Water Districts Rates Data
Regional Averages
As of 6/30/2005

Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
01 40 3 389 18 1,083,700 40,632 168,216 22.12 164.21 17.81 19.34 21.24 23.17 23.17 342.34 535.76
02 22 5 218 9 751,747 27,895 115,485 22.46 165.18 18.40 20.19 22.48 24.27 24.27 349.24 551.17
03 77 31 1,343 8 4,956,641 183,723 760,613 22.85 138.52 14.77 16.02 17.63 19.12 20.65 286.29 446.58
04 69 17 1,638 83 5,991,304 210,862 872,969 23.41 136.63 14.85 16.42 18.39 20.25 20.73 285.17 449.39
05 37 31 201 101 246,129 8,853 36,651 23.17 137.70 15.64 17.31 19.57 21.77 21.93 294.14 467.30
06 57 18 338 39 1,518,818 50,665 209,753 24.90 159.00 18.54 20.73 23.39 25.29 25.50 344.40 551.80
07 13 19 320 67 3,755,367 104,888 434,236 31.28 123.40 14.15 16.00 20.26 22.53 23.45 264.96 425.02
08 27 14 74 34 92,948 3,710 15,359 20.88 147.90 16.30 17.96 20.08 22.31 22.41 311.00 490.61
09 13 5 76 30 258,977 9,247 38,283 17.45 147.02 18.17 20.02 22.26 23.55 23.94 328.79 529.06
10 18 11 167 78 2,746,334 82,169 340,180 27.85 115.49 13.84 16.10 18.40 20.37 20.89 253.89 414.93
11 16 9 257 11 63,546 2,367 9,799 22.37 146.31 15.68 17.49 19.63 21.99 22.21 303.19 478.11
12 20 3 191 21 1,069,056 41,254 170,792 21.60 157.12 17.38 19.52 21.60 23.40 24.02 330.97 526.24
ARMM 7 5 13 20 110.45 11.72 13.41 16.01 17.15 17.15 227.74 361.88
CAR 6 1 100 8 668,155 27,210 112,649 20.46 143.50 16.30 18.80 22.55 23.54 23.54 306.50 494.58
CARAGA 18 32 69 38 49,861 2,690 11,137 15.45 142.55 17.20 20.06 23.42 26.78 27.69 314.63 515.30
Total/Average 440 204 5,394 565 23,252,583 796,165 3,296,123 24.46 144.83 16.16 17.93 20.16 22.06 22.59 306.51 485.82

Water Districts Rates Data
Provincial Averages
As of 6/30/2005

Province Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Abra CAR 3 5 1 133.66 16.00 17.58 19.50 21.41 21.41 293.66 469.50
Agusan Del Norte CARAGA 3 1 19 1 26,654 1,317 5,452 16.87 146.00 19.31 21.63 24.78 28.06 30.06 339.16 555.50
Agusan Del Sur CARAGA 4 10 14 16 126.25 13.65 15.40 17.45 19.47 20.60 262.75 416.75
Aklan 06 6 2 28 350,897 13,006 53,845 22.48 152.76 17.30 19.59 22.61 24.57 24.57 325.85 521.76
Albay 05 6 1 46 22 137.18 15.02 16.88 19.60 22.08 22.41 287.43 456.26
Antique 06 8 14 8 47,577 2,258 9,348 15.67 120.61 14.48 16.57 18.85 19.31 19.31 265.42 431.17
Aurora 03 2 1 1 127.00 13.05 14.10 14.67 14.67 14.67 257.50 398.50
Basilan ARMM 3 5 3 12 104.66 10.73 11.83 13.30 14.60 14.60 212.00 330.33
Bataan 03 9 194 5 346,001 9,873 40,874 31.34 104.44 11.17 12.28 13.76 15.12 15.40 216.22 339.11
Batangas 04 16 765 2 1,590,286 49,206 203,713 26.93 136.60 15.03 16.64 18.57 20.64 21.01 286.98 453.41
Benguet CAR 2 1 92 7 668,155 27,210 112,649 20.46 170.00 18.85 23.95 32.20 32.20 32.20 358.50 598.00
Biliran 08 1 1 3 64.60 8.90 9.70 10.55 11.50 12.65 153.60 250.60
Bohol 07 2 1 9 5 125.00 13.95 15.37 17.32 19.35 19.35 264.50 418.25
Bukidnon 10 5 10 59 35 446,900 17,224 71,307 21.62 123.68 15.43 19.09 23.02 26.60 27.59 277.98 468.88
Bulacan 03 21 17 505 2,586,333 104,819 433,951 20.61 140.85 15.28 16.97 19.30 21.44 23.95 293.73 463.47
Cagayan 02 9 3 70 7 551,688 21,120 87,437 21.77 155.44 17.18 18.40 19.73 21.23 21.23 327.33 511.33
Camarines Norte 05 3 6 13 8 178.00 19.96 22.11 25.86 29.91 29.91 377.66 598.83
Camarines Sur 05 13 8 80 52 145.21 16.98 18.70 20.92 23.68 23.75 315.02 502.06
Camiguin 10 1 12 45.00 4.65 5.40 6.30 7.90 9.90 91.50 145.50
Capiz 06 6 3 11 5 175.83 21.91 24.50 27.05 28.82 28.82 395.00 640.00
Catanduanes 05 5 15 7 5 169,291 4,956 20,518 28.47 91.80 10.19 11.02 12.27 12.89 12.89 193.70 303.90
Cavite 04 11 378 9 2,434,089 95,580 395,701 21.22 136.86 15.07 16.75 18.51 20.86 21.70 287.59 455.18
Cebu 07 5 6 258 34 3,712,204 102,989 426,374 31.51 108.02 11.52 13.13 19.88 21.66 21.66 223.26 354.60
Compostela Valley 11 1 18 156.50 16.55 19.45 24.05 29.75 29.75 322.00 516.50
Davao (Del Norte) 11 6 9 67 4 63,546 2,367 9,799 22.37 164.33 17.43 18.89 21.00 23.29 23.89 338.66 527.58
Davao Del Sur 11 5 127 6 138.58 15.36 17.61 19.94 23.13 23.13 292.18 468.28
Davao Oriental 11 4 45 1 126.40 13.26 14.75 16.08 16.67 16.67 259.05 406.62
Eastern Samar 08 6 1 13 5 165.66 18.00 19.56 21.56 23.65 23.65 345.66 541.33
Guimaras 08 2 28 6 144.87 18.67 23.45 31.67 34.42 34.42 331.62 566.12
Ifugao CAR 1 3 120.00 12.10 12.20 12.40 12.60 12.60 241.00 363.00
Ilocos Norte 01 5 78 4 325,906 13,639 56,465 19.91 173.03 18.77 20.58 22.85 24.89 24.89 360.73 566.53
Ilocos Sur 01 5 2 29 2 167.90 19.64 21.25 22.72 23.88 23.88 364.30 576.80
Iloilo 06 18 10 89 2 173.34 19.32 21.05 23.16 25.09 24.80 366.56 577.13
Isabela 02 12 140 200,059 6,775 28,049 24.61 174.41 19.52 21.73 24.76 26.75 26.75 369.61 586.99
La Union 01 5 49 9 165.25 17.66 19.12 21.59 23.16 23.16 341.85 533.05
Laguna 04 9 251 14 937,996 30,783 127,442 25.39 114.53 12.27 13.65 15.53 17.08 17.48 237.31 373.81
Lanao Del Norte 10 6 27 8 102.45 12.05 13.15 14.13 14.22 14.22 222.99 354.50
Lanao Del Sur ARMM 2 3 6 92.00 10.20 11.90 13.90 14.20 14.20 194.00 313.00
Leyte 08 9 8 24 15 139.99 15.91 17.99 20.27 22.67 22.77 299.10 479.05
Maguindanao ARMM 1 1 9 1 597,941 20,896 86,509 23.85 160.00 17.70 20.45 23.20 26.05 26.05 337.00 541.50
Masbate 05 2 8 201.50 24.30 25.90 27.60 29.65 29.65 444.50 703.50
Misamis Occidental 10 2 1 25 5 132.00 14.30 16.50 18.42 19.55 20.80 275.00 440.00
Misamis Oriental 10 4 56 18 2,299,434 64,945 268,872 29.50 134.20 16.60 19.27 22.06 25.33 25.33 300.20 492.95
Negros Occidental 06 17 3 168 18 1,120,344 35,401 146,560 26.37 159.80 18.85 21.12 23.79 26.24 27.25 348.30 559.54
Negros Oriental 07 5 12 46 26 43,163 1,899 7,862 18.94 143.03 16.76 19.07 22.19 25.51 27.89 310.65 501.35
North Cotabato 12 7 2 60 10 75,829 3,483 14,420 18.14 163.44 18.26 20.30 22.40 24.67 25.00 346.08 549.08
Northern Samar 08 5 1 16 2 164.00 16.96 18.15 19.87 21.99 21.99 333.60 515.10
Nueva Ecija 03 16 9 211 1 190,413 6,296 26,065 25.38 161.93 16.93 18.02 19.42 20.89 22.55 331.31 511.52
Occidental Mindoro 04 2 35 29,401 1,456 6,028 16.83 137.50 14.00 15.00 17.00 19.50 19.50 277.50 427.50
Oriental Mindoro 04 4 1 9 123.40 13.17 14.53 16.35 17.07 17.07 255.15 400.52
Palawan 04 4 10 40 4 480,415 15,869 65,698 21.66 147.50 16.12 17.75 19.87 21.75 22.75 308.75 486.25
Pampanga 03 10 236 945,992 33,417 138,346 25.19 123.95 13.30 14.43 15.74 16.61 17.59 257.00 401.35
Pangasinan 01 25 1 233 3 757,795 26,993 111,751 23.24 161.51 17.28 18.75 20.56 22.68 22.68 334.37 521.95
Quezon 04 14 6 97 51 146.43 16.03 17.58 19.68 21.06 21.63 306.79 482.68
Quirino 02 1 1 6 142.00 16.00 17.80 19.80 21.90 21.90 302.00 480.00
Rizal 04 5 55 2 519,117 17,968 74,388 24.08 170.60 18.33 20.31 22.95 26.04 26.42 353.90 557.00
Romblon 04 2 8 1 95.00 10.30 12.22 15.12 17.75 17.75 198.00 320.25
Sarangani 12 2 7 4 133.35 14.40 16.17 17.95 20.87 20.87 277.35 439.10
Siquijor 07 1 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00
Sorsogon 05 8 1 47 14 76,838 3,897 16,134 16.43 123.50 13.56 15.37 17.56 18.96 19.33 259.12 412.87
South Cotabato 12 7 96 4 395,286 16,875 69,863 19.52 146.96 16.35 18.69 20.72 22.85 22.85 310.46 497.39
Southern Leyte 08 2 10 6 110.00 12.55 14.62 17.60 21.60 21.60 235.50 381.75
Sultan Kudarat 12 3 19 2 180.96 19.63 21.60 23.66 22.53 25.86 377.30 593.30
Sulu ARMM 1 1 2 145.20 14.00 17.50 26.20 28.70 28.70 285.20 460.20
Surigao Del Norte CARAGA 4 14 8 7 144.05 18.17 22.58 27.36 32.22 33.66 325.80 551.67
Surigao Del Sur CARAGA 7 6 28 10 23,207 1,373 5,684 14.09 149.52 17.78 20.62 24.00 27.31 27.31 327.38 533.60
Tarlac 03 9 1 113 843,916 27,218 112,683 25.32 147.22 15.73 17.08 18.66 20.47 22.61 304.61 475.50
Tawi Tawi ARMM 1 6 130.00 15.50 17.10 18.20 19.20 19.20 285.00 456.00
Western Samar 08 4 4 10 3 92,948 3,710 15,359 20.88 158.75 17.58 18.97 21.30 22.98 23.15 334.62 524.37
Zambales 03 12 4 83 1 43,986 2,100 8,694 17.45 134.41 14.20 15.06 16.06 16.78 17.34 276.45 427.08
Zamboanga Del Norte 09 8 5 30 9 258,977 9,247 38,283 17.45 155.82 20.06 21.96 24.34 25.75 25.98 356.45 576.13
Zamboanga Del Sur 09 4 35 20 126.18 14.67 16.55 18.58 19.37 20.21 272.93 438.43
Zamboanga Sibugay 09 1 11 1 160.00 17.10 18.40 20.40 22.60 22.60 331.00 515.00
Total/Average 440 204 5,394 565 23,252,583 796,165 3,296,123 24.46 144.83 16.16 17.93 20.16 22.06 22.59 306.51 485.82

