50 407.25

Romblon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 100.00 10.60 13.45 17.25 21.50 21.50 206.00 340.50 4/16/2001
2. Romblon 64 D 7 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55 2/2/1994
Total/Average 8 1

69.77 7.50 8.75 10.67 10.67 10.67 144.77 232.27
Regional Average 17 1638 83

109.40 11.82 12.95 14.51 16.06 16.24 227.68 357.23

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.