Region | Operational WD Count | Surface | Wells | Springs | Production m3/month | Service Connections | Population Served | Ave. Cons. m3/month | Min. Charge 10 m3 | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 40 | 3 | 389 | 18 | 148.77 | 16.13 | 17.58 | 19.54 | 21.19 | 21.19 | 310.13 | 485.96 | ||||
02 | 22 | 5 | 218 | 9 | 155.26 | 17.24 | 19.00 | 21.21 | 22.70 | 22.70 | 327.69 | 517.74 | ||||
03 | 77 | 31 | 1,343 | 8 | 130.11 | 13.83 | 14.96 | 16.45 | 17.72 | 19.00 | 268.44 | 418.08 | ||||
04 | 66 | 17 | 1,638 | 83 | 126.89 | 13.74 | 15.19 | 17.01 | 18.98 | 19.26 | 264.36 | 416.29 | ||||
05 | 36 | 31 | 201 | 101 | 122.78 | 14.01 | 15.52 | 17.54 | 19.34 | 19.44 | 262.95 | 418.15 | ||||
06 | 58 | 18 | 338 | 39 | 140.74 | 16.19 | 18.11 | 20.41 | 21.86 | 22.21 | 302.65 | 483.80 | ||||
07 | 13 | 19 | 320 | 67 | 116.17 | 13.48 | 15.32 | 19.49 | 21.91 | 22.52 | 251.00 | 404.25 | ||||
08 | 25 | 14 | 74 | 34 | 136.15 | 15.09 | 16.93 | 19.24 | 21.11 | 21.22 | 287.09 | 456.48 | ||||
09 | 14 | 5 | 76 | 30 | 132.02 | 16.46 | 18.05 | 19.92 | 20.88 | 21.23 | 296.66 | 477.20 | ||||
10 | 18 | 11 | 167 | 78 | 108.57 | 13.00 | 15.10 | 17.23 | 18.61 | 19.08 | 238.66 | 389.70 | ||||
11 | 14 | 9 | 257 | 11 | 133.15 | 14.24 | 15.86 | 17.84 | 20.05 | 20.31 | 275.55 | 434.17 | ||||
12 | 21 | 3 | 191 | 21 | 142.80 | 15.36 | 17.09 | 18.80 | 20.13 | 20.72 | 296.49 | 467.40 | ||||
ARMM | 6 | 5 | 13 | 20 | 97.50 | 10.60 | 11.87 | 13.32 | 14.20 | 14.20 | 203.58 | 322.33 | ||||
CAR | 7 | 1 | 100 | 8 | 102.28 | 11.28 | 13.30 | 16.36 | 17.12 | 17.12 | 215.08 | 348.15 | ||||
CARAGA | 19 | 32 | 69 | 38 | 115.41 | 13.93 | 16.09 | 18.64 | 21.09 | 21.86 | 254.78 | 415.70 | ||||
Total/Average | 436 | 204 | 5,394 | 565 | 131.69 | 14.65 | 16.24 | 18.28 | 19.90 | 20.35 | 278.19 | 440.68 |
Province | Region | Operational WD Count | Surface | Wells | Springs | Production m3/month | Service Connections | Population Served | Ave. Cons. m3/month | Min. Charge 10 m3 | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Abra | CAR | 3 | 5 | 1 | 107.00 | 12.92 | 14.13 | 15.63 | 17.33 | 17.33 | 236.20 | 377.53 | |||||
Agusan Del Norte | CARAGA | 3 | 1 | 19 | 1 | 110.66 | 15.03 | 16.70 | 19.06 | 20.85 | 22.85 | 261.00 | 428.00 | ||||
Agusan Del Sur | CARAGA | 4 | 10 | 14 | 16 | 90.25 | 9.81 | 11.01 | 12.31 | 13.57 | 14.58 | 188.37 | 298.50 | ||||
Aklan | 06 | 5 | 2 | 28 | 141.72 | 16.15 | 18.36 | 21.36 | 22.97 | 22.97 | 303.22 | 486.82 | |||||
Albay | 05 | 6 | 1 | 46 | 22 | 114.15 | 12.47 | 14.05 | 16.33 | 18.31 | 18.31 | 238.90 | 379.48 | ||||
Antique | 06 | 8 | 14 | 8 | 110.45 | 13.33 | 15.36 | 17.57 | 17.94 | 17.94 | 243.82 | 397.51 | |||||
Aurora | 03 | 2 | 1 | 1 | 127.00 | 13.05 | 14.10 | 14.67 | 14.67 | 14.67 | 257.50 | 398.50 | |||||
Basilan | ARMM | 3 | 5 | 3 | 12 | 96.66 | 9.93 | 10.96 | 12.36 | 13.60 | 13.60 | 196.00 | 305.66 | ||||
Bataan | 03 | 9 | 194 | 5 | 101.77 | 10.72 | 11.77 | 13.14 | 14.41 | 14.68 | 209.00 | 326.77 | |||||
Batangas | 04 | 16 | 765 | 2 | 120.22 | 13.18 | 14.48 | 16.15 | 18.79 | 18.98 | 252.10 | 396.91 | |||||
Benguet | CAR | 2 | 1 | 92 | 7 | 170.00 | 18.85 | 23.95 | 32.20 | 32.20 | 32.20 | 358.50 | 598.00 | ||||
Biliran | 08 | 1 | 1 | 3 | 64.60 | 8.90 | 9.70 | 10.55 | 11.50 | 12.65 | 153.60 | 250.60 | |||||
Bohol | 07 | 2 | 1 | 9 | 5 | 125.00 | 13.95 | 15.37 | 17.32 | 19.35 | 19.35 | 264.50 | 418.25 | ||||
Bukidnon | 10 | 5 | 10 | 59 | 35 | 113.00 | 14.00 | 17.28 | 20.79 | 22.56 | 23.42 | 253.00 | 425.80 | ||||
Bulacan | 03 | 22 | 17 | 505 | 131.40 | 14.27 | 15.75 | 17.80 | 19.64 | 21.78 | 274.18 | 431.77 | |||||
Cagayan | 02 | 8 | 3 | 70 | 7 | 138.87 | 14.76 | 16.02 | 17.41 | 18.48 | 18.48 | 286.50 | 446.75 | ||||