Abra - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bucay 642 D 1
2. Dolores 456 D 1 267.00 28.00 30.00 32.10 34.45 34.45 547.00 847.00 10/5/2004
3. Lagangilang 442 D 1 267.00 28.00 30.00 32.10 34.45 34.45 547.00 847.00 10/5/2004
4. Metro Bangued 28 B 1 185.00 22.25 26.15 31.00 36.35 36.35 407.50 669.00 12/14/2004
5. Pilar 662 D 185.00 22.25 26.15 31.00 36.35 36.35 407.50 669.00 12/14/2004
6. Sal-Lapadan 688 D 185.00 22.25 26.15 31.00 36.35 36.35 407.50 669.00 12/14/2004
7. San Isidro 692 D 185.00 22.25 26.15 31.00 36.35 36.35 407.50 669.00 12/14/2004
8. San Juan 453 D 1 210.00 22.50 25.00 28.00 33.00 33.00 435.00 685.00 2/22/2005
Total/Average 5 1 133.66 16.00 17.58 19.50 21.41 21.41 293.66 469.50

Agusan del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 406 C 5 6/30/2005 26,654 1,317 6,585 16.87 175.00 20.40 23.50 27.00 31.00 31.00 379.00 614.00 10/25/2000
2. Butuan City 7 A 1 7 105.00 19.30 21.00 24.65 28.00 34.00 298.00 508.00 9/25/2001
3. Las Nieves 871 D 1 105.00 19.30 21.00 24.65 28.00 34.00 298.00 508.00 9/25/2001
4. Nasipit 211 C 6 1 209.00 24.15 26.95 30.00 33.35 33.35 450.50 720.00 12/14/2004
Total/Average 1 19 1 26,654 1,317 5,452 16.87 146.00 19.31 21.63 24.78 28.06 30.06 339.16 555.50

Agusan del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bayugan 243 C 9 5 204.80 22.40 24.95 28.15 32.00 36.45 428.80 678.30 11/20/2001
2. Bunawan 549 D 4 2 193.00 20.00 21.00 22.50 24.30 24.30 393.00 603.00 12/14/2004
3. Prosperidad 66 D 1 171.00 18.25 21.75 25.90 30.40 30.40 353.50 571.00 12/10/2002
4. San Francisco 399 C 10 8 151.00 16.80 18.95 21.30 23.75 26.50 319.00 508.50 12/14/2004
5. Sibagat 682 D 1 151.00 16.80 18.95 21.30 23.75 26.50 319.00 508.50 12/14/2004
Total/Average 10 14 16 126.25 13.65 15.40 17.45 19.47 20.60 262.75 416.75

Aklan - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ibajay 434 D 5 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
2. Libacao 364 D 1 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
3. Madalag 669 D 4 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
4. Malay (Caticlan) 559 D 1 208.00 23.10 25.75 28.90 32.60 32.60 439.00 696.50 6/3/2003
5. Malinao 258 D 1 154.00 15.40 18.50 24.65 24.65 24.65 308.00 493.00 10/23/2001
6. Metro Kalibo 73 B 1 14 6/30/2005 350,897 13,006 65,030 22.48 205.00 21.35 22.50 23.95 25.50 25.50 418.50 643.50 11/12/2002
7. Numancia 259 D 2 205.00 21.35 22.50 23.95 25.50 25.50 418.50 643.50 11/12/2002
Total/Average 2 28 350,897 13,006 53,845 22.48 152.76 17.30 19.59 22.61 24.57 24.57 325.85 521.76

Albay - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacacay 135 D 2 1 168.00 17.65 19.80 22.65 26.85 26.85 344.50 542.50 2/3/2004
2. Camalig 125 C 2 4 230.60 24.05 25.30 27.00 27.00 29.00 471.10 724.10 7/24/2001
3. Daraga 172 C 12 5 180.00 19.90 22.80 24.35 28.10 28.10 379.00 607.00 2/3/2004
4. Legazpi City 173 B 1 14 3 122.00 13.50 15.10 16.95 19.10 19.10 257.00 408.00 2/10/2004
5. Ligao City 149 C 9 5 56.00 6.75 8.65 11.15 14.25 14.25 123.50 210.00 4/5/2005
6. Tabaco 13 B 7 4 136.00 16.20 19.35 26.05 30.50 30.50 298.00 491.50 12/21/2004
Total/Average 1 46 22 137.18 15.02 16.88 19.60 22.08 22.41 287.43 456.26

Antique - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barbaza 497 D 2 122.00 14.00 15.25 16.50 16.50 16.50 262.00 414.50 8/18/2001
2. Belison 602 D 1 122.00 14.00 15.25 16.50 16.50 16.50 262.00 414.50 8/18/2001
3. Bugasong 348 D 3 1 217.00 22.85 23.80 25.20 27.60 27.60 445.50 683.50 3/8/2005
4. Culasi 274 D 1 1 86.00 9.30 11.20 13.70 13.70 13.70 179.00 291.00 8/19/1996
5. Hamtic 267 D 1 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
6. Pandan 523 C 3 6/30/2005 47,577 2,258 11,290 15.67 128.90 14.15 14.85 15.50 15.50 15.50 270.40 418.90 7/1/2004
7. Patnongon 296 D 2 128.90 14.15 14.85 15.50 15.50 15.50 270.40 418.90 7/1/2004
8. Sibalom 249 D 5 142.00 18.35 22.75 27.35 32.10 32.10 325.50 553.00 11/20/2001
9. Tobias Fornier 257 D 1 1 142.00 18.35 22.75 27.35 32.10 32.10 325.50 553.00 11/20/2001
Total/Average 14 8 47,577 2,258 9,348 15.67 120.61 14.48 16.57 18.85 19.31 19.31 265.42 431.17

Aurora - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baler 233 D 1 79.00 8.00 8.80 8.80 8.80 8.80 159.00 247.00 5/1/1995
2. Dipaculao 408 D 1 200.00 21.50 23.25 25.25 27.50 27.50 415.00 647.50 3/16/2004
Total/Average 1 1 127.00 13.05 14.10 14.67 14.67 14.67 257.50 398.50

Basilan - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Isabela City 330 C 4 3 5 118.00 13.00 14.40 15.90 17.70 17.70 248.00 392.00 5/17/2005
2. Lamitan City 269 C 3 125.00 13.50 15.00 18.00 22.00 22.00 260.00 410.00 4/17/2002
3. Maluso 512 D 1 4 143.00 14.50 15.60 16.70 17.80 17.80 288.00 444.00 2/10/2004
Total/Average 5 3 12 104.66 10.73 11.83 13.30 14.60 14.60 212.00 330.33

Bataan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bagac 272 D 14 158.00 18.20 20.80 25.10 28.80 28.80 340.00 548.00 12/1/1997
2. Balanga City 124 B 47 1 72.00 7.75 8.50 9.50 10.75 10.75 149.50 234.50 5/25/1998
3. Dinalupihan 409 B 21 1 145.00 15.20 16.30 17.40 18.85 20.30 297.00 460.00 9/25/2000
4. Hermosa 286 C 11 165.00 18.25 19.25 20.50 22.00 23.75 347.50 540.00 12/11/2000
5. Limay 379 B 27 85.00 8.70 9.20 9.60 10.00 10.00 172.00 264.00 2/12/1996
6. Mariveles 48 B 31 6/30/2005 346,001 9,873 49,365 31.34 65.00 7.00 8.10 9.75 11.50 11.50 135.00 216.00 11/17/1997
7. Morong 264 D 3 85.00 9.00 10.20 11.50 11.50 11.50 175.00 277.00 1/27/1996
8. Orani 54 B 14 3 135.00 14.25 15.50 17.00 18.50 18.50 277.50 432.50 6/23/1997
9. Orion 527 C 26 70.00 7.50 8.25 9.25 10.50 10.50 145.00 227.50 3/3/1997
Total/Average 194 5 346,001 9,873 40,874 31.34 104.44 11.17 12.28 13.76 15.12 15.40 216.22 339.11

Batangas - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 162.00 19.50 21.25 23.25 25.50 25.50 357.00 569.50 1/5/2005
2. Alitagtag 373 C 10 180.20 20.00 22.25 24.75 27.50 27.50 380.20 602.70 1/15/2002
3. Balayan 109 C 10 180.00 21.00 24.25 27.75 31.50 31.50 390.00 632.50 10/5/2004
4. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
5. Lemery 169 C 18 6/30/2005 167,344 6,127 30,635 22.76 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
6. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
7. Lobo 422 C 13 1 220.00 23.00 24.50 26.50 29.00 29.00 450.00 695.00 9/10/2002
8. Mabini 93 C 27 160.00 18.00 20.25 22.75 25.50 25.50 340.00 542.50 1/22/2001
9. Metro Lipa 12 A 493 6/30/2005 1,341,361 40,255 201,275 27.77 116.70 12.80 14.50 16.70 19.50 19.50 244.70 389.70 2/13/2001
10. Nasugbu 155 C 7 137.80 14.80 16.50 19.00 20.00 20.00 285.80 450.80 6/7/2005
11. Rosario 111 C 9 160.00 17.00 18.50 20.50 23.00 26.00 330.00 515.00 8/6/2003
12. San Juan 55 C 14 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
13. San Luis 677 D 1 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
14. Taal 516 C 12 1 6/30/2005 81,581 2,824 14,120 24.07 158.00 17.20 18.80 20.50 21.20 21.20 330.00 518.00 5/9/2005
15. Tanauan 333 B 87 158.00 17.10 19.15 22.20 26.70 26.70 329.00 520.50 7/31/2002
16. Taysan 470 C 6 164.60 18.45 19.60 20.65 21.65 21.65 349.10 545.10 6/28/2005
17. Tuy 377 C 6 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
Total/Average 765 2 1,590,286 49,206 203,713 26.93 136.60 15.03 16.64 18.57 20.64 21.01 286.98 453.41

Benguet - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baguio City 18 A 1 69 4 6/30/2005 668,155 27,210 136,050 20.46 210.00 23.10 26.35 29.85 29.85 29.85 441.00 704.50 7/2/2003
2. La Trinidad 100 B 23 3 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50 8/21/1996
Total/Average 1 92 7 668,155 27,210 112,649 20.46 170.00 18.85 23.95 32.20 32.20 32.20 358.50 598.00

