Water Districts Rates Data
Region 04
As of 6/30/2000

Batangas
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
2. Lemery 169 C 18 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
3. Mabini 93 C 27 90.00 9.70 10.00 11.00 11.00 11.00 187.00 287.00 9/8/1997
4. Nasugbu 155 C 7 106.00 11.00 12.00 14.00 14.00 14.00 216.00 336.00 12/1/1997
5. Rosario 111 C 9 88.00 9.20 9.80 10.00 11.00 11.00 180.00 278.00 12/1/1997
6. San Juan 55 C 14 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
7. Taal 516 C 12 1 100.00 12.00 12.00 13.00 13.00 13.00 220.00 340.00 4/20/1993
8. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
9. Metro Lipa 12 A 493 88.00 9.70 10.00 11.00 13.00 13.00 185.00 285.00 2/13/2000
10. Tanauan 333 B 87 114.00 13.00 15.00 15.00 17.00 17.00 244.00 394.00 7/6/1999
11. Alitagtag 373 C 10 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
12. Balayan 109 C 10 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
13. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
14. Lobo 422 C 13 1 90.00 9.70 10.00 11.00 11.00 11.00 187.00 287.00 9/8/1997
15. San Luis 677 D 1 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
16. Taysan 470 C 6 114.00 13.00 15.00 15.00 17.00 17.00 244.00 394.00 7/6/1999
17. Tuy 377 C 6 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
Total/Average 765 2

92.75 9.82 10.41 11.37 11.87 11.87 191.00 295.12

Cavite
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Carmona 561 B 17 95.00 10.00 11.00 13.00 14.00 14.00 195.00 305.00 2/8/2000
2. Gen. Mariano Alvarez 393 B 29 125.00 13.00 14.00 15.00 18.00 18.00 255.00 395.00 6/6/1998
3. Indang 99 C 15 3 79.00 8.70 9.70 11.00 11.00 11.00 166.00 263.00 8/10/1994
4. Mendez 424 C 10 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
5. Silang 115 A 77 2 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
6. Tagaytay City 37 B 19 2 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
7. Tanza 358 B 11 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
8. Trece Martires City 574 B 31 81.00 9.40 10.00 12.00 14.00 14.00 175.00 275.00 4/13/1999
9. Amadeo 601 C 16 75.00 9.00 10.00 11.00 12.00 12.00 165.00 265.00 9/15/1998
10. Gen. E. Aguinaldo 555 D 4 2 71.00 7.50 8.55 10.20 12.00 12.00 146.00 231.50 3/9/1999
11. Maragondon 503 C 5 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
12. Dasmarinas City 83 A 144 95.00 10.00 11.00 13.00 14.00 14.00 195.00 305.00 2/8/2000
Total/Average 378 9

90.66 9.68 10.60 12.01 13.26 13.26 187.50 293.50

Laguna
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
2. Cabuyao 596 C 18 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
3. Pagsanjan 122 C 8 3 138.80 15.00 16.40 18.35 18.35 18.35 288.80 452.80 2/22/2000
4. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
5. Sta. Cruz 127 B 19 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
6. Calamba 29 A 82 1 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
7. Laguna 38 A 16 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
8. San Pablo City 4 A 31 6 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
9. San Pedro 170 B 54 98.00 10.00 10.00 10.00 10.00 10.00 198.00 298.00 5/16/1997
10. Mabitac 668 D 1 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
11. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
Total/Average 251 14

102.90 10.76 11.33 12.66 13.00 13.66 210.56 323.90

Occidental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. San Jose 62 C 20 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
2. Sablayan 197 C 13 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
Total/Average 35

Oriental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Pinamalayan 327 D 1 3 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
2. Naujan 245 D 3 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
3. Pola 96 D 1 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
4. Roxas 334 D 1 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
Total/Average 1 9

65.80 6.87 7.65 8.55 8.65 8.65 134.55 211.05

Palawan
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Puerto Princesa City 26 A 9 36 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
2. Aborlan 440 D 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
3. Culion 599 D 1 4 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
4. Roxas 449 D 1 1 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
5. Taytay 604 D 1 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
Total/Average 10 40 4

150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00

Quezon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Infanta - Gen. Nakar 229 C 6 95.00 10.00 11.00 13.00 13.00 13.00 195.00 305.00 3/2/1998
2. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
3. Tiaong 151 C 7 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
4. Quezon Metro 17 A 36 16 90.00 9.80 10.00 11.00 11.00 11.00 188.00 288.00 7/27/1999
5. Atimonan 260 D 1 4 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
6. Burdeos 581 D 1 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
7. Calauag 78 C 1 8 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
8. Candelaria 114 C 9 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
9. Catanauan 531 D 1 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
10. Dolores 462 D 1 3 3 80.00 8.80 10.00 11.00 11.00 11.00 168.00 268.00 12/11/1995
11. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
12. Gumaca 79 D 9 180.00 19.00 20.55 22.55 22.65 22.65 370.00 575.50 6/29/1999
13. Macalelon 580 D 3 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
14. Mauban 298 D 5 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
15. Polilio 600 D 2 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
16. San Francisco 842 D 2 90.00 9.80 10.00 11.00 11.00 11.00 188.00 288.00 7/27/1999
17. Tagkawayan 130 C 1 3 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
Total/Average 6 97 51

105.16 11.26 12.09 13.42 13.60 13.60 217.83 338.75

Rizal
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
2. Pililla 487 C 17 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
3. Teresa 536 C 11 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
4. Tanay 88 B 15 2 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
Total/Average 55 2

Romblon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
2. Romblon 64 D 7 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55 2/2/1994
Total/Average 8 1

66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55
Regional Average 17 1638 83

95.85 10.16 10.91 12.09 12.67 12.74 197.52 306.65

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.