Camarines Norte | 05 | 2 | 6 | 13 | 8 | 152.00 | 17.75 | 19.90 | 24.07 | 28.35 | 28.35 | 329.50 | 528.50 | ||||
Camarines Sur | 05 | 13 | 8 | 80 | 52 | 129.63 | 15.21 | 16.73 | 18.68 | 20.90 | 20.96 | 281.83 | 449.13 | ||||
Camiguin | 10 | 1 | 12 | 40.00 | 4.15 | 4.80 | 5.60 | 7.00 | 8.80 | 81.50 | 129.50 | ||||||
Capiz | 06 | 7 | 3 | 11 | 5 | 163.28 | 19.95 | 22.18 | 24.32 | 25.25 | 25.25 | 362.85 | 584.71 | ||||
Catanduanes | 05 | 5 | 15 | 7 | 5 | 82.80 | 9.17 | 9.95 | 11.08 | 11.33 | 11.33 | 174.50 | 274.00 | ||||
Cavite | 04 | 11 | 378 | 9 | 123.92 | 13.63 | 15.32 | 17.01 | 19.43 | 20.00 | 260.29 | 413.56 | |||||
Cebu | 07 | 5 | 6 | 258 | 34 | 104.22 | 11.52 | 13.13 | 19.74 | 21.66 | 21.66 | 219.46 | 350.80 | ||||
Compostela Valley | 11 | 1 | 18 | 156.50 | 16.55 | 19.45 | 24.05 | 29.75 | 29.75 | 322.00 | 516.50 | ||||||
Davao (Del Norte) | 11 | 4 | 9 | 67 | 4 | 157.82 | 16.58 | 17.66 | 19.68 | 21.97 | 22.87 | 323.70 | 500.32 | ||||
Davao Del Sur | 11 | 5 | 127 | 6 | 124.52 | 13.80 | 15.85 | 17.93 | 20.83 | 20.83 | 262.52 | 421.02 | |||||
Davao Oriental | 11 | 4 | 45 | 1 | 113.42 | 11.86 | 13.18 | 14.33 | 14.75 | 14.75 | 232.07 | 363.90 | |||||
Eastern Samar | 08 | 6 | 1 | 13 | 5 | 152.75 | 16.80 | 18.60 | 20.95 | 22.36 | 22.36 | 320.83 | 506.91 | ||||
Guimaras | 08 | 2 | 28 | 6 | 144.87 | 18.67 | 23.45 | 31.67 | 34.42 | 34.42 | 331.62 | 566.12 | |||||
Ifugao | CAR | 1 | 3 | 45.00 | 1.50 | 1.75 | 2.00 | 2.00 | 2.00 | 60.00 | 77.50 | ||||||
Ilocos Norte | 01 | 5 | 78 | 4 | 166.03 | 18.04 | 19.82 | 22.07 | 24.09 | 24.09 | 346.43 | 544.63 | |||||
Ilocos Sur | 01 | 5 | 2 | 29 | 2 | 152.50 | 17.61 | 19.04 | 20.35 | 21.47 | 21.47 | 328.60 | 519.00 | ||||
Iloilo | 06 | 19 | 10 | 89 | 2 | 143.19 | 15.32 | 16.63 | 18.14 | 19.25 | 19.33 | 296.45 | 462.81 | ||||
Isabela | 02 | 12 | 140 | 163.56 | 18.61 | 20.67 | 23.44 | 25.08 | 25.08 | 349.69 | 556.44 | ||||||
La Union | 01 | 5 | 49 | 9 | 165.25 | 17.66 | 19.12 | 21.59 | 23.16 | 23.16 | 341.85 | 533.05 | |||||
Laguna | 04 | 9 | 251 | 14 | 113.20 | 12.13 | 13.48 | 15.35 | 16.87 | 17.25 | 234.58 | 369.47 | |||||
Lanao Del Norte | 10 | 6 | 27 | 8 | 102.45 | 12.05 | 13.15 | 14.13 | 14.22 | 14.22 | 222.99 | 354.50 | |||||
Lanao Del Sur | ARMM | 2 | 3 | 6 | 82.50 | 9.17 | 10.62 | 12.32 | 12.60 | 12.60 | 174.25 | 280.50 | |||||
Leyte | 08 | 9 | 8 | 24 | 15 | 129.56 | 14.66 | 16.89 | 19.17 | 21.20 | 21.30 | 276.17 | 445.07 | ||||
Maguindanao | ARMM | 1 | 1 | 9 | 1 | 160.00 | 17.70 | 20.45 | 23.20 | 26.05 | 26.05 | 337.00 | 541.50 | ||||
Masbate | 05 | 2 | 8 | 201.50 | 24.30 | 25.90 | 27.60 | 29.65 | 29.65 | 444.50 | 703.50 | ||||||
Misamis Occidental | 10 | 2 | 1 | 25 | 5 | 132.00 | 14.30 | 16.50 | 18.42 | 19.55 | 20.80 | 275.00 | 440.00 | ||||
Misamis Oriental | 10 | 4 | 56 | 18 | 117.65 | 14.77 | 17.18 | 19.75 | 22.68 | 22.68 | 265.40 | 437.27 | |||||
Mt. Province | CAR | 1 | 10.00 | 1.00 | 1.10 | 1.25 | 1.50 | 1.50 | 20.00 | 31.00 | |||||||
Negros Occidental | 06 | 17 | 3 | 168 | 18 | 142.21 | 16.66 | 18.68 | 21.08 | 23.42 | 24.52 | 308.89 | 495.74 | ||||
Negros Oriental | 07 | 5 | 12 | 46 | 26 | 128.03 | 15.01 | 17.30 | 20.34 | 23.90 | 25.48 | 278.15 | 451.15 | ||||
North Cotabato | 12 | 10 | 2 | 60 | 10 | 143.49 | 15.01 | 16.36 | 17.90 | 19.49 | 19.72 | 293.64 | 457.29 | ||||
Northern Samar | 08 | 4 | 1 | 16 | 2 | 147.50 | 15.80 | 17.03 | 18.83 | 21.03 | 21.03 | 305.50 | 475.87 | ||||
Nueva Ecija | 03 | 16 | 9 | 211 | 1 | 153.06 | 15.97 | 16.98 | 18.25 | 19.62 | 21.13 | 312.78 | 482.61 | ||||
Occidental Mindoro | 04 | 2 | 35 | 137.50 | 14.00 | 15.00 | 17.00 | 19.50 | 19.50 | 277.50 | 427.50 | ||||||
Oriental Mindoro | 04 | 4 | 1 | 9 | 116.95 | 12.47 | 13.78 | 15.47 | 16.10 | 16.10 | 241.70 | 379.57 | |||||