Biliran - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Culaba 872 D 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50 8/21/1996
2. Naval 118 C 1 3 64.60 8.90 9.70 10.55 11.50 12.65 153.60 250.60 10/25/2000
Total/Average 1 3 64.60 8.90 9.70 10.55 11.50 12.65 153.60 250.60

Bohol - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Clarin 398 D 5 132.00 14.00 14.85 16.00 17.25 17.25 272.00 420.50 2/15/2000
2. Talibon 80 D 1 9 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
Total/Average 1 9 5 125.00 13.95 15.37 17.32 19.35 19.35 264.50 418.25

Bukidnon - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabanglasan 620 D 2 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
2. Damulog 639 D 1 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
3. Don Carlos 248 D 1 9 4 231.00 33.60 44.35 55.40 66.65 66.65 567.00 1,010.50 6/7/2004
4. Kibawe 400 D 4 105.00 11.00 12.75 14.50 15.50 15.50 215.00 342.50 7/7/1997
5. Lantapan 870 D 2 105.00 11.00 12.75 14.50 15.50 15.50 215.00 342.50 7/7/1997
6. Malaybalay City 33 B 5 12 1 6/30/2005 217,438 7,305 36,525 24.80 75.00 10.00 11.30 12.20 12.80 13.20 175.00 288.00 11/11/1996
7. Manolo Fortich 401 C 1 10 15 75.00 10.00 11.30 12.20 12.80 13.20 175.00 288.00 11/11/1996
8. Maramag 496 C 7 4 138.00 15.20 20.25 26.25 33.65 33.65 290.00 492.50 9/11/1999
9. Quezon 627 D 3 2 138.00 15.20 20.25 26.25 33.65 33.65 290.00 492.50 9/11/1999
10. Valencia City 141 B 13 8 6/30/2005 229,462 9,919 49,595 19.28 166.00 18.90 21.70 25.50 29.90 35.15 355.00 572.00 5/24/2005
Total/Average 10 59 35 446,900 17,224 71,307 21.62 123.68 15.43 19.09 23.02 26.60 27.59 277.98 468.88

Bulacan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angat 292 B 1 16 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
2. Balagtas 362 D 6 1/31/2005 51,073 2,126 10,630 20.02 160.00 16.15 16.55 17.10 17.75 18.55 321.50 487.00 3/12/2001
3. Baliwag 407 A 32 95.00 11.00 12.25 13.75 15.50 17.50 205.00 327.50 9/25/2000
4. Bocaue 86 C 2 25 160.00 17.25 19.50 23.00 26.75 31.00 332.50 527.50 7/10/2000
5. Bulacan 378 B 2 23 105.00 12.00 12.75 13.75 15.00 16.50 225.00 352.50 7/24/2001
6. Bustos 369 B 8 110.00 11.00 12.10 14.30 14.30 14.30 220.00 341.00 6/18/1999
7. Calumpit 140 B 22 110.00 11.85 13.20 15.70 16.70 16.70 228.50 360.50 7/6/1999
8. City of Malolos 288 A 76 6/30/2005 772,487 30,089 150,445 21.39 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
9. Guiguinto 385 C 25 160.00 17.00 18.25 19.75 21.50 23.50 330.00 512.50 8/22/2001
10. Hagonoy 31 B 52 90.00 10.00 11.00 12.00 12.00 12.00 190.00 300.00 7/10/2000
11. Marilao 227 B 2 33 150.00 18.00 21.15 24.45 27.90 31.50 330.00 541.50 4/10/2002
12. Meycauayan City 251 B 1 22 6/30/2005 322,149 12,697 63,485 21.14 317.60 46.20 48.50 54.35 61.70 70.45 779.60 1,264.60 5/21/2002
13. Norzagaray 261 B 2 5 175.00 18.15 19.40 21.10 23.20 22.55 356.50 550.50 5/25/1998
14. Obando 186 C 2 4 367.00 40.95 49.15 61.65 78.40 99.25 776.50 1,268.00 4/26/2005
15. Pandi 271 C 1 19 195.00 19.50 21.75 24.25 27.00 30.00 390.00 607.50 5/17/2005
16. Plaridel 277 B 9 80.00 8.50 9.50 10.60 11.80 13.10 165.00 260.00 7/24/2001
17. San Ildefonso 273 C 18 6/30/2005 87,513 3,653 18,265 22.58 110.00 12.00 13.25 14.75 16.50 18.50 230.00 362.50 4/13/1999
18. San Jose del Monte City 123 A 2 43 6/30/2005 1,077,603 46,349 231,745 19.37 234.00 25.80 28.35 31.05 33.90 33.90 492.00 775.50 3/24/2004
19. San Miguel 132 B 20 6/30/2005 110,840 3,613 18,065 24.44 119.00 12.20 13.15 15.40 17.90 20.75 241.00 372.50 5/18/1999
20. San Rafael 528 B 23 190.00 20.71 22.35 24.25 26.43 28.89 397.10 620.60 2/10/2004
21. Santa Maria 310 A 2 23 6/30/2005 164,667 6,292 31,460 21.81 155.00 16.60 18.05 19.90 22.50 25.45 321.00 501.50 9/11/2001
Total/Average 17 505 2,586,333 104,819 433,951 20.61 140.85 15.28 16.97 19.30 21.44 23.95 293.73 463.47

Cagayan - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abulug 625 D 4 155.00 16.60 18.05 19.90 22.50 25.45 321.00 501.50 9/11/2001
2. Amulung 657 D 2 155.00 16.60 18.05 19.90 22.50 25.45 321.00 501.50 9/11/2001
3. Aparri 68 D 1 7 240.00 25.50 25.00 25.50 26.00 26.00 495.00 745.00 3/8/2005
4. Calayan 626 D 240.00 25.50 25.00 25.50 26.00 26.00 495.00 745.00 3/8/2005
5. Claveria 203 D 4 155.00 17.05 18.90 21.00 23.25 23.25 325.50 514.50 8/14/2000
6. Gattaran 239 D 1 3 194.00 20.00 20.70 21.50 22.50 22.50 394.00 601.00 2/19/2002
7. Gonzaga 214 D 3 271.00 28.30 29.35 30.75 32.40 32.40 554.00 847.50 12/14/2004
8. Lal-lo 302 D 1 4 224.00 23.75 25.10 27.05 29.70 29.70 461.50 712.50 3/1/2005
9. Lasam 374 D 1 224.00 23.75 25.10 27.05 29.70 29.70 461.50 712.50 3/1/2005
10. Metropolitan Tuguegarao 65 A 30 6 6/30/2005 551,688 21,120 105,600 21.77 65.00 7.20 8.10 9.15 9.15 9.15 137.00 218.00 3/3/1997
11. Penablanca 458 D 4 170.00 19.20 22.15 25.50 29.55 29.55 362.00 583.50 6/27/2001
12. Sanchez Mira 534 D 3 190.00 19.70 20.40 21.15 22.10 22.10 387.00 591.00 9/21/2004
13. Santa Ana 585 D 5 190.00 19.70 20.40 21.15 22.10 22.10 387.00 591.00 9/21/2004
14. Santa Praxedes 645 D 190.00 19.70 20.40 21.15 22.10 22.10 387.00 591.00 9/21/2004
Total/Average 3 70 7 551,688 21,120 87,437 21.77 155.44 17.18 18.40 19.73 21.23 21.23 327.33 511.33

Camarines Norte - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camarines Norte 9 B 1 7 6 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
2. Jose Panganiban 575 D 1 4 2 230.00 24.40 26.55 29.45 33.05 33.05 474.00 739.50 2/4/2003
3. Paracale 167 D 4 2 158.00 18.00 20.80 27.65 34.70 34.70 338.00 546.00 12/20/2000
Total/Average 6 13 8 178.00 19.96 22.11 25.86 29.91 29.91 377.66 598.83

Camarines Sur - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baao 313 C 8 176.00 18.20 19.20 20.80 23.20 23.20 358.00 550.00 7/31/2000
2. Balatan 445 D 120.00 15.60 17.20 19.05 21.20 21.20 276.00 448.00 9/25/2001
3. Bato 437 D 1 145.00 16.80 18.80 21.40 25.05 25.05 313.00 501.00 1/20/2004
4. Bombon 867 D 1 145.00 16.80 18.80 21.40 25.05 25.05 313.00 501.00 1/20/2004
5. Cabusao 813 D 1 145.00 16.80 18.80 21.40 25.05 25.05 313.00 501.00 1/20/2004
6. Calabanga 314 C 6 5 214.00 22.40 23.90 25.90 28.40 28.40 438.00 677.00 2/17/2004
7. Del Gallego 576 D 4 1 178.00 21.40 25.50 30.75 36.45 36.45 392.00 647.00 5/24/2005
8. Iriga City 91 C 9 3 111.80 12.10 13.15 14.35 16.30 16.30 232.80 364.30 2/13/2001
9. Libmanan 606 C 2 1 111.80 12.10 13.15 14.35 16.30 16.30 232.80 364.30 2/13/2001
10. Metro Naga 106 A 4 32 4 125.00 14.40 15.50 16.60 17.70 18.95 269.00 424.00 6/7/2005
11. Nabua 315 C 1 3 183.00 31.45 34.60 38.85 43.95 43.95 497.50 843.50 4/10/2002
12. Ocampo 874 D 1 1 183.00 31.45 34.60 38.85 43.95 43.95 497.50 843.50 4/10/2002
13. Pamplona 844 D 183.00 31.45 34.60 38.85 43.95 43.95 497.50 843.50 4/10/2002
14. Pasacao 168 D 5 3 253.00 28.95 32.45 36.90 42.50 42.50 542.50 867.00 5/24/2005
15. Pili 176 B 1 8 8 208.00 22.20 24.15 27.00 30.70 30.70 430.00 671.50 3/16/2004
16. Ragay 85 D 3 4 113.00 12.25 13.65 15.45 17.40 17.40 235.50 372.00 9/30/2003
17. Sipocot 76 D 1 19 151.00 17.25 19.55 22.60 26.40 26.40 323.50 519.00 2/22/2005
Total/Average 8 80 52 145.21 16.98 18.70 20.92 23.68 23.75 315.02 502.06

Camiguin - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Mambajao 202 D 12 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
Total/Average 12 45.00 4.65 5.40 6.30 7.90 9.90 91.50 145.50

Capiz - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cuartero 616 D 2 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
2. Dao 346 D 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
3. Dumalag 712 D 1 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
4. Dumarao 112 D 1 1 1 120.00 12.05 14.40 16.85 19.40 19.40 240.50 384.50 9/1/2003
5. Mambusao 356 D 1 235.00 34.50 36.85 40.00 43.00 43.00 580.00 948.50 1/1/2004
6. Metro Roxas 32 A 2 172.00 20.80 24.40 28.10 32.20 32.20 380.00 624.00 10/1/2004
7. Pilar 82 D 2 2 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
8. Pontevedra 372 D 2 1 287.00 35.85 41.40 46.95 52.50 52.50 645.50 1,059.50 1/14/2003
9. Pres. Roxas 341 D 3 190.00 20.90 21.85 22.80 23.75 23.75 399.00 617.50 9/1/2001
Total/Average 3 11 5 175.83 21.91 24.50 27.05 28.82 28.82 395.00 640.00

