Water District | CCC | Category | Surface | Wells | Springs | As of | Production m3/month | Service Conn. | Ave. Consumption m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Metro Cotabato | 30 | A | 1 | 8 | 1 | 127.90 | 14.15 | 16.35 | 18.55 | 20.85 | 20.85 | 269.40 | 432.90 | 6/1/1998 | ||||
Total/Average | 1 | 9 | 1 |
|
| 127.90 | 14.15 | 16.35 | 18.55 | 20.85 | 20.85 | 269.40 | 432.90 |
Water District | CCC | Category | Surface | Wells | Springs | As of | Production m3/month | Service Conn. | Ave. Consumption m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Kabacan | 194 | C | 8 | 138.60 | 14.35 | 15.40 | 17.15 | 19.15 | 19.15 | 282.10 | 436.10 | 2/13/2001 | ||||||
2. Metro Midsayap | 174 | C | 1 | 20 | 164.60 | 18.10 | 20.40 | 22.70 | 25.55 | 25.55 | 345.60 | 549.60 | 10/2/2001 | |||||
3. Metro Kidapawan | 41 | A | 1 | 4 | 9 | 156.60 | 17.95 | 20.30 | 22.65 | 25.00 | 27.35 | 336.10 | 539.10 | 12/18/2001 | ||||
4. Aleosan | 755 | D | 3 | 139.15 | 15.30 | 17.60 | 21.10 | 26.40 | 26.40 | 292.15 | 468.15 | 4/13/1999 | ||||||
5. Mlang | 209 | C | 7 | 156.80 | 16.90 | 18.10 | 19.40 | 20.90 | 20.90 | 325.80 | 506.80 | 3/20/2001 | ||||||
6. Pigcawayan | 477 | D | 7 | 176.65 | 18.85 | 20.05 | 21.25 | 22.45 | 22.45 | 365.15 | 565.65 | 4/27/1999 | ||||||
7. Pikit | 495 | D | 5 | 160.50 | 17.25 | 18.75 | 20.55 | 22.65 | 22.65 | 333.00 | 520.50 | 7/24/2001 | ||||||
8. Tulunan | 590 | D | 1 | 160.50 | 17.25 | 18.75 | 20.55 | 22.65 | 22.65 | 333.00 | 520.50 | 7/24/2001 | ||||||
Total/Average | 2 | 60 | 10 |
|
| 123.80 | 12.53 | 13.65 | 14.85 | 16.20 | 16.20 | 249.14 | 385.72 |
Water District | CCC | Category | Surface | Wells | Springs | As of | Production m3/month | Service Conn. | Ave. Consumption m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Glan | 439 | D | 5 | 66.55 | 7.40 | 7.80 | 9.35 | 9.35 | 9.35 | 140.55 | 218.55 | 2/2/1994 | ||||||
2. Maasim | 444 | D | 2 | 2 | 80.00 | 8.50 | 9.00 | 9.50 | 10.00 | 10.00 | 165.00 | 255.00 | 3/10/1997 | |||||
3. Malungon | 592 | D | 2 | 80.00 | 8.50 | 9.00 | 9.50 | 10.00 | 10.00 | 165.00 | 255.00 | 3/10/1997 | ||||||
Total/Average | 7 | 4 |
|
|
Water District | CCC | Category | Surface | Wells | Springs | As of | Production m3/month | Service Conn. | Ave. Consumption m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. City of Koronadal | 156 | B | 23 | 119.30 | 14.60 | 17.30 | 20.05 | 22.85 | 22.85 | 265.30 | 438.30 | 2/8/2000 | ||||||
2. Gen. Santos City | 370 | A | 33 | 212.00 | 23.05 | 26.65 | 30.50 | 34.50 | 34.50 | 442.50 | 709.00 | 3/12/2001 | ||||||
3. Polomolok | 153 | B | 17 | 1 | 108.75 | 13.05 | 16.70 | 17.80 | 19.30 | 19.30 | 239.25 | 406.25 | 11/14/1994 | |||||
4. Banga | 230 | D | 2 | 108.00 | 11.75 | 13.00 | 14.60 | 16.50 | 18.75 | 225.50 | 355.50 | 10/5/1999 | ||||||
5. Norala | 213 | D | 2 | 162.00 | 17.30 | 19.45 | 21.60 | 23.75 | 23.75 | 335.00 | 529.50 | 5/16/2000 | ||||||
6. Sto. Nino | 648 | D | 1 | 108.75 | 13.05 | 16.70 | 17.80 | 19.30 | 19.30 | 239.25 | 406.25 | 11/14/1994 | ||||||
7. Surallah | 500 | C | 12 | 1 | 156.00 | 16.80 | 18.95 | 21.15 | 23.40 | 23.40 | 324.00 | 513.50 | 6/26/2000 | |||||
8. Tupi | 280 | D | 6 | 2 | 154.00 | 16.35 | 17.30 | 18.30 | 19.30 | 19.30 | 317.50 | 490.50 | 11/9/1999 | |||||
Total/Average | 96 | 4 |
|
| 117.31 | 12.96 | 14.98 | 16.15 | 17.45 | 17.45 | 246.98 | 396.81 |
Water District | CCC | Category | Surface | Wells | Springs | As of | Production m3/month | Service Conn. | Ave. Consumption m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Sultan Kudarat | 247 | B | 17 | 152.40 | 16.80 | 18.80 | 20.85 | 22.95 | 22.95 | 320.40 | 508.40 | 2/15/2000 | ||||||
2. Kalamansig | 376 | D | 1 | 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 | 2/8/2000 | ||||||
3. Lebak | 499 | D | 2 | 1 | 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 | 2/8/2000 | |||||
Total/Average | 19 | 2 |
| 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 | |||||||
Regional Average | 3 | 191 | 21 |
| 127.15 | 13.47 | 15.06 | 16.47 | 17.12 | 18.03 | 261.92 | 412.60 |
Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.