Palawan | 04 | 2 | 10 | 40 | 4 | 147.50 | 16.00 | 17.25 | 19.00 | 21.25 | 21.25 | 307.50 | 480.00 | ||||
Pampanga | 03 | 9 | 236 | 112.94 | 11.97 | 12.77 | 14.08 | 14.44 | 14.85 | 232.66 | 360.44 | ||||||
Pangasinan | 01 | 25 | 1 | 233 | 3 | 141.27 | 15.15 | 16.53 | 18.46 | 20.16 | 20.16 | 292.83 | 458.20 | ||||
Quezon | 04 | 13 | 6 | 97 | 51 | 137.70 | 14.99 | 16.50 | 18.43 | 19.69 | 20.00 | 287.66 | 452.70 | ||||
Quirino | 02 | 2 | 1 | 6 | 171.00 | 18.95 | 20.90 | 23.02 | 25.32 | 25.32 | 360.50 | 569.50 | |||||
Rizal | 04 | 5 | 55 | 2 | 166.60 | 17.89 | 19.83 | 22.42 | 25.44 | 25.79 | 345.50 | 543.80 | |||||
Romblon | 04 | 2 | 8 | 1 | 77.42 | 8.30 | 9.75 | 12.17 | 14.02 | 14.02 | 160.42 | 257.92 | |||||
Sarangani | 12 | 2 | 7 | 4 | 125.00 | 13.25 | 14.12 | 15.12 | 16.25 | 16.25 | 257.50 | 398.75 | |||||
Siquijor | 07 | 1 | 7 | 2 | 99.00 | 14.70 | 16.30 | 18.40 | 18.40 | 18.40 | 246.00 | 409.00 | |||||
Sorsogon | 05 | 8 | 1 | 47 | 14 | 116.12 | 12.74 | 14.44 | 16.49 | 17.76 | 18.08 | 243.56 | 388.00 | ||||
South Cotabato | 12 | 7 | 96 | 4 | 139.71 | 15.48 | 17.72 | 19.63 | 21.65 | 21.65 | 294.57 | 471.78 | |||||
Southern Leyte | 08 | 1 | 10 | 6 | 109.00 | 12.50 | 15.50 | 20.20 | 26.80 | 26.80 | 234.00 | 389.00 | |||||
Sultan Kudarat | 12 | 1 | 19 | 2 | 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 | |||||
Surigao Del Norte | CARAGA | 4 | 14 | 8 | 7 | 137.80 | 17.42 | 21.58 | 26.17 | 30.78 | 31.91 | 312.05 | 527.92 | ||||
Surigao Del Sur | CARAGA | 8 | 6 | 28 | 10 | 118.58 | 13.84 | 15.65 | 17.89 | 20.10 | 20.10 | 257.02 | 413.58 | ||||
Tarlac | 03 | 9 | 1 | 113 | 138.88 | 14.78 | 16.11 | 17.62 | 19.11 | 20.77 | 286.77 | 447.88 | |||||
Tawi Tawi | ARMM | 1 | 6 | 130.00 | 15.50 | 17.10 | 18.20 | 19.20 | 19.20 | 285.00 | 456.00 | ||||||
Western Samar | 08 | 4 | 4 | 10 | 3 | 139.42 | 14.98 | 16.61 | 19.17 | 20.11 | 20.27 | 289.30 | 455.42 | ||||
Zambales | 03 | 12 | 4 | 83 | 1 | 124.66 | 13.18 | 13.98 | 14.92 | 15.57 | 16.08 | 256.50 | 396.33 | ||||
Zamboanga Del Norte | 09 | 8 | 5 | 30 | 9 | 140.95 | 18.61 | 20.29 | 22.30 | 23.28 | 23.50 | 327.13 | 530.07 | ||||
Zamboanga Del Sur | 09 | 5 | 35 | 20 | 112.15 | 12.89 | 14.40 | 16.02 | 16.70 | 17.32 | 241.05 | 385.05 | |||||
Zamboanga Sibugay | 09 | 1 | 11 | 1 | 160.00 | 17.10 | 18.40 | 20.40 | 22.60 | 22.60 | 331.00 | 515.00 | |||||
Total/Average | 436 | 204 | 5,394 | 565 | 131.69 | 14.65 | 16.24 | 18.28 | 19.90 | 20.35 | 278.19 | 440.68 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bucay | 642 | D | 1 | ||||||||||||||||
2. Dolores | 456 | D | 1 | 147.00 | 15.41 | 16.35 | 17.50 | 18.90 | 18.90 | 301.10 | 464.60 | 4/13/1999 | |||||||
3. Lagangilang | 442 | D | 1 | 147.00 | 15.41 | 16.35 | 17.50 | 18.90 | 18.90 | 301.10 | 464.60 | 4/13/1999 | |||||||
4. Metro Bangued | 28 | B | 1 | 132.00 | 15.35 | 18.05 | 21.40 | 25.10 | 25.10 | 285.50 | 466.00 | 11/13/2000 | |||||||
5. Pilar | 662 | D | 132.00 | 15.35 | 18.05 | 21.40 | 25.10 | 25.10 | 285.50 | 466.00 | 11/13/2000 | ||||||||
6. Sal-Lapadan | 688 | D | 132.00 | 15.35 | 18.05 | 21.40 | 25.10 | 25.10 | 285.50 | 466.00 | 11/13/2000 | ||||||||
7. San Isidro | 692 | D | 132.00 | 15.35 | 18.05 | 21.40 | 25.10 | 25.10 | 285.50 | 466.00 | 11/13/2000 | ||||||||
8. San Juan | 453 | D | 1 | 132.00 | 15.35 | 18.05 | 21.40 | 25.10 | 25.10 | 285.50 | 466.00 | 11/13/2000 | |||||||
Total/Average | 5 | 1 | 107.00 | 12.92 | 14.13 | 15.63 | 17.33 | 17.33 | 236.20 | 377.53 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Buenavista | 406 | C | 5 | 175.00 | 20.40 | 23.50 | 27.00 | 31.00 | 31.00 | 379.00 | 614.00 | 10/25/2000 | |||||||
2. Butuan City | 7 | A | 1 | 7 | 105.00 | 19.30 | 21.00 | 24.65 | 28.00 | 34.00 | 298.00 | 508.00 | 9/25/2001 | ||||||