Catanduanes - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baras 455 D 8 1 1 190.00 20.90 21.85 22.80 23.75 23.75 399.00 617.50 9/1/2001
2. Bato 101 D 1 3 118.00 13.05 13.70 15.50 17.35 17.35 248.50 385.50 2/22/2005
3. Pandan 380 D 1 1 121.00 13.20 13.50 14.05 14.05 14.05 253.00 388.00 7/31/2002
4. San Andres 180 D 1 1 100.00 10.50 12.45 15.10 15.10 15.10 205.00 329.50 2/23/1994
5. Viga 570 D 1 1 75.00 9.00 10.00 11.00 12.00 12.00 165.00 265.00 9/15/1998
6. Virac 181 C 4 3 6/30/2005 169,291 4,956 24,780 28.47 60.00 7.00 7.25 7.50 7.75 7.75 130.00 202.50 7/31/2000
Total/Average 15 7 5 169,291 4,956 20,518 28.47 91.80 10.19 11.02 12.27 12.89 12.89 193.70 303.90

Cavite - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Amadeo 601 C 16 211.00 26.00 28.00 31.00 35.00 35.00 471.00 751.00 3/15/2005
2. Carmona 561 B 17 6/30/2005 97,856 3,342 16,710 24.40 238.60 26.20 29.00 32.60 37.00 37.00 500.60 790.60 3/16/2004
3. Dasmarinas City 83 A 144 6/30/2005 2,096,288 84,490 422,450 20.68 89.00 10.80 13.15 15.60 18.45 18.45 197.00 328.50 7/31/2000
4. Gen. E. Aguinaldo 555 D 4 2 163.00 17.30 19.70 23.45 27.60 27.60 336.00 533.00 6/3/2003
5. Gen. Mariano Alvarez 393 B 29 212.00 22.45 24.25 27.00 30.75 30.75 436.50 679.00 8/31/2000
6. Indang 99 C 15 3 120.00 14.20 15.90 17.40 17.40 17.40 262.00 421.00 6/4/2002
7. Maragondon 503 C 5 6/30/2005 66,817 2,474 12,370 22.51 118.00 13.00 14.50 16.50 19.00 22.00 248.00 393.00 1/1/2005
8. Mendez 424 C 10 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
9. Silang 115 A 77 2 132.00 14.00 15.50 14.50 17.50 20.00 272.00 427.00 9/18/2000
10. Tagaytay City 37 B 19 2 202.00 22.90 25.65 28.90 32.40 36.15 431.00 687.50 2/15/2005
11. Tanza 358 B 11 6/30/2005 173,127 5,274 26,370 27.36 150.00 15.90 17.10 18.60 20.40 20.40 309.00 480.00 7/31/2000
12. Trece Martires City 574 B 31 130.00 13.95 14.95 16.00 18.00 18.00 269.50 419.00 6/24/2003
Total/Average 378 9 2,434,089 95,580 395,701 21.22 136.86 15.07 16.75 18.51 20.86 21.70 287.59 455.18

Cebu - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balamban 622 C 1 20 11 130.00 13.95 14.95 16.00 18.00 18.00 269.50 419.00 6/24/2003
2. Bogo City 577 C 5 117.00 13.10 15.00 17.35 20.30 20.30 248.00 398.00 11/24/1999
3. Carcar 117 B 31 6 132.00 13.50 15.10 17.70 20.80 20.80 267.00 418.00 1/7/2003
4. Daanbantayan 632 D 18 132.00 13.50 15.10 17.70 20.80 20.80 267.00 418.00 1/7/2003
5. Dalaguete 436 C 5 3 100.60 11.25 12.40 14.65 16.75 16.75 213.10 337.10 7/15/1997
6. Medellin 873 D 100.60 11.25 12.40 14.65 16.75 16.75 213.10 337.10 7/15/1997
7. Metro Cebu 11 A 5 140 6/30/2005 3,712,204 102,989 514,945 31.51 108.51 11.97 14.07 38.61 38.61 38.61 228.21 368.91 6/15/2000
8. Moalboal 476 C 2 2 115.00 13.00 14.75 17.00 20.00 20.00 245.00 392.50 9/30/2003
9. Pinamungajan 420 C 16 5 116.00 11.30 13.00 15.70 17.25 17.25 229.00 359.00 5/27/2003
10. Tabuelan 617 D 3 116.00 11.30 13.00 15.70 17.25 17.25 229.00 359.00 5/27/2003
11. Toledo City 195 B 20 4 116.00 11.30 13.00 15.70 17.25 17.25 229.00 359.00 5/27/2003
Total/Average 6 258 34 3,712,204 102,989 426,374 31.51 108.02 11.52 13.13 19.88 21.66 21.66 223.26 354.60

Compostela Valley - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Compostela 863 D 3 116.00 11.30 13.00 15.70 17.25 17.25 229.00 359.00 5/27/2003
2. Nabunturan 146 D 15 156.50 16.55 19.45 24.05 29.75 29.75 322.00 516.50 1/6/2004
Total/Average 18 156.50 16.55 19.45 24.05 29.75 29.75 322.00 516.50

Davao Oriental - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baganga 154 D 3 75.00 7.80 8.50 9.50 9.50 9.50 153.00 238.00 9/16/1996
2. Lupon 428 D 3 210.00 22.20 24.80 27.45 30.15 30.15 432.00 680.00 4/1/2003
3. Mati City 35 C 31 100.00 10.75 11.67 12.90 12.90 12.90 207.50 324.20 9/22/1995
4. San Isidro 161 D 4 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
5. Tarragona 847 D 4 1 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
Total/Average 45 1 126.40 13.26 14.75 16.08 16.67 16.67 259.05 406.62

Davao del Norte - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Asuncion 685 D 3 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
2. Braulio E. Dujali 579 D 2 262.00 27.50 29.15 31.00 33.35 33.35 537.00 828.50 6/25/2002
3. Carmen 319 D 4 248.50 25.65 28.55 31.55 34.60 34.60 505.00 790.50 1/13/2004
4. Island Garden City of Samal 564 C 8 37 155.90 17.70 19.85 22.00 24.15 24.15 332.90 531.40 5/20/2003
5. Kapalong 665 D 1 155.90 17.70 19.85 22.00 24.15 24.15 332.90 531.40 5/20/2003
6. New Corella 552 D 4 187.56 21.95 23.65 25.40 27.25 27.25 407.06 643.56 3/10/2004
7. Panabo City 200 C 13 6/30/2005 63,546 2,367 11,835 22.37 194.35 19.60 20.60 23.35 26.25 26.25 390.35 596.35 2/17/2004
8. Tagum City 175 A 1 7 221.60 23.90 25.75 31.65 38.25 45.00 460.60 718.10 11/23/2004
Total/Average 9 67 4 63,546 2,367 9,799 22.37 164.33 17.43 18.89 21.00 23.29 23.89 338.66 527.58

Davao del Sur - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bansalan 57 C 2 4 170.00 20.00 23.00 26.00 29.00 29.00 370.00 600.00 8/22/2001
2. Davao City 5 A 112 2 80.00 8.40 10.85 14.40 21.00 21.00 164.00 272.50 5/23/2000
3. Digos City 147 B 10 183.90 20.50 23.35 26.95 31.25 31.25 388.90 622.40 12/4/2001
4. Hagonoy 548 D 2 183.60 20.35 22.35 24.55 26.85 26.85 387.10 610.60 12/21/2004
5. Kiblawan 507 D 1 145.00 15.40 16.35 17.35 18.40 18.40 299.00 462.50 12/26/2004
Total/Average 127 6 138.58 15.36 17.61 19.94 23.13 23.13 292.18 468.28

Dinagat Island - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dinagat 833 D 145.00 15.40 16.35 17.35 18.40 18.40 299.00 462.50 12/26/2004
2. San Jose (Dinagat Island) 578 D 1 4 145.00 15.40 16.35 17.35 18.40 18.40 299.00 462.50 12/26/2004
Total/Average 1 4

Eastern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Borongan 116 D 1 4 210.00 22.00 24.00 27.00 31.00 31.00 430.00 670.00 1/2/2003
2. Gen. Macarthur 568 D 1 1 172.00 19.50 22.00 25.00 28.50 28.50 367.00 587.00 2/27/2001
3. Guiuan 201 D 6 228.00 24.20 25.90 28.00 30.50 30.50 470.00 729.00 11/26/2002
4. Llorente 220 D 2 12/31/2004 109 545 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
5. Oras 276 D 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
6. Sulat 425 D 1 138.00 14.20 15.00 15.90 15.90 15.90 280.00 430.00 12/20/2000
7. Taft 584 D 1 1 185.00 20.00 22.00 24.50 27.50 27.50 385.00 605.00 3/18/2003
Total/Average 1 13 5 165.66 18.00 19.56 21.56 23.65 23.65 345.66 541.33

Guimaras - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 164 C 22 1 185.00 20.00 22.00 24.50 27.50 27.50 385.00 605.00 3/18/2003
2. Jordan 289 D 6 4 177.35 22.50 27.30 32.75 38.25 38.25 402.35 675.35 11/27/2000
3. Nueva Valencia 242 D 1 177.35 22.50 27.30 32.75 38.25 38.25 402.35 675.35 11/27/2000
Total/Average 28 6 144.87 18.67 23.45 31.67 34.42 34.42 331.62 566.12

Ifugao - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banaue 861 D 1 177.35 22.50 27.30 32.75 38.25 38.25 402.35 675.35 11/27/2000
2. Ifugao 325 D 2 120.00 12.10 12.20 12.40 12.60 12.60 241.00 363.00 8/3/2004
Total/Average 3 120.00 12.10 12.20 12.40 12.60 12.60 241.00 363.00

Ilocos Norte - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bangui 799 D 1 120.00 12.10 12.20 12.40 12.60 12.60 241.00 363.00 8/3/2004
2. Batac 250 D 14 209.00 22.00 23.50 25.50 26.00 28.00 429.00 664.00 6/21/2005
3. Dingras 208 D 10 220.00 22.90 23.85 24.90 26.10 26.10 449.00 687.50 12/17/2002
4. Ilocos Norte 210 B 45 2 6/30/2005 325,906 13,639 68,195 19.91 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
5. Pagudpud 706 D 1 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
6. San Nicolas 207 C 6 116.15 13.60 15.10 17.85 17.85 17.85 252.15 403.15 6/25/2002
7. Sarrat 350 D 2 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
Total/Average 78 4 325,906 13,639 56,465 19.91 173.03 18.77 20.58 22.85 24.89 24.89 360.73 566.53

Ilocos Sur - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Candon City 571 D 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
2. Magsingal 526 D 4 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
3. Metro Vigan 53 B 1 15 1 215.50 25.00 26.00 27.15 28.45 28.45 465.50 725.50 2/27/2001
4. Narvacan 352 D 1 150.00 15.20 16.20 17.40 18.70 18.70 302.00 464.00 9/18/2000
5. Santa 299 D 1 1 150.00 15.20 16.20 17.40 18.70 18.70 302.00 464.00 9/18/2000
6. Sinait 573 D 6 133.00 14.00 15.00 16.25 17.60 17.60 273.00 423.00 3/7/2000
7. Sta. Lucia 349 D 1 185.00 20.05 21.80 23.85 26.00 26.00 385.50 603.50 1/25/2005
8. Tagudin 177 D 1 200.00 26.50 30.05 32.00 32.00 32.00 465.00 765.50 8/27/2004
Total/Average 2 29 2 167.90 19.64 21.25 22.72 23.88 23.88 364.30 576.80

