Water Districts Rates Data
Region 04
As of 12/31/2005

Batangas
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 162.00 19.50 21.25 23.25 25.50 25.50 357.00 569.50 1/5/2005
2. Lemery 169 C 18 12/31/2005 152,983 6,241 20.43 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
3. Mabini 93 C 27 160.00 18.00 20.25 22.75 25.50 25.50 340.00 542.50 1/22/2001
4. Nasugbu 155 C 7 137.80 14.80 16.50 19.00 20.00 20.00 285.80 450.80 6/7/2005
5. Rosario 111 C 9 160.00 17.00 18.50 20.50 23.00 26.00 330.00 515.00 8/6/2003
6. San Juan 55 C 14 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
7. Taal 516 C 12 1 12/31/2005 68,473 2,846 20.05 158.00 17.20 18.80 20.50 21.20 21.20 330.00 518.00 5/9/2005
8. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
9. Metro Lipa 12 A 493 12/31/2005 1,222,621 41,414 24.60 116.70 12.80 14.50 16.70 19.50 19.50 244.70 389.70 2/13/2001
10. Tanauan 333 B 87 158.00 17.10 19.15 22.20 26.70 26.70 329.00 520.50 7/31/2002
11. Alitagtag 373 C 10 180.20 20.00 22.25 24.75 27.50 27.50 380.20 602.70 1/15/2002
12. Balayan 109 C 10 180.00 21.00 24.25 27.75 31.50 31.50 390.00 632.50 10/5/2004
13. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
14. Lobo 422 C 13 1 220.00 23.00 24.50 26.50 29.00 29.00 450.00 695.00 9/10/2002
15. San Luis 677 D 1 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
16. Taysan 470 C 6 164.60 18.45 19.60 20.65 21.65 21.65 349.10 545.10 6/28/2005
17. Tuy 377 C 6 180.00 19.30 20.20 21.00 22.70 22.70 373.00 575.00 9/21/2005
Total/Average 765 2

1,444,076

50,501

23.83 141.56 15.58 17.24 19.26 21.39 21.58 297.38 469.78

Cavite
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Carmona 561 B 17 12/31/2005 95,020 3,744 21.15 238.60 26.20 29.00 32.60 37.00 37.00 500.60 790.60 3/16/2004
2. Gen. Mariano Alvarez 393 B 29 212.00 22.45 24.25 27.00 30.75 30.75 436.50 679.00 8/31/2000
3. Indang 99 C 15 3 120.00 14.20 15.90 17.40 17.40 17.40 262.00 421.00 6/4/2002
4. Mendez 424 C 10 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
5. Silang 115 A 77 2 132.00 14.00 15.50 14.50 17.50 20.00 272.00 427.00 9/18/2000
6. Tagaytay City 37 B 19 2 202.00 22.90 25.65 28.90 32.40 36.15 431.00 687.50 2/15/2005
7. Tanza 358 B 11 12/31/2005 159,008 5,414 24.47 150.00 15.90 17.10 18.60 20.40 20.40 309.00 480.00 7/31/2000
8. Trece Martires City 574 B 31 130.00 13.95 14.95 16.00 18.00 18.00 269.50 419.00 6/24/2003
9. Amadeo 601 C 16 211.00 26.00 28.00 31.00 35.00 35.00 471.00 751.00 3/15/2005
10. Gen. E. Aguinaldo 555 D 4 2 163.00 17.30 19.70 23.45 27.60 27.60 336.00 533.00 6/3/2003
11. Maragondon 503 C 5 12/31/2005 57,908 2,487 19.40 118.00 13.00 14.50 16.50 19.00 22.00 248.00 393.00 1/1/2005
12. Dasmarinas City 83 A 144 12/31/2005 1,995,002 86,078 19.31 118.00 14.20 17.05 20.00 23.05 23.05 260.00 430.50 12/1/2005
Total/Average 378 9

2,306,938

97,723

19.67 134.17 14.82 16.50 18.20 20.44 21.28 282.44 447.53

Laguna
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
2. Cabuyao 596 C 18 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
3. Pagsanjan 122 C 8 3 200.00 22.00 24.00 26.00 29.00 29.00 420.00 660.00 2/15/2005
4. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
5. Sta. Cruz 127 B 19 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
6. Calamba 29 A 82 1 12/31/2005 871,527 31,411 23.12 115.35 12.60 14.90 19.10 22.70 22.70 241.35 390.35 7/31/2000
7. Laguna 38 A 16 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
8. San Pablo City 4 A 31 6 100.00 11.00 12.15 13.30 14.00 14.00 210.00 331.50 7/19/2005
9. San Pedro 170 B 54 141.90 14.40 15.05 15.40 15.80 15.80 285.90 436.40 3/11/2003
10. Mabitac 668 D 1 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
11. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
Total/Average 251 14