3. Las Nieves | 871 | D | 1 | 105.00 | 19.30 | 21.00 | 24.65 | 28.00 | 34.00 | 298.00 | 508.00 | 9/25/2001 | |||||||
4. Nasipit | 211 | C | 6 | 1 | 131.00 | 14.60 | 16.30 | 18.15 | 20.15 | 20.15 | 277.00 | 440.00 | 4/10/2002 | ||||||
Total/Average | 1 | 19 | 1 | 110.66 | 15.03 | 16.70 | 19.06 | 20.85 | 22.85 | 261.00 | 428.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bayugan | 243 | C | 9 | 5 | 204.80 | 22.40 | 24.95 | 28.15 | 32.00 | 36.45 | 428.80 | 678.30 | 11/20/2001 | ||||||
2. Bunawan | 549 | D | 4 | 2 | 80.00 | 8.50 | 9.00 | 9.50 | 9.50 | 9.50 | 165.00 | 255.00 | 8/9/1996 | ||||||
3. Prosperidad | 66 | D | 1 | 171.00 | 18.25 | 21.75 | 25.90 | 30.40 | 30.40 | 353.50 | 571.00 | 12/10/2002 | |||||||
4. San Francisco | 399 | C | 10 | 8 | 126.00 | 14.00 | 15.80 | 17.75 | 19.80 | 22.10 | 266.00 | 424.00 | 1/23/1999 | ||||||
5. Sibagat | 682 | D | 1 | 126.00 | 14.00 | 15.80 | 17.75 | 19.80 | 22.10 | 266.00 | 424.00 | 1/23/1999 | |||||||
Total/Average | 10 | 14 | 16 | 90.25 | 9.81 | 11.01 | 12.31 | 13.57 | 14.58 | 188.37 | 298.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Ibajay | 434 | D | 5 | 139.60 | 14.95 | 16.75 | 18.15 | 18.15 | 18.15 | 289.10 | 456.60 | 11/17/1997 | |||||||
2. Libacao | 364 | D | 1 | 139.60 | 14.95 | 16.75 | 18.15 | 18.15 | 18.15 | 289.10 | 456.60 | 11/17/1997 | |||||||
3. Madalag | 669 | D | 4 | 139.60 | 14.95 | 16.75 | 18.15 | 18.15 | 18.15 | 289.10 | 456.60 | 11/17/1997 | |||||||
4. Malay (Caticlan) | 559 | D | 1 | 208.00 | 23.10 | 25.75 | 28.90 | 32.60 | 32.60 | 439.00 | 696.50 | 6/3/2003 | |||||||
5. Malinao | 258 | D | 1 | 154.00 | 15.40 | 18.50 | 24.65 | 24.65 | 24.65 | 308.00 | 493.00 | 10/23/2001 | |||||||
6. Metro Kalibo | 73 | B | 1 | 14 | 205.00 | 21.35 | 22.50 | 23.95 | 25.50 | 25.50 | 418.50 | 643.50 | 11/12/2002 | ||||||
7. Numancia | 259 | D | 2 | 205.00 | 21.35 | 22.50 | 23.95 | 25.50 | 25.50 | 418.50 | 643.50 | 11/12/2002 | |||||||
Total/Average | 2 | 28 | 141.72 | 16.15 | 18.36 | 21.36 | 22.97 | 22.97 | 303.22 | 486.82 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bacacay | 135 | D | 2 | 1 | 168.00 | 17.65 | 19.80 | 22.65 | 26.85 | 26.85 | 344.50 | 542.50 | 2/3/2004 | ||||||
2. Camalig | 125 | C | 2 | 4 | 230.60 | 24.05 | 25.30 | 27.00 | 27.00 | 29.00 | 471.10 | 724.10 | 7/24/2001 | ||||||
3. Daraga | 172 | C | 12 | 5 | 180.00 | 19.90 | 22.80 | 24.35 | 28.10 | 28.10 | 379.00 | 607.00 | 2/3/2004 | ||||||
4. Legazpi City | 173 | B | 1 | 14 | 3 | 122.00 | 13.50 | 15.10 | 16.95 | 19.10 | 19.10 | 257.00 | 408.00 | 2/10/2004 | |||||
5. Ligao City | 149 | C | 9 | 5 | 43.90 | 5.30 | 6.80 | 8.75 | 8.75 | 8.75 | 96.90 | 164.90 | 6/24/1996 | ||||||
6. Tabaco | 13 | B | 7 | 4 | 90.00 | 10.40 | 12.45 | 16.75 | 19.60 | 19.60 | 194.00 | 318.50 | 1/24/2001 | ||||||
Total/Average | 1 | 46 | 22 | 114.15 | 12.47 | 14.05 | 16.33 | 18.31 | 18.31 | 238.90 | 379.48 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Barbaza | 497 | D | 2 | 122.00 | 14.00 | 15.25 | 16.50 | 16.50 | 16.50 | 262.00 | 414.50 | 8/18/2001 | |||||||
2. Belison | 602 | D | 1 | 122.00 | 14.00 | 15.25 | 16.50 | 16.50 | 16.50 | 262.00 | 414.50 | 8/18/2001 | |||||||
3. Bugasong | 348 | D | 3 | 1 | 122.00 | 14.00 | 15.25 | 16.50 | 16.50 | 16.50 | 262.00 | 414.50 | 8/18/2001 | ||||||
4. Culasi | 274 | D | 1 | 1 | 86.00 | 9.30 | 11.20 | 13.70 | 13.70 | 13.70 | 179.00 | 291.00 | 8/19/1996 | ||||||
5. Hamtic | 267 | D | 1 | 111.00 | 15.00 | 16.00 | 17.00 | 17.00 | 17.00 | 261.00 | 421.00 | 2/6/1995 | |||||||
6. Pandan | 523 | C | 3 | 108.60 | 11.95 | 12.50 | 13.05 | 13.05 | 13.05 | 228.10 | 353.10 | 4/1/2002 | |||||||
7. Patnongon | 296 | D | 2 | 108.60 | 11.95 | 12.50 | 13.05 | 13.05 | 13.05 | 228.10 | 353.10 | 4/1/2002 | |||||||