Iloilo - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ajuy 110 D 1 80.00 11.90 12.90 13.90 13.90 13.90 199.00 328.00 8/6/1996
2. Alimodian 185 D 10 150.00 15.32 16.92 17.55 17.55 17.55 303.20 472.40 5/5/1997
3. Anilao 331 D 1 158.00 17.20 18.95 21.00 23.40 23.40 330.00 519.50 11/23/1999
4. Banate 318 D 5 227.00 23.20 24.20 27.15 30.15 30.15 459.00 701.00 3/1/2005
5. Calinog 363 D 1 6 162.00 16.55 17.20 18.20 18.20 18.20 327.50 499.50 4/1/2004
6. Concepcion 375 D 4 213.75 22.90 24.60 26.35 28.15 28.15 442.75 688.75 7/6/1999
7. Dingle-Pototan 77 D 1 2 132.00 13.90 16.80 20.00 24.00 24.00 271.00 439.00 1/1/2003
8. Duenas 345 D 14 132.00 13.90 16.80 20.00 24.00 24.00 271.00 439.00 1/1/2003
9. Dumangas-Barotac Nuevo 237 C 7 283.00 28.60 32.00 37.35 44.30 52.45 569.00 889.00 4/22/2003
10. Estancia 360 D 1 260.00 29.00 32.00 35.50 39.50 39.50 550.00 870.00 2/8/2005
11. Igbaras 390 D 1 260.00 29.00 32.00 35.50 39.50 39.50 550.00 870.00 2/8/2005
12. Janiuay 226 D 6 175.00 19.25 21.00 22.75 24.50 24.50 367.50 577.50 6/1/2004
13. Lambunao 225 D 3 175.00 19.25 21.00 22.75 24.50 24.50 367.50 577.50 6/1/2004
14. Lemery 431 D 1 175.00 19.25 21.00 22.75 24.50 24.50 367.50 577.50 6/1/2004
15. Leon 466 D 1 170.00 17.70 18.65 19.95 21.60 21.60 347.00 533.50 5/30/2000
16. Metro Iloilo 71 A 7 10 159.00 17.50 19.25 21.25 23.60 26.30 334.00 526.50 7/1/2004
17. Miagao 383 D 1 2 262.00 39.25 43.35 47.45 51.55 51.55 654.50 1,088.00 5/3/2005
18. New Lucena 446 D 4 109.00 11.48 12.58 13.67 13.67 13.67 223.80 349.60 6/5/1995
19. San Joaquin 388 D 1 308.00 31.90 33.30 34.90 36.85 36.85 627.00 960.00 3/16/2004
20. Tubungan 595 D 1 308.00 31.90 33.30 34.90 36.85 36.85 627.00 960.00 3/16/2004
21. Zarraga 508 D 1 5 280.00 29.15 31.05 33.50 36.10 36.10 571.50 882.00 2/1/2005
Total/Average 10 89 2 173.34 19.32 21.05 23.16 25.09 24.80 366.56 577.13

Isabela - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alicia 198 D 7 210.00 23.00 25.20 28.50 32.00 32.00 440.00 692.00 3/11/2000
2. Angadanan 278 D 1 210.00 22.70 24.70 27.00 29.50 29.50 437.00 684.00 11/25/2003
3. Aurora 856 D 5 210.00 22.70 24.70 27.00 29.50 29.50 437.00 684.00 11/25/2003
4. Benito Soliven 283 D 6 210.00 22.70 24.70 27.00 29.50 29.50 437.00 684.00 11/25/2003
5. Cabagan 182 C 7 183.00 30.10 36.10 43.40 43.40 43.40 484.00 845.00 2/18/2003
6. Cauayan City 183 B 17 6/30/2005 164,561 5,079 25,395 27.00 60.00 6.70 7.50 8.50 9.80 9.80 127.00 202.00 1/3/2000
7. City of Ilagan 90 C 26 6/30/2005 35,497 1,696 8,480 17.44 240.00 25.05 28.60 33.25 37.75 37.75 490.50 776.50 2/10/2004
8. Cordon 287 D 3 325.00 33.65 35.30 37.35 39.80 39.80 661.50 1,014.50 2/12/2002
9. Gamu 615 D 9 325.00 33.65 35.30 37.35 39.80 39.80 661.50 1,014.50 2/12/2002
10. Luna 460 D 1 325.00 33.65 35.30 37.35 39.80 39.80 661.50 1,014.50 2/12/2002
11. Naguilian 781 D 9 325.00 33.65 35.30 37.35 39.80 39.80 661.50 1,014.50 2/12/2002
12. Ramon 294 D 4 265.00 29.85 33.45 37.30 41.60 41.60 563.50 898.00 2/17/2004
13. Reina Mercedes 572 D 2 265.00 29.85 33.45 37.30 41.60 41.60 563.50 898.00 2/17/2004
14. Roxas 199 C 7 160.00 16.39 18.10 20.10 22.25 22.25 323.90 504.90 9/24/2002
15. San Guillermo 485 D 4 160.00 16.39 18.10 20.10 22.25 22.25 323.90 504.90 9/24/2002
16. San Manuel 421 D 4 170.00 17.50 18.00 18.50 19.00 19.00 345.00 525.00 1/8/2002
17. Santiago City 92 B 19 297.00 32.00 37.00 47.00 51.00 51.00 617.00 987.00 3/23/1999
18. Tumauini 309 C 9 135.00 14.00 14.50 15.00 15.00 15.00 275.00 420.00 4/10/2002
Total/Average 140 200,059 6,775 28,049 24.61 174.41 19.52 21.73 24.76 26.75 26.75 369.61 586.99

La Union - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balaoan 59 D 4 2 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 4/13/1999
2. Metro San Fernando 16 B 35 2 177.00 18.45 22.10 27.70 31.05 31.05 361.50 582.50 2/18/2003
3. Naguilian 84 D 6 1 190.00 19.50 20.60 22.25 24.45 24.45 385.00 591.00 3/16/2004
4. Rosario 89 D 2 4 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
Total/Average 49 9 165.25 17.66 19.12 21.59 23.16 23.16 341.85 533.05

Laguna - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
2. Cabuyao 596 C 18 140.00 16.00 18.50 21.50 25.50 25.50 300.00 485.00 9/25/2001
3. Calamba 29 A 82 1 6/30/2005 937,996 30,783 153,915 25.39 115.35 12.60 14.90 19.10 22.70 22.70 241.35 390.35 7/31/2000
4. Laguna 38 A 16 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
5. Mabitac 668 D 1 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
6. Pagsanjan 122 C 8 3 200.00 22.00 24.00 26.00 29.00 29.00 420.00 660.00 2/15/2005
7. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
8. San Pablo City 4 A 31 6 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
9. San Pedro 170 B 54 141.90 14.40 15.05 15.40 15.80 15.80 285.90 436.40 3/11/2003
10. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
11. Sta. Cruz 127 B 19 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
Total/Average 251 14 937,996 30,783 127,442 25.39 114.53 12.27 13.65 15.53 17.08 17.48 237.31 373.81

Lanao del Norte - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod 543 C 3 109.00 12.25 13.45 14.10 14.65 14.65 231.50 366.00 6/19/2002
2. Kapatagan 418 C 2 1 94.40 11.10 12.60 14.15 14.15 14.15 205.40 331.40 7/12/2002
3. Kauswagan 540 D 10 2 108.00 11.85 13.15 14.30 14.30 14.30 226.50 358.00 7/17/2002
4. Kolambugan 539 D 2 2 123.00 16.85 17.55 18.25 18.25 18.25 291.50 467.00 7/24/2003
5. Linamon 517 D 3 77.00 8.47 8.86 9.24 9.24 9.24 161.70 250.30 12/7/1998
6. Tubod-Baroy 228 D 10 103.35 11.80 13.30 14.75 14.75 14.75 221.35 354.35 9/16/1996
Total/Average 27 8 102.45 12.05 13.15 14.13 14.22 14.22 222.99 354.50

Lanao del Sur - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Marawi City 3 D 3 119.00 13.50 16.70 20.50 21.10 21.10 254.00 421.00 4/5/2005
2. Wao 519 C 6 75.00 8.00 8.50 9.00 9.00 9.00 155.00 240.00 12/13/1998
Total/Average 3 6 92.00 10.20 11.90 13.90 14.20 14.20 194.00 313.00

Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abuyog 121 D 3 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
2. Babatngon 438 D 1 1 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
3. Baybay City 39 C 2 2 9 78.00 8.90 9.80 10.45 11.85 11.85 167.00 265.00 8/24/1998
4. Isabel 521 D 7 2 90.00 10.50 11.00 11.50 12.20 12.20 195.00 305.00 4/17/2002
5. Jaro 157 D 1 2 95.00 12.00 14.00 16.00 17.50 17.50 215.00 355.00 7/4/1997
6. Leyte Metro 19 B 3 1 148.50 16.35 19.00 22.15 22.15 22.15 312.00 502.00 5/20/2003
7. Merida 520 D 2 60.00 5.50 7.25 8.25 10.50 10.50 115.00 187.50 3/1/2002
8. Metro Carigara 246 B 2 1 181.45 19.05 20.95 24.00 28.80 28.80 371.95 581.45 4/11/2000
9. Metro Hilongos 189 C 5 2 262.00 28.70 31.20 34.30 37.60 37.60 549.00 861.00 12/16/2003
Total/Average 8 24 15 139.99 15.91 17.99 20.27 22.67 22.77 299.10 479.05

Maguindanao - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Cotabato 30 A 1 8 1 6/30/2005 597,941 20,896 104,480 23.85 184.00 20.35 23.50 26.70 29.95 29.95 387.50 622.50 2/11/2003
Total/Average 1 9 1 597,941 20,896 86,509 23.85 160.00 17.70 20.45 23.20 26.05 26.05 337.00 541.50

Masbate - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aroroy 137 D 1 276.00 28.90 30.30 32.05 34.00 34.00 565.00 868.00 6/24/2003
2. Masbate-Mobo 69 C 7 178.00 25.60 27.10 29.10 31.60 31.60 434.00 705.00 9/18/2000
Total/Average 8 201.50 24.30 25.90 27.60 29.65 29.65 444.50 703.50

Misamis Occidental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Ozamis 10 B 4 1 190.00 22.00 25.00 29.00 34.00 40.00 410.00 660.00 12/11/2001
2. Oroquieta City 694 C 1 5 190.00 22.00 25.00 29.00 34.00 40.00 410.00 660.00 12/11/2001
3. Tangub City 158 C 16 4 161.00 17.50 21.00 22.90 22.90 22.90 336.00 546.00 7/23/2002
Total/Average 1 25 5 132.00 14.30 16.50 18.42 19.55 20.80 275.00 440.00