871,527

31,411

23.12 122.55 13.23 14.63 16.38 18.27 18.68 254.88 401.27

Occidental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. San Jose 62 C 20 125.00 13.00 14.00 16.00 18.00 18.00 255.00 395.00 3/5/2002
2. Sablayan 197 C 13 12/31/2005 31,711 1,485 17.80 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
Total/Average 35

31,711

1,485

17.80 137.50 14.00 15.00 17.00 19.50 19.50 277.50 427.50

Oriental Mindoro
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Pinamalayan 327 D 1 3 155.00 16.60 18.20 20.90 23.50 23.50 321.00 503.00 2/13/2001
2. Naujan 245 D 3 170.00 18.55 20.65 23.20 23.20 23.20 355.50 562.00 2/5/2002
3. Pola 96 D 1 92.60 9.90 11.60 13.65 13.65 13.65 191.60 307.60 9/25/2001
4. Roxas 334 D 1 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
Total/Average 1 9

129.40 13.81 15.28 17.23 17.96 17.96 267.52 420.40

Palawan
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Puerto Princesa City 26 A 9 36 12/31/2005 504,905 16,693 18.43 200.00 21.35 23.35 26.00 29.35 29.35 413.50 647.00 8/9/2005
2. Aborlan 440 D 4/30/2001 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
3. Culion 599 D 1 4 110.00 12.00 14.00 17.00 17.00 21.00 230.00 370.00 3/1/2005
4. Roxas 449 D 1 1 180.00 20.50 23.00 25.50 28.00 28.00 385.00 615.00 4/16/2001
5. Taytay 604 D 1 150.00 16.00 17.00 18.00 20.00 20.00 310.00 480.00 2/15/2001
Total/Average 10 40 4

504,905

16,693

18.43 160.00 17.46 19.33 21.62 23.58 24.58 334.62 528.00

Quezon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Infanta - Gen. Nakar 229 C 6 151.00 16.45 18.25 20.65 20.65 20.65 315.50 498.00 6/19/2002
2. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
3. Tiaong 151 C 7 200.00 22.50 25.00 30.00 37.50 37.50 425.00 675.00 8/23/2005
4. Quezon Metro 17 A 36 16 102.50 10.65 11.85 13.00 14.50 14.50 209.00 327.50 7/15/2003
5. Atimonan 260 D 1 4 243.40 29.45 33.35 38.00 43.15 43.15 537.90 871.40 11/15/2005
6. Burdeos 581 D 1 243.40 29.45 33.35 38.00 43.15 43.15 537.90 871.40 11/15/2005
7. Calauag 78 C 1 8 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
8. Candelaria 114 C 9 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
9. Catanauan 531 D 1 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
10. Dolores 462 D 1 3 3 130.00 14.50 16.25 18.50 21.25 21.25 275.00 437.50 4/10/2003
11. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
12. Gumaca 79 D 9 262.00 28.40 30.80 33.85 38.05 38.05 546.00 854.00 2/1/2005
13. Macalelon 580 D 3 322.00 33.50 35.50 38.50 42.50 42.50 657.00 1,012.00 3/1/2005
14. Mauban 298 D 5 4 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
15. Polilio 600 D 2 200.00 21.00 22.50 24.50 27.00 27.00 410.00 635.00 1/20/2004
16. San Francisco 842 D 2 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
17. Tagkawayan 130 C 1 3 171.60 17.95 19.15 20.70 22.45 22.45 351.10 542.60 2/4/2003
Total/Average 6 97 51

155.82 17.12 18.75 21.05 22.97 23.25 327.10 514.64

Rizal
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 12/31/2005 163,758 6,629 20.59 175.00 19.00 20.95 23.00 25.15 27.40 365.00 574.50 5/13/2003
2. Pililla 487 C 17 130.00 13.20 14.75 17.20 18.40 18.40 262.00 409.50 3/19/2002
3. Teresa 536 C 11 12/31/2005 63,670 2,944 18.02 160.00 17.60 19.50 21.85 24.90 24.90 336.00 531.00 9/1/2003
4. Tanay 88 B 15 2 12/31/2005 220,034 8,706 21.06 188.00 19.80 22.20 26.50 33.40 33.40 386.00 608.00 6/1/2001
Total/Average 55 2

447,462

18,279

20.40 180.80 19.42 21.53 24.36 27.72 28.17 375.00 590.30

Romblon
Water District CCC Category Surface Wells Springs As of Production m3/month Service Conn. Ave. Consumption m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 115.00 11.65 14.80 19.00 23.65 23.65 231.50 379.50 2/8/2005
2. Romblon 64 D 7 113.00 13.00 14.00 16.00 19.00 19.00 243.00 383.00 7/24/2004
Total/Average 8 1

106.50 11.80 13.72 16.62 20.25 20.25 224.50 361.75
Regional Average 17 1638 83 5,606,619

216,092

21.1 142.45 15.52 17.15 19.19 21.26 21.63 297.69 469.22

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.