8. Sibalom | 249 | D | 5 | 142.00 | 18.35 | 22.75 | 27.35 | 32.10 | 32.10 | 325.50 | 553.00 | 11/20/2001 | |||||||
9. Tobias Fornier | 257 | D | 1 | 1 | 142.00 | 18.35 | 22.75 | 27.35 | 32.10 | 32.10 | 325.50 | 553.00 | 11/20/2001 | ||||||
Total/Average | 14 | 8 | 110.45 | 13.33 | 15.36 | 17.57 | 17.94 | 17.94 | 243.82 | 397.51 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Baler | 233 | D | 1 | 79.00 | 8.00 | 8.80 | 8.80 | 8.80 | 8.80 | 159.00 | 247.00 | 5/1/1995 | |||||||
2. Dipaculao | 408 | D | 1 | 200.00 | 21.50 | 23.25 | 25.25 | 27.50 | 27.50 | 415.00 | 647.50 | 3/16/2004 | |||||||
Total/Average | 1 | 1 | 127.00 | 13.05 | 14.10 | 14.67 | 14.67 | 14.67 | 257.50 | 398.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Isabela City | 330 | C | 4 | 3 | 5 | 85.00 | 8.60 | 9.50 | 10.50 | 11.00 | 11.00 | 171.00 | 266.00 | 6/8/1998 | |||||
2. Lamitan City | 269 | C | 3 | 125.00 | 13.50 | 15.00 | 18.00 | 22.00 | 22.00 | 260.00 | 410.00 | 4/17/2002 | |||||||
3. Maluso | 512 | D | 1 | 4 | 143.00 | 14.50 | 15.60 | 16.70 | 17.80 | 17.80 | 288.00 | 444.00 | 2/10/2004 | ||||||
Total/Average | 5 | 3 | 12 | 96.66 | 9.93 | 10.96 | 12.36 | 13.60 | 13.60 | 196.00 | 305.66 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bagac | 272 | D | 14 | 158.00 | 18.20 | 20.80 | 25.10 | 28.80 | 28.80 | 340.00 | 548.00 | 12/1/1997 | |||||||
2. Balanga City | 124 | B | 47 | 1 | 72.00 | 7.75 | 8.50 | 9.50 | 10.75 | 10.75 | 149.50 | 234.50 | 5/25/1998 | ||||||
3. Dinalupihan | 409 | B | 21 | 1 | 145.00 | 15.20 | 16.30 | 17.40 | 18.85 | 20.30 | 297.00 | 460.00 | 9/25/2000 | ||||||
4. Hermosa | 286 | C | 11 | 165.00 | 18.25 | 19.25 | 20.50 | 22.00 | 23.75 | 347.50 | 540.00 | 12/11/2000 | |||||||
5. Limay | 379 | B | 27 | 85.00 | 8.70 | 9.20 | 9.60 | 10.00 | 10.00 | 172.00 | 264.00 | 2/12/1996 | |||||||
6. Mariveles | 48 | B | 31 | 65.00 | 7.00 | 8.10 | 9.75 | 11.50 | 11.50 | 135.00 | 216.00 | 11/17/1997 | |||||||
7. Morong | 264 | D | 3 | 85.00 | 9.00 | 10.20 | 11.50 | 11.50 | 11.50 | 175.00 | 277.00 | 1/27/1996 | |||||||
8. Orani | 54 | B | 14 | 3 | 135.00 | 14.25 | 15.50 | 17.00 | 18.50 | 18.50 | 277.50 | 432.50 | 6/23/1997 | ||||||
9. Orion | 527 | C | 26 | 70.00 | 7.50 | 8.25 | 9.25 | 10.50 | 10.50 | 145.00 | 227.50 | 3/3/1997 | |||||||
Total/Average | 194 | 5 | 101.77 | 10.72 | 11.77 | 13.14 | 14.41 | 14.68 | 209.00 | 326.77 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Agoncillo | 347 | C | 14 | 122.00 | 14.50 | 15.75 | 17.25 | 38.00 | 38.00 | 267.00 | 424.50 | 2/23/1999 | |||||||
2. Alitagtag | 373 | C | 10 | 180.20 | 20.00 | 22.25 | 24.75 | 27.50 | 27.50 | 380.20 | 602.70 | 1/15/2002 | |||||||
3. Balayan | 109 | C | 10 | 160.00 | 18.00 | 21.00 | 25.00 | 28.00 | 28.00 | 340.00 | 550.00 | 7/31/2000 | |||||||
4. Batangas City | 8 | A | 30 | 118.00 | 14.45 | 15.60 | 17.10 | 18.65 | 18.65 | 262.50 | 418.50 | 1/12/2000 | |||||||
5. Lemery | 169 | C | 18 | 150.00 | 16.00 | 17.50 | 18.95 | 20.50 | 20.50 | 310.00 | 485.00 | 4/1/2000 | |||||||
6. Lian | 609 | D | 5 | 150.00 | 16.00 | 17.50 | 18.95 | 20.50 | 20.50 | 310.00 | 485.00 | 4/1/2000 | |||||||
7. Lobo | 422 | C | 13 | 1 | 220.00 | 23.00 | 24.50 | 26.50 | 29.00 | 29.00 | 450.00 | 695.00 | 9/10/2002 | ||||||
8. Mabini | 93 | C | 27 | 160.00 | 18.00 | 20.25 | 22.75 | 25.50 | 25.50 | 340.00 | 542.50 | 1/22/2001 | |||||||
9. Metro Lipa | 12 | A | 493 | 116.70 | 12.80 | 14.50 | 16.70 | 19.50 | 19.50 | 244.70 | 389.70 | 2/13/2001 | |||||||
10. Nasugbu | 155 | C | 7 | 155.00 | 16.60 | 18.05 | 19.90 | 22.50 | 25.45 | 321.00 | 501.50 | 9/11/2001 | |||||||
11. Rosario | 111 | C | 9 | 160.00 | 17.00 | 18.50 | 20.50 | 23.00 | 26.00 | 330.00 | 515.00 | 8/6/2003 | |||||||