Misamis Oriental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balingasag 501 D 3 1 6/30/2005 22,832 1,527 7,635 12.46 194.00 27.85 36.90 46.60 56.85 56.85 472.50 841.50 4/17/2002
2. Cagayan de Oro City 1 A 25 1 6/30/2005 2,276,602 63,418 317,090 29.92 90.00 12.50 13.00 13.50 14.00 14.00 215.00 345.00 10/26/1998
3. Claveria 212 D 8 123.00 14.35 16.60 19.00 21.55 21.55 266.50 432.50 7/24/2003
4. Gingoog City 25 C 23 6 208.00 22.00 24.00 26.00 28.00 28.00 428.00 668.00 10/16/2001
5. Tagoloan 634 D 3 1 208.00 22.00 24.00 26.00 28.00 28.00 428.00 668.00 10/16/2001
6. Talisayan 864 D 2 1 208.00 22.00 24.00 26.00 28.00 28.00 428.00 668.00 10/16/2001
Total/Average 56 18 2,299,434 64,945 268,872 29.50 134.20 16.60 19.27 22.06 25.33 25.33 300.20 492.95

Negros Occidental - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod City 2 A 1 65 2 6/30/2005 936,370 27,134 135,670 28.76 173.00 17.80 18.90 21.45 21.45 25.00 351.00 540.00 6/1/2004
2. Bago City 317 C 11 152.00 15.85 17.50 18.90 20.40 20.40 310.50 485.50 4/5/2005
3. Binalbagan 103 C 5 230.00 33.00 37.70 42.70 48.10 48.10 560.00 937.00 7/24/2003
4. Cadiz City 386 C 1 1 140.00 16.80 17.75 19.60 21.95 21.95 308.00 485.50 3/8/2005
5. Escalante 165 D 2 2 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
6. Himamaylan 102 C 7 1 225.00 30.00 32.00 34.00 36.00 36.00 525.00 845.00 7/8/2003
7. Kabankalan City 50 C 2 3 1 225.00 30.00 32.00 34.00 36.00 36.00 525.00 845.00 7/8/2003
8. La Carlota City 49 C 17 2 6/30/2005 0 5,993 29,965 225.00 30.00 32.00 34.00 36.00 36.00 525.00 845.00 7/8/2003
9. La Castellana 281 D 3 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
10. Manapla 234 D 2 240.00 26.70 32.10 37.50 42.90 42.90 507.00 828.00 5/12/2004
11. Murcia 611 C 6 240.00 26.70 32.10 37.50 42.90 42.90 507.00 828.00 5/12/2004
12. Pulupandan 631 D 1 240.00 26.70 32.10 37.50 42.90 42.90 507.00 828.00 5/12/2004
13. Sagay 129 C 16 175.00 17.90 19.50 21.15 23.15 25.45 354.00 549.00 6/10/2003
14. Silay City 27 C 10 6/30/2005 92,287 3,894 19,470 19.75 200.00 22.00 26.00 32.00 39.00 39.00 420.00 680.00 6/1/2004
15. Sipalay 252 D 1 279.00 28.50 29.75 31.25 33.25 33.25 564.00 861.50 11/5/2003
16. Talisay City 533 C 9 6/30/2005 91,687 4,373 21,865 17.47 190.00 21.95 25.15 27.90 33.00 33.00 409.50 661.00 12/8/1997
17. Victorias 70 C 12 130.00 14.00 16.50 20.00 23.50 23.50 270.00 435.00 1/1/2005
Total/Average 3 168 18 1,120,344 35,401 146,560 26.37 159.80 18.85 21.12 23.79 26.24 27.25 348.30 559.54

Negros Oriental - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ayungon 569 D 9 4 130.00 14.00 16.50 20.00 23.50 23.50 270.00 435.00 1/1/2005
2. Bais City 530 C 2 11 3 171.00 18.55 20.65 23.80 27.70 27.70 356.50 563.00 11/13/1995
3. Bayawan 221 C 1 14 6/30/2005 43,163 1,899 9,495 18.94 152.00 24.30 28.55 31.65 36.70 36.70 395.00 680.50 11/24/1997
4. Dumaguete City 47 B 20 6/30/2005 714,245 18,204 91,020 120.00 13.50 16.50 20.00 24.00 24.00 255.00 420.00 8/26/2003
5. Sibulan 253 C 9 7 165.00 20.25 22.75 26.25 30.50 30.50 367.50 595.00 7/22/1998
6. Tanjay 163 C 1 1 2 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
Total/Average 12 46 26 43,163 1,899 7,862 18.94 143.03 16.76 19.07 22.19 25.51 27.89 310.65 501.35

North Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aleosan 755 D 3 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
2. Kabacan 194 C 8 6/30/2005 75,829 3,483 17,415 18.14 157.00 19.25 22.80 26.35 29.90 29.90 349.50 577.50 1/18/2005
3. Metro Kidapawan 41 A 1 4 9 6/30/2005 0 16,381 81,905 156.60 17.95 20.30 22.65 25.00 27.35 336.10 539.10 12/18/2001
4. Metro Midsayap 174 C 1 20 191.95 21.45 24.15 26.95 30.30 30.30 406.45 647.95 12/7/2004
5. Mlang 209 C 7 233.25 25.05 26.85 28.85 31.05 31.05 483.75 752.25 1/15/2002
6. Pigcawayan 477 D 7 176.65 18.85 20.05 21.25 22.45 22.45 365.15 565.65 4/27/1999
7. Pikit 495 D 5 160.50 17.25 18.75 20.55 22.65 22.65 333.00 520.50 7/24/2001
8. Tulunan 590 D 1 246.65 25.90 27.50 29.30 31.60 31.60 505.65 780.65 8/13/2002
Total/Average 2 60 10 75,829 3,483 14,420 18.14 163.44 18.26 20.30 22.40 24.67 25.00 346.08 549.08

Northern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Catarman 359 D 4 175.00 20.50 23.75 27.25 31.00 31.00 380.00 617.50 4/25/2005
2. Gamay 619 D 1 175.00 20.50 23.75 27.25 31.00 31.00 380.00 617.50 4/25/2005
3. Laoang 381 D 7 250.00 26.00 27.50 29.25 31.25 31.25 510.00 785.00 3/5/2003
4. San Isidro 557 D 1 105.00 11.00 11.55 12.40 13.50 13.50 215.00 330.50 12/11/2000
5. San Jose 583 D 1 3 1 230.00 23.70 24.65 26.30 28.30 28.30 467.00 713.50 6/25/2002
6. Victoria 556 D 1 132.00 13.40 13.85 14.50 15.85 15.85 266.00 404.50 5/3/2001
Total/Average 1 16 2 164.00 16.96 18.15 19.87 21.99 21.99 333.60 515.10

Nueva Ecija - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongabon 410 C 1 18 265.00 27.50 29.25 31.65 34.70 38.05 540.00 832.50 12/10/2002
2. Cabanatuan City 15 A 47 139.00 15.15 16.65 18.50 20.25 23.60 290.50 457.00 2/1/2005
3. Cabiao 414 B 6 160.00 16.15 16.30 16.65 16.65 16.65 321.50 484.50 4/4/2000
4. Cuyapo 224 D 7 155.00 16.40 18.00 19.35 20.65 20.65 319.00 499.00 3/5/2003
5. Gapan City 21 C 10 176.00 18.65 20.00 21.75 24.15 27.60 362.50 562.50 3/13/2000
6. Gen. M. Natividad 353 D 3 240.00 24.70 25.50 26.35 27.25 28.20 487.00 742.00 10/22/2002
7. Gen. Tinio 191 C 1 7 170.00 17.50 18.50 20.00 22.00 24.50 345.00 530.00 8/30/1999
8. Guimba 295 B 10 235.00 26.15 28.75 31.70 35.10 38.85 496.50 784.00 12/21/2004
9. Jaen 290 C 12 186.00 19.50 20.50 21.65 23.10 24.75 381.00 586.00 12/17/2002
10. Licab 603 C 4 186.00 19.50 20.50 21.65 23.10 24.75 381.00 586.00 12/17/2002
11. Lupao 316 D 5 186.00 19.50 20.50 21.65 23.10 24.75 381.00 586.00 12/17/2002
12. Munoz City 328 C 7 6/30/2005 75,381 2,660 13,300 23.62 136.00 14.10 14.85 16.10 17.60 19.35 277.00 425.50 9/11/2001
13. Palayan City 343 C 6 15 235.00 24.80 26.45 28.45 30.80 33.50 483.00 747.50 11/23/2004
14. Penaranda 306 C 7 200.00 20.85 22.15 23.70 25.35 27.50 408.50 630.00 2/13/2001
15. San Antonio 131 C 7 165.00 17.10 18.40 20.80 23.00 25.20 336.00 520.00 10/2/2001
16. San Jose City 36 C 4 1 125.00 13.20 14.20 15.50 17.10 19.00 257.00 399.00 3/22/2002
17. Sta. Rosa 217 B 1 15 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
18. Talavera 293 B 16 6/30/2005 115,032 3,636 18,180 26.67 180.00 18.30 18.70 19.30 20.10 21.00 363.00 550.00 5/3/2001
19. Talugtug 494 D 10 180.00 18.30 18.70 19.30 20.10 21.00 363.00 550.00 5/3/2001
Total/Average 9 211 1 190,413 6,296 26,065 25.38 161.93 16.93 18.02 19.42 20.89 22.55 331.31 511.52

Nueva Vizcaya - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Diadi 613 D 1 2 1 180.00 18.30 18.70 19.30 20.10 21.00 363.00 550.00 5/3/2001
2. Kasibu 759 D 1 180.00 18.30 18.70 19.30 20.10 21.00 363.00 550.00 5/3/2001
Total/Average 1 2 2

Occidental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Sablayan 197 C 13 6/30/2005 29,401 1,456 7,280 16.83 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
2. San Jose 62 C 20 125.00 13.00 14.00 16.00 18.00 18.00 255.00 395.00 3/5/2002
Total/Average 35 29,401 1,456 6,028 16.83 137.50 14.00 15.00 17.00 19.50 19.50 277.50 427.50

Oriental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Naujan 245 D 3 170.00 18.55 20.65 23.20 23.20 23.20 355.50 562.00 2/5/2002
2. Pinamalayan 327 D 1 3 155.00 16.60 18.20 20.90 23.50 23.50 321.00 503.00 2/13/2001
3. Pola 96 D 1 92.60 9.90 11.60 13.65 13.65 13.65 191.60 307.60 9/25/2001
4. Roxas 334 D 1 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
Total/Average 1 9 123.40 13.17 14.53 16.35 17.07 17.07 255.15 400.52

Palawan - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aborlan 440 D 4/30/2001 100.00 10.20 10.70 11.20 11.50 11.50 202.00 309.00 1/1/2001
2. Culion 599 D 1 4 110.00 12.00 14.00 17.00 17.00 21.00 230.00 370.00 3/1/2005
3. Puerto Princesa City 26 A 9 36 6/30/2005 480,415 15,869 79,345 21.66 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
4. Roxas 449 D 1 1 180.00 20.50 23.00 25.50 28.00 28.00 385.00 615.00 4/16/2001
5. Taytay 604 D 1 150.00 16.00 17.00 18.00 20.00 20.00 310.00 480.00 2/15/2001
Total/Average 10 40 4 480,415 15,869 65,698 21.66 147.50 16.12 17.75 19.87 21.75 22.75 308.75 486.25

Pampanga - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angeles City 322 A 40 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
2. Bacolor 160 D 7 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
3. Candaba 593 C 7 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
4. City of San Fernando 40 A 46 175.00 19.65 22.25 25.15 28.50 32.20 371.50 594.00 9/25/2000
5. Floridablanca 256 B 22 6/30/2005 135,814 6,890 34,450 22.57 115.00 12.25 13.00 13.75 14.50 15.25 237.50 367.50 6/6/2004
6. Guagua 46 B 16 120.00 13.20 15.00 17.40 20.40 24.00 252.00 402.00 11/18/2003
7. Lubao 232 B 19 6/30/2005 170,419 4,363 21,815 32.55 112.00 12.30 13.20 14.40 14.40 14.40 235.00 367.00 3/29/2005
8. Mabalacat City 61 A 45 6/30/2005 606,638 20,987 104,935 24.61 108.00 11.50 12.60 14.00 14.00 14.00 223.00 349.00 10/11/2000
9. Macabebe 171 C 8 107.50 10.80 12.00 13.45 13.45 13.45 215.50 335.50 10/26/1998
10. Masantol 320 C 6 6/30/2005 33,121 1,177 5,885 23.45 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
11. Porac 402 C 11 180.00 16.25 17.75 19.50 21.50 23.75 342.50 520.00 1/25/2005
12. Sasmuan 484 D 7 130.00 13.20 13.70 13.95 13.95 13.95 262.00 399.00 7/10/2000
13. Sta Rita 618 D 2 130.00 13.20 13.70 13.95 13.95 13.95 262.00 399.00 7/10/2000
Total/Average 236 945,992 33,417 138,346 25.19 123.95 13.30 14.43 15.74 16.61 17.59 257.00 401.35

Pangasinan - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos City 34 B 10 1 130.00 13.20 13.70 13.95 13.95 13.95 262.00 399.00 7/10/2000
2. Alcala 166 C 17 246.95 26.85 29.70 33.30 37.60 37.60 515.45 812.45 5/3/2004
3. Asingan 524 C 5 220.00 23.00 24.50 26.50 29.00 29.00 450.00 695.00 2/27/2001
4. Balungao 560 D 1 210.00 21.80 22.60 23.50 24.85 24.85 428.00 654.00 9/21/2004
5. Bani 74 D 1 6/30/2005 40,392 2,017 10,085 16.69 132.00 15.45 18.15 21.50 25.35 25.35 286.50 468.00 10/29/2001
6. Basista 544 D 3 132.00 15.45 18.15 21.50 25.35 25.35 286.50 468.00 10/29/2001
7. Bayambang 119 C 1 16 199.00 21.65 23.75 26.25 29.60 29.60 415.50 653.00 6/15/2005
8. Binalonan 285 C 9 6/30/2005 14,872 692 3,460 17.91 150.00 16.50 18.30 20.70 23.30 23.30 315.00 498.00 3/13/2001
9. Binmaley 97 B 13 149.00 16.55 18.95 22.10 26.05 26.05 314.50 504.00 5/24/2005
10. Bugallon 567 D 3 185.00 20.55 22.80 26.45 30.85 30.85 390.50 618.50 12/21/2004
11. Calasiao 700 D 185.00 20.55 22.80 26.45 30.85 30.85 390.50 618.50 12/21/2004
12. Dagupan City 297 B 25 6/30/2005 502,248 16,348 81,740 25.60 109.00 11.95 13.05 13.05 17.40 17.40 228.50 359.00 11/23/2004
13. Dasol 674 D 2 109.00 11.95 13.05 13.05 17.40 17.40 228.50 359.00 11/23/2004
14. Lingayen 52 C 12 215.00 22.45 23.50 24.75 26.35 26.35 439.50 674.50 3/11/2003
15. Manaoag 128 C 5 1 180.00 19.00 20.50 22.50 25.00 25.00 370.00 575.00 11/25/2003
16. Mangaldan 139 B 16 72.00 7.80 9.30 10.70 10.70 10.70 150.00 243.00 11/27/1995
17. Mapandan 612 C 5 72.00 7.80 9.30 10.70 10.70 10.70 150.00 243.00 11/27/1995
18. Metro Tayug 113 C 5 186.00 20.45 22.30 24.20 24.20 24.20 390.50 613.50 7/24/2003
19. Pozorrubio 133 C 7 180.00 18.70 20.10 22.35 25.95 25.95 367.00 568.00 12/9/2003
20. Rosales 270 C 9 6/30/2005 60,800 2,372 11,860 21.36 144.00 15.20 16.00 16.80 16.80 16.80 296.00 456.00 9/28/1998
21. San Carlos City 44 C 18 167.00 17.70 19.00 20.60 22.60 22.60 344.00 534.00 5/18/2005
22. San Manuel 562 D 3 170.00 17.50 18.00 18.50 19.00 19.00 345.00 525.00 6/21/2004
23. San Nicolas 255 D 8 6/30/2005 36,105 1,316 6,580 19.70 169.00 17.50 18.50 20.00 22.00 20.00 344.00 529.00 1/25/2005
24. San Quintin 553 D 2 1 149.00 15.60 16.90 18.60 20.65 20.65 305.00 474.00 11/6/2001
25. Santa Maria 554 C 5 161.00 16.70 17.70 19.00 20.50 20.50 328.00 505.00 12/11/2001
26. Santo Tomas 636 D 1 161.00 16.70 17.70 19.00 20.50 20.50 328.00 505.00 12/11/2001
27. Umingan 148 D 10 240.00 25.85 28.30 32.00 34.30 34.30 498.50 781.50 3/29/2005
28. Urbiztondo 304 D 2 250.00 26.10 27.30 28.60 30.00 30.00 511.00 784.00 5/25/2004
29. Urdaneta City 24 B 9 6/30/2005 103,378 4,248 21,240 20.28 226.00 22.90 23.30 23.80 24.40 24.40 455.00 688.00 1/23/2004
30. Villasis 95 C 9 160.00 17.30 18.80 20.65 22.80 22.80 333.00 521.00 1/29/2002
Total/Average 1 233 3 757,795 26,993 111,751 23.24 161.51 17.28 18.75 20.56 22.68 22.68 334.37 521.95

Quezon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Atimonan 260 D 1 4 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
2. Burdeos 581 D 1 196.00 24.30 27.65 31.35 35.55 35.55 439.00 715.50 9/19/2000
3. Calauag 78 C 1 8 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
4. Candelaria 114 C 9 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
5. Catanauan 531 D 1 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
6. Dolores 462 D 1 3 3 130.00 14.50 16.25 18.50 21.25 21.25 275.00 437.50 4/10/2003
7. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
8. Gumaca 79 D 9 262.00 28.40 30.80 33.85 38.05 38.05 546.00 854.00 2/1/2005
9. Infanta - Gen. Nakar 229 C 6 151.00 16.45 18.25 20.65 20.65 20.65 315.50 498.00 6/19/2002
10. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
11. Macalelon 580 D 3 322.00 33.50 35.50 38.50 42.50 42.50 657.00 1,012.00 3/1/2005
12. Mauban 298 D 5 4 136.00 14.50 16.00 18.00 20.50 20.50 281.00 441.00 1/29/2002
13. Polilio 600 D 2 200.00 21.00 22.50 24.50 27.00 27.00 410.00 635.00 1/20/2004
14. Quezon Metro 17 A 36 16 102.50 10.65 11.85 13.00 14.50 14.50 209.00 327.50 7/15/2003
15. San Francisco 842 D 2 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
16. Tagkawayan 130 C 1 3 171.60 17.95 19.15 20.70 22.45 22.45 351.10 542.60 2/4/2003
17. Tiaong 151 C 7 122.00 13.00 15.00 18.00 18.00 22.00 252.00 402.00 2/13/2001
Total/Average 6 97 51 146.43 16.03 17.58 19.68 21.06 21.63 306.79 482.68

Quirino - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aglipay 354 D 4/30/2001 122.00 13.00 15.00 18.00 18.00 22.00 252.00 402.00 2/13/2001
2. Diffun 279 D 4 142.00 16.00 17.80 19.80 21.90 21.90 302.00 480.00 1/14/2003
3. Maddela 337 D 1 1 177.00 18.00 18.40 18.90 19.50 19.50 357.00 541.00 9/4/2001
Total/Average 1 6 142.00 16.00 17.80 19.80 21.90 21.90 302.00 480.00

Rizal - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 6/30/2005 197,919 6,488 32,440 25.42 175.00 19.00 20.95 23.00 25.15 27.40 365.00 574.50 5/13/2003
2. Pililla 487 C 17 130.00 13.20 14.75 17.20 18.40 18.40 262.00 409.50 3/19/2002
3. Tanay 88 B 15 2 6/30/2005 248,914 8,611 43,055 24.09 188.00 19.80 22.20 26.50 33.40 33.40 386.00 608.00 6/1/2001
4. Teresa 536 C 11 6/30/2005 72,284 2,869 14,345 21.00 160.00 17.60 19.50 21.85 24.90 24.90 336.00 531.00 9/1/2003
Total/Average 55 2 519,117 17,968 74,388 24.08 170.60 18.33 20.31 22.95 26.04 26.42 353.90 557.00

Romblon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 115.00 11.65 14.80 19.00 23.65 23.65 231.50 379.50 2/8/2005
2. Romblon 64 D 7 113.00 13.00 14.00 16.00 19.00 19.00 243.00 383.00 7/24/2004
Total/Average 8 1 95.00 10.30 12.22 15.12 17.75 17.75 198.00 320.25

Sarangani - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Glan 439 D 5 205.40 22.35 25.70 29.05 34.95 34.95 428.90 685.90 2/26/2002
2. Maasim 444 D 2 2 80.00 8.50 9.00 9.50 10.00 10.00 165.00 255.00 3/10/1997
3. Malungon 592 D 2 170.00 18.00 19.25 20.75 22.50 22.50 350.00 542.50 11/25/2003
Total/Average 7 4 133.35 14.40 16.17 17.95 20.87 20.87 277.35 439.10

Siquijor - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Siquijor 142 D 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00 3/13/1995
Total/Average 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00

Sorsogon - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barcelona 681 D 1 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00 3/13/1995
2. Bulan 22 C 1 3 1 6/30/2005 76,838 3,897 19,485 16.43 100.00 11.60 12.25 13.25 13.25 13.25 216.00 338.50 5/7/1996
3. Casiguran 366 C 1 88.00 9.80 10.80 12.00 12.00 12.00 186.00 294.00 6/8/1994
4. Donsol 72 D 4 255.00 27.35 30.90 35.50 40.65 40.65 528.50 837.50 9/10/2003
5. Gubat 136 C 18 5 120.00 15.80 17.50 19.50 22.00 22.00 278.00 453.00 12/8/1997
6. Irosin 586 D 1 120.00 13.40 14.40 15.40 16.40 16.40 254.00 398.00 6/25/2002
7. Matnog 263 D 5 155.00 16.15 21.65 27.45 27.45 27.45 316.50 533.00 5/3/2001
8. Pilar 474 D 5 192.00 20.20 21.65 23.60 25.95 25.95 394.00 610.50 6/10/2003
9. Sorsogon City 20 B 12 5 140.00 15.25 16.85 18.85 21.40 24.35 292.50 461.00 7/2/2003
Total/Average 1 47 14 76,838 3,897 16,134 16.43 123.50 13.56 15.37 17.56 18.96 19.33 259.12 412.87

South Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banga 230 D 2 282.75 31.05 34.00 37.00 40.10 40.10 593.25 933.25 5/14/2002
2. City of Koronadal 156 B 23 119.30 14.60 17.30 20.05 22.85 22.85 265.30 438.30 2/8/2000
3. Gen. Santos City 370 A 33 6/30/2005 385,852 16,404 82,020 19.60 212.00 23.05 26.65 30.50 34.50 34.50 442.50 709.00 3/12/2001
4. Norala 213 D 2 6/30/2005 9,434 471 2,355 16.69 162.00 17.30 19.45 21.60 23.75 23.75 335.00 529.50 5/16/2000
5. Polomolok 153 B 17 1 108.75 13.05 16.70 17.80 19.30 19.30 239.25 406.25 11/14/1994
6. Sto. Nino 648 D 1 108.75 13.05 16.70 17.80 19.30 19.30 239.25 406.25 11/14/1994
7. Surallah 500 C 12 1 206.75 22.85 25.75 28.75 31.80 31.80 435.25 692.75 2/22/2005
8. Tupi 280 D 6 2 154.00 16.35 17.30 18.30 19.30 19.30 317.50 490.50 11/9/1999
Total/Average 96 4 395,286 16,875 69,863 19.52 146.96 16.35 18.69 20.72 22.85 22.85 310.46 497.39

Southern Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Maasin City 291 C 7 2 160.00 18.45 20.20 22.00 24.00 24.00 344.50 546.50 3/1/2005
2. Sogod 188 C 3 4 180.00 21.40 24.90 32.30 41.15 41.15 394.00 643.00 1/18/2005
Total/Average 10 6 110.00 12.55 14.62 17.60 21.60 21.60 235.50 381.75

Sultan Kudarat - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kalamansig 376 D 1 176.00 20.00 22.50 25.10 17.90 27.90 376.00 601.00 2/8/2000
2. Lebak 499 D 2 1 268.10 27.60 29.35 31.30 33.40 33.40 544.10 837.60 4/28/2004
3. Sultan Kudarat 247 B 17 152.40 16.80 18.80 20.85 22.95 22.95 320.40 508.40 2/15/2000
Total/Average 19 2 180.96 19.63 21.60 23.66 22.53 25.86 377.30 593.30

Sulu - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Jolo Mainland 254 C 2 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50 5/20/1992
Total/Average 1 2 145.20 14.00 17.50 26.20 28.70 28.70 285.20 460.20

Surigao del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacuag 515 D 2 1 182.00 20.85 24.00 27.30 30.75 30.75 390.50 630.50 2/12/2002
2. Del Carmen 588 D 2 182.00 20.85 24.00 27.30 30.75 30.75 390.50 630.50 2/12/2002
3. Metro Siargao 56 D 2 1 204.00 31.20 42.60 54.60 67.20 67.20 516.00 942.00 10/22/2002
4. Placer 355 C 3 99.20 10.35 11.35 12.90 13.40 13.40 202.70 316.20 2/23/1999
5. Socorro 628 D 99.20 10.35 11.35 12.90 13.40 13.40 202.70 316.20 2/23/1999
6. Surigao Metro 324 B 14 3 187.00 23.25 29.25 35.75 43.00 51.75 419.50 712.00 8/22/2001
Total/Average 14 8 7 144.05 18.17 22.58 27.36 32.22 33.66 325.80 551.67

Surigao del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barobo 193 D 2 187.00 23.25 29.25 35.75 43.00 51.75 419.50 712.00 8/22/2001
2. Bislig City 23 B 1 3 7 178.00 18.55 20.55 24.50 29.60 29.60 363.50 569.00 1/8/2002
3. Cantilan 441 D 1 2 1 198.00 21.75 22.90 24.30 24.30 24.30 415.50 644.50 3/8/2005
4. Carmen 646 D 1 198.00 21.75 22.90 24.30 24.30 24.30 415.50 644.50 3/8/2005
5. Hinatuan 143 D 2 7 6/30/2005 23,207 1,373 6,865 14.09 200.00 26.75 33.75 41.00 46.40 46.40 467.50 805.00 5/18/2004
6. Lianga 104 D 1 1 1 265.00 30.65 35.25 41.50 48.75 48.75 571.50 924.00 3/8/2005
7. Madrid 504 D 1 110.00 13.55 16.15 18.85 21.60 21.60 245.50 407.00 7/18/2003
8. Tagbina 419 D 5 187.00 20.10 21.90 24.25 27.10 27.10 388.00 607.00 6/28/2005
9. Tandag City 105 C 6 1 173.00 20.75 24.50 28.50 32.80 32.80 380.50 625.50 1/14/2001
Total/Average 6 28 10 23,207 1,373 5,684 14.09 149.52 17.78 20.62 24.00 27.31 27.31 327.38 533.60

Tarlac - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camiling 43 C 16 6/30/2005 141,120 5,844 29,220 20.12 170.00 19.00 21.00 23.00 26.00 30.00 360.00 570.00 6/27/2001
2. Concepcion 134 B 21 6/30/2005 143,672 4,518 22,590 23.37 125.00 13.50 14.75 16.25 18.00 20.00 260.00 407.50 4/16/2001
3. Gerona 222 C 10 120.00 13.20 14.65 16.40 18.40 20.70 252.00 398.50 7/10/2000
4. Mayantoc 335 D 1 7 215.00 23.00 26.20 29.75 33.65 37.90 445.00 707.00 2/8/2005
5. Moncada 60 C 11 150.00 16.00 17.25 18.75 20.50 22.50 310.00 482.50 2/5/2002
6. Paniqui 58 C 10 165.00 17.60 19.00 21.10 23.95 27.40 341.00 531.00 1/24/2001
7. Ramos 482 C 4 157.00 16.20 16.70 17.20 17.20 17.20 319.00 486.00 2/12/2002
8. Sta. Ignacia 413 D 5 138.00 14.10 14.40 14.70 14.70 14.70 279.00 423.00 6/11/2002
9. Tarlac City 14 B 29 6/30/2005 559,124 16,856 84,280 27.64 185.00 20.00 21.75 23.75 26.00 28.50 385.00 602.50 7/8/2003
Total/Average 1 113 843,916 27,218 112,683 25.32 147.22 15.73 17.08 18.66 20.47 22.61 304.61 475.50

Tawi-Tawi - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongao 301 D 6 123.00 14.50 16.00 17.00 18.00 18.00 268.00 428.00 8/24/1999
Total/Average 6 130.00 15.50 17.10 18.20 19.20 19.20 285.00 456.00

Western Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Basey 215 D 1 1 179.00 18.90 20.40 22.40 24.90 24.90 368.00 572.00 2/28/1998
2. Calbayog City 284 B 1 2 287.00 33.15 36.00 40.00 44.75 44.75 618.50 978.50 11/23/2004
3. Calbiga 491 D 1 1 125.00 13.05 13.70 14.45 14.45 14.45 255.50 392.50 4/15/1996
4. Catbalogan City 107 C 1 6 3 6/30/2005 92,948 3,710 18,550 20.88 140.00 15.55 17.10 19.85 22.85 22.85 295.50 466.50 4/13/1999
Total/Average 4 10 3 92,948 3,710 15,359 20.88 158.75 17.58 18.97 21.30 22.98 23.15 334.62 524.37

Zambales - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabangan 505 D 4 220.00 24.00 25.75 27.75 30.00 32.50 460.00 717.50 6/25/2005
2. Candelaria 541 D 3 150.00 15.70 16.65 17.85 19.15 20.45 307.00 473.50 9/18/2001
3. Castillejos 551 C 12 150.00 16.00 17.25 18.75 20.50 22.50 310.00 482.50 5/28/2002
4. Iba 238 D 3 120.00 13.00 14.25 15.75 17.50 17.50 250.00 392.50 3/31/1997
5. Masinloc 430 D 1 1 70.00 7.30 7.75 8.30 8.30 8.30 143.00 220.50 3/25/1996
6. Palauig 529 D 1 98.00 10.50 11.00 11.50 11.50 11.50 203.00 313.00 10/12/1998
7. San Antonio 152 D 6 1 6/30/2005 30,196 1,292 6,460 19.48 215.00 23.20 24.65 26.45 28.55 29.45 447.00 693.50 2/1/2005
8. San Felipe 472 D 8 130.00 13.80 14.55 15.45 16.45 17.55 268.00 413.50 2/15/2000
9. San Marcelino 427 C 6 220.00 23.05 24.45 26.10 28.10 30.45 450.50 695.00 12/10/2002
10. San Narciso 307 D 7 180.00 25.50 26.10 26.85 27.75 28.75 435.00 696.00 5/21/2002
11. Sta. Cruz 365 D 6 6/30/2005 13,790 808 4,040 14.22 108.00 11.40 12.00 12.60 12.60 12.60 222.00 342.00 1/23/1995
12. Subic 126 C 3 25 102.00 11.50 13.00 15.00 15.00 15.00 217.00 347.00 4/20/1999
Total/Average 4 83 1 43,986 2,100 8,694 17.45 134.41 14.20 15.06 16.06 16.78 17.34 276.45 427.08

Zamboanga Sibugay - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ipil-Titay 492 D 11 1 160.00 17.10 18.40 20.40 22.60 22.60 331.00 515.00 5/27/2003
Total/Average 11 1 160.00 17.10 18.40 20.40 22.60 22.60 331.00 515.00

Zamboanga del Norte - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dapitan City 184 C 5 2 165.60 17.20 19.15 21.35 21.35 21.35 337.60 529.10 1/29/2002
2. Dipolog City 179 B 15 6/30/2005 233,907 7,818 39,090 17.86 165.00 28.20 30.00 31.80 33.60 35.40 447.00 747.00 6/27/2001
3. Labason 205 D 3 165.00 28.20 30.00 31.80 33.60 35.40 447.00 747.00 6/27/2001
4. Liloy 187 D 1 4 160.00 18.00 20.25 23.00 23.00 23.00 340.00 542.50 3/16/2004
5. Polanco 532 C 7 6/30/2005 25,070 1,429 7,145 15.21 150.00 22.00 25.00 29.00 35.00 35.00 370.00 620.00 2/26/2003
6. Pres. M.A. Roxas 506 D 2 234.00 35.00 37.50 40.50 40.50 40.50 584.00 959.00 6/25/2002
7. Rizal 514 D 2 84.00 9.60 10.80 12.00 12.00 12.00 180.00 288.00 8/28/1995
8. Sindangan 479 D 1 154.00 16.50 17.90 19.50 19.50 19.50 319.00 498.00 3/25/2003
9. Siocon 98 D 1 180.00 19.60 22.10 25.30 29.20 29.20 376.00 597.00 9/21/2004
Total/Average 5 30 9 258,977 9,247 38,283 17.45 155.82 20.06 21.96 24.34 25.75 25.98 356.45 576.13

Zamboanga del Sur - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kumalarang 241 D 2 149.75 17.95 20.95 24.50 24.50 24.50 329.25 538.75 10/23/2001
2. Pagadian City 51 B 11 9 160.00 17.85 20.00 22.40 25.00 27.75 338.50 538.50 3/11/2003
3. Tukuran 465 D 1 1 120.00 13.50 15.00 16.50 16.50 16.50 255.00 405.00 8/20/2002
4. Zamboanga City 6 A 23 7 90.00 11.00 12.00 13.00 14.00 15.00 200.00 320.00 2/28/2000
Total/Average 35 20 126.18 14.67 16.55 18.58 19.37 20.21 272.93 438.43

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.