12. San Juan | 55 | C | 14 | 125.00 | 13.00 | 14.00 | 15.00 | 15.00 | 15.00 | 255.00 | 395.00 | 7/6/1999 | |||||||
13. San Luis | 677 | D | 1 | 125.00 | 13.00 | 14.00 | 15.00 | 15.00 | 15.00 | 255.00 | 395.00 | 7/6/1999 | |||||||
14. Taal | 516 | C | 12 | 1 | 100.00 | 12.00 | 12.00 | 13.00 | 13.00 | 13.00 | 220.00 | 340.00 | 4/20/1993 | ||||||
15. Tanauan | 333 | B | 87 | 158.00 | 17.10 | 19.15 | 22.20 | 26.70 | 26.70 | 329.00 | 520.50 | 7/31/2002 | |||||||
16. Taysan | 470 | C | 6 | 130.00 | 14.30 | 15.20 | 16.00 | 16.00 | 16.00 | 273.00 | 425.00 | 12/11/2000 | |||||||
17. Tuy | 377 | C | 6 | 118.00 | 12.65 | 13.25 | 14.05 | 14.05 | 14.05 | 244.50 | 377.00 | 1/23/1995 | |||||||
Total/Average | 765 | 2 | 120.22 | 13.18 | 14.48 | 16.15 | 18.79 | 18.98 | 252.10 | 396.91 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Baguio City | 18 | A | 1 | 69 | 4 | 210.00 | 23.10 | 26.35 | 29.85 | 29.85 | 29.85 | 441.00 | 704.50 | 7/2/2003 | |||||
2. La Trinidad | 100 | B | 23 | 3 | 130.00 | 14.60 | 21.55 | 34.55 | 34.55 | 34.55 | 276.00 | 491.50 | 8/21/1996 | ||||||
Total/Average | 1 | 92 | 7 | 170.00 | 18.85 | 23.95 | 32.20 | 32.20 | 32.20 | 358.50 | 598.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Culaba | 872 | D | 130.00 | 14.60 | 21.55 | 34.55 | 34.55 | 34.55 | 276.00 | 491.50 | 8/21/1996 | ||||||||
2. Naval | 118 | C | 1 | 3 | 64.60 | 8.90 | 9.70 | 10.55 | 11.50 | 12.65 | 153.60 | 250.60 | 10/25/2000 | ||||||
Total/Average | 1 | 3 | 64.60 | 8.90 | 9.70 | 10.55 | 11.50 | 12.65 | 153.60 | 250.60 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Clarin | 398 | D | 5 | 132.00 | 14.00 | 14.85 | 16.00 | 17.25 | 17.25 | 272.00 | 420.50 | 2/15/2000 | |||||||
2. Talibon | 80 | D | 1 | 9 | 175.00 | 20.40 | 23.40 | 27.60 | 32.15 | 32.15 | 379.00 | 613.00 | 11/23/1998 | ||||||
Total/Average | 1 | 9 | 5 | 125.00 | 13.95 | 15.37 | 17.32 | 19.35 | 19.35 | 264.50 | 418.25 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Cabanglasan | 620 | D | 2 | 175.00 | 20.40 | 23.40 | 27.60 | 32.15 | 32.15 | 379.00 | 613.00 | 11/23/1998 | |||||||
2. Damulog | 639 | D | 1 | 175.00 | 20.40 | 23.40 | 27.60 | 32.15 | 32.15 | 379.00 | 613.00 | 11/23/1998 | |||||||
3. Don Carlos | 248 | D | 1 | 9 | 4 | 231.00 | 33.60 | 44.35 | 55.40 | 66.65 | 66.65 | 567.00 | 1,010.50 | 6/7/2004 | |||||
4. Kibawe | 400 | D | 4 | 105.00 | 11.00 | 12.75 | 14.50 | 15.50 | 15.50 | 215.00 | 342.50 | 7/7/1997 | |||||||
5. Lantapan | 870 | D | 2 | 105.00 | 11.00 | 12.75 | 14.50 | 15.50 | 15.50 | 215.00 | 342.50 | 7/7/1997 | |||||||
6. Malaybalay City | 33 | B | 5 | 12 | 1 | 75.00 | 10.00 | 11.30 | 12.20 | 12.80 | 13.20 | 175.00 | 288.00 | 11/11/1996 | |||||
7. Manolo Fortich | 401 | C | 1 | 10 | 15 | 75.00 | 10.00 | 11.30 | 12.20 | 12.80 | 13.20 | 175.00 | 288.00 | 11/11/1996 | |||||
8. Maramag | 496 | C | 7 | 4 | 138.00 | 15.20 | 20.25 | 26.25 | 33.65 | 33.65 | 290.00 | 492.50 | 9/11/1999 | ||||||
9. Quezon | 627 | D | 3 | 2 | 138.00 | 15.20 | 20.25 | 26.25 | 33.65 | 33.65 | 290.00 | 492.50 | 9/11/1999 | ||||||
10. Valencia City | 141 | B | 13 | 8 | 125.00 | 14.30 | 16.40 | 19.25 | 22.60 | 26.50 | 268.00 | 432.00 | 2/8/2000 | ||||||
Total/Average | 10 | 59 | 35 | 113.00 | 14.00 | 17.28 | 20.79 | 22.56 | 23.42 | 253.00 | 425.80 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Angat | 292 | B | 1 | 16 | 120.00 | 13.00 | 14.25 | 15.75 | 17.75 | 20.00 | 250.00 | 392.50 | 6/29/1999 | ||||||
2. Balagtas | 362 | D | 6 | 160.00 | 16.15 | 16.55 | 17.10 | 17.75 | 18.55 | 321.50 | 487.00 | 3/12/2001 | |||||||
3. Baliwag | 407 | A | 32 | 95.00 | 11.00 | 12.25 | 13.75 | 15.50 | 17.50 | 205.00 | 327.50 | 9/25/2000 | |||||||
4. Bocaue | 86 | C | 2 | 25 | 160.00 | 17.25 | 19.50 | 23.00 | 26.75 | 31.00 | 332.50 | 527.50 | 7/10/2000 | ||||||
5. Bulacan | 378 | B | 2 | 23 | 105.00 | 12.00 | 12.75 | 13.75 | 15.00 | 16.50 | 225.00 | 352.50 | 7/24/2001 | ||||||
6. Bustos | 369 | B | 8 | 110.00 | 11.00 | 12.10 | 14.30 | 14.30 | 14.30 | 220.00 | 341.00 | 6/18/1999 | |||||||
7. Calumpit | 140 | B | 22 | 110.00 | 11.85 | 13.20 | 15.70 | 16.70 | 16.70 | 228.50 | 360.50 | 7/6/1999 | |||||||
8. City of Malolos | 288 | A | 76 | 104.00 | 10.95 | 12.10 | 14.80 | 15.70 | 15.70 | 213.50 | 334.50 | 12/22/1997 | |||||||
9. Guiguinto | 385 | C | 25 | 160.00 | 17.00 | 18.25 | 19.75 | 21.50 | 23.50 | 330.00 | 512.50 | 8/22/2001 | |||||||
10. Hagonoy | 31 | B | 52 | 90.00 | 10.00 | 11.00 | 12.00 | 12.00 | 12.00 | 190.00 | 300.00 | 7/10/2000 | |||||||
11. Marilao | 227 | B | 2 | 33 | 150.00 | 18.00 | 21.15 | 24.45 | 27.90 | 31.50 | 330.00 | 541.50 | 4/10/2002 | ||||||
12. Meycauayan City | 251 | B | 1 | 22 | 317.60 | 46.20 | 48.50 | 54.35 | 61.70 | 70.45 | 779.60 | 1,264.60 | 5/21/2002 | ||||||
13. Norzagaray | 261 | B | 2 | 5 | 175.00 | 18.15 | 19.40 | 21.10 | 23.20 | 22.55 | 356.50 | 550.50 | 5/25/1998 | ||||||
14. Obando | 186 | C | 2 | 4 | 200.00 | 22.15 | 26.60 | 33.35 | 42.40 | 53.70 | 421.50 | 687.50 | 11/20/2001 | ||||||
15. Pandi | 271 | C | 1 | 19 | 98.00 | 10.75 | 11.60 | 12.85 | 14.35 | 14.35 | 205.50 | 321.50 | 11/17/1997 | ||||||
16. Plaridel | 277 | B | 9 | 80.00 | 8.50 | 9.50 | 10.60 | 11.80 | 13.10 | 165.00 | 260.00 | 7/24/2001 | |||||||
17. San Ildefonso | 273 | C | 18 | 110.00 | 12.00 | 13.25 | 14.75 | 16.50 | 18.50 | 230.00 | 362.50 | 4/13/1999 | |||||||
18. San Jose del Monte City | 123 | A | 2 | 43 | 234.00 | 25.80 | 28.35 | 31.05 | 33.90 | 33.90 | 492.00 | 775.50 | 3/24/2004 | ||||||
19. San Miguel | 132 | B | 20 | 119.00 | 12.20 | 13.15 | 15.40 | 17.90 | 20.75 | 241.00 | 372.50 | 5/18/1999 | |||||||
20. San Rafael | 528 | B | 23 | 190.00 | 20.71 | 22.35 | 24.25 | 26.43 | 28.89 | 397.10 | 620.60 | 2/10/2004 | |||||||
21. Santa Maria | 310 | A | 2 | 23 | 155.00 | 16.60 | 18.05 | 19.90 | 22.50 | 25.45 | 321.00 | 501.50 | 9/11/2001 | ||||||
Total/Average | 17 | 505 | 131.40 | 14.27 | 15.75 | 17.80 | 19.64 | 21.78 | 274.18 | 431.77 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Abulug | 625 | D | 4 | 155.00 | 16.60 | 18.05 | 19.90 | 22.50 | 25.45 | 321.00 | 501.50 | 9/11/2001 | |||||||
2. Amulung | 657 | D | 2 | 155.00 | 16.60 | 18.05 | 19.90 | 22.50 | 25.45 | 321.00 | 501.50 | 9/11/2001 | |||||||
3. Aparri | 68 | D | 1 | 7 | 155.00 | 16.10 | 18.40 | 20.70 | 20.70 | 20.70 | 316.00 | 500.00 | 1/12/2000 | ||||||
4. Calayan | 626 | D | 155.00 | 16.10 | 18.40 | 20.70 | 20.70 | 20.70 | 316.00 | 500.00 | 1/12/2000 | ||||||||
5. Claveria | 203 | D | 4 | 155.00 | 17.05 | 18.90 | 21.00 | 23.25 | 23.25 | 325.50 | 514.50 | 8/14/2000 | |||||||
6. Gattaran | 239 | D | 1 | 3 | 194.00 | 20.00 | 20.70 | 21.50 | 22.50 | 22.50 | 394.00 | 601.00 | 2/19/2002 | ||||||
7. Gonzaga | 214 | D | 3 | 172.00 | 17.75 | 18.40 | 19.25 | 20.30 | 20.30 | 349.50 | 533.50 | 6/27/2001 | |||||||
8. Lal-lo | 302 | D | 1 | 4 | 172.00 | 17.75 | 18.40 | 19.25 | 20.30 | 20.30 | 349.50 | 533.50 | 6/27/2001 | ||||||
9. Lasam | 374 | D | 1 | 172.00 | 17.75 | 18.40 | 19.25 | 20.30 | 20.30 | 349.50 | 533.50 | 6/27/2001 | |||||||
10. Metropolitan Tuguegarao | 65 | A | 30 | 6 | 65.00 | 7.20 | 8.10 | 9.15 | 9.15 | 9.15 | 137.00 | 218.00 | 3/3/1997 | ||||||
11. Penablanca | 458 | D | 4 | 170.00 | 19.20 | 22.15 | 25.50 | 29.55 | 29.55 | 362.00 | 583.50 | 6/27/2001 | |||||||
12. Sanchez Mira | 534 | D | 3 | 135.00 | 14.00 | 14.50 | 15.00 | 15.00 | 15.00 | 275.00 | 420.00 | 8/1/1997 | |||||||
13. Santa Ana | 585 | D | 5 | 135.00 | 14.00 | 14.50 | 15.00 | 15.00 | 15.00 | 275.00 | 420.00 | 8/1/1997 | |||||||
14. Santa Praxedes | 645 | D | 135.00 | 14.00 | 14.50 | 15.00 | 15.00 | 15.00 | 275.00 | 420.00 | 8/1/1997 | ||||||||
Total/Average | 3 | 70 | 7 | 138.87 | 14.76 | 16.02 | 17.41 | 18.48 | 18.48 | 286.50 | 446.75 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Camarines Norte | 9 | B | 1 | 7 | 6 | 146.00 | 17.50 | 19.00 | 20.50 | 22.00 | 22.00 | 321.00 | 511.00 | 3/31/1997 | |||||
2. Jose Panganiban | 575 | D | 1 | 4 | 2 | 230.00 | 24.40 | 26.55 | 29.45 | 33.05 | 33.05 | 474.00 | 739.50 | 2/4/2003 | |||||
3. Paracale | 167 | D | 4 | 2 | 158.00 | 18.00 | 20.80 | 27.65 | 34.70 | 34.70 | 338.00 | 546.00 | 12/20/2000 | ||||||
Total/Average | 6 | 13 | 8 | 152.00 | 17.75 | 19.90 | 24.07 | 28.35 | 28.35 | 329.50 | 528.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Baao | 313 | C | 8 | 176.00 | 18.20 | 19.20 | 20.80 | 23.20 | 23.20 | 358.00 | 550.00 | 7/31/2000 | |||||||
2. Balatan | 445 | D | 120.00 | 15.60 | 17.20 | 19.05 | 21.20 | 21.20 | 276.00 | 448.00 | 9/25/2001 | ||||||||
3. Bato | 437 | D | 1 | 145.00 | 16.80 | 18.80 | 21.40 | 25.05 | 25.05 | 313.00 | 501.00 | 1/20/2004 | |||||||
4. Bombon | 867 | D | 1 | 145.00 | 16.80 | 18.80 | 21.40 | 25.05 | 25.05 | 313.00 | 501.00 | 1/20/2004 | |||||||
5. Cabusao | 813 | D | 1 | 145.00 | 16.80 | 18.80 | 21.40 | 25.05 | 25.05 | 313.00 | 501.00 | 1/20/2004 | |||||||
6. Calabanga | 314 | C | 6 | 5 | 214.00 | 22.40 | 23.90 | 25.90 | 28.40 | 28.40 | 438.00 | 677.00 | 2/17/2004 | ||||||
7. Del Gallego | 576 | D | 4 | 1 | 96.50 | 11.50 | 13.80 | 16.50 | 19.55 | 19.55 | 211.50 | 349.50 | 8/3/2003 | ||||||
8. Iriga City | 91 | C | 9 | 3 | 111.80 | 12.10 | 13.15 | 14.35 | 16.30 | 16.30 | 232.80 | 364.30 | 2/13/2001 | ||||||
9. Libmanan | 606 | C | 2 | 1 | 111.80 | 12.10 | 13.15 | 14.35 | 16.30 | 16.30 | 232.80 | 364.30 | 2/13/2001 | ||||||
10. Metro Naga | 106 | A | 4 | 32 | 4 | 87.50 | 10.05 | 10.80 | 11.55 | 12.30 | 13.15 | 188.00 | 296.00 | 9/18/2000 | |||||
11. Nabua | 315 | C | 1 | 3 | 183.00 | 31.45 | 34.60 | 38.85 | 43.95 | 43.95 | 497.50 | 843.50 | 4/10/2002 | ||||||
12. Ocampo | 874 | D | 1 | 1 | 183.00 | 31.45 | 34.60 | 38.85 | 43.95 | 43.95 | 497.50 | 843.50 | 4/10/2002 | ||||||
13. Pamplona | 844 | D | 183.00 | 31.45 | 34.60 | 38.85 | 43.95 | 43.95 | 497.50 | 843.50 | 4/10/2002 | ||||||||
14. Pasacao | 168 | D | 5 | 3 | 181.00 | 20.70 | 23.20 | 26.40 | 30.40 | 30.40 | 388.00 | 620.00 | 12/20/2000 | ||||||
15. Pili | 176 | B | 1 | 8 | 8 | 208.00 | 22.20 | 24.15 | 27.00 | 30.70 | 30.70 | 430.00 | 671.50 | 3/16/2004 | |||||
16. Ragay | 85 | D | 3 | 4 | 113.00 | 12.25 | 13.65 | 15.45 | 17.40 | 17.40 | 235.50 | 372.00 | 9/30/2003 | ||||||
17. Sipocot | 76 | D | 1 | 19 | 98.00 | 10.95 | 12.40 | 14.35 | 16.70 | 16.70 | 207.50 | 331.50 | 12/7/1999 | ||||||
Total/Average | 8 | 80 | 52 | 129.63 | 15.21 | 16.73 | 18.68 | 20.90 | 20.96 | 281.83 | 449.13 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Mambajao | 202 | D | 12 | 55.00 | 5.80 | 6.60 | 7.75 | 9.70 | 12.15 | 113.00 | 179.00 | 2/26/2003 | |||||||
Total/Average | 12 | 40.00 | 4.15 | 4.80 | 5.60 | 7.00 | 8.80 | 81.50 | 129.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Cuartero | 616 | D | 2 | 55.00 | 5.80 | 6.60 | 7.75 | 9.70 | 12.15 | 113.00 | 179.00 | 2/26/2003 | |||||||
2. Dao | 346 | D | 55.00 | 5.80 | 6.60 | 7.75 | 9.70 | 12.15 | 113.00 | 179.00 | 2/26/2003 | ||||||||
3. Dumalag | 712 | D | 1 | 55.00 | 5.80 | 6.60 | 7.75 | 9.70 | 12.15 | 113.00 | 179.00 | 2/26/2003 | |||||||
4. Dumarao | 112 | D | 1 | 1 | 1 | 120.00 | 12.05 | 14.40 | 16.85 | 19.40 | 19.40 | 240.50 | 384.50 | 9/1/2003 | |||||
5. Mambusao | 356 | D | 1 | 235.00 | 34.50 | 36.85 | 40.00 | 43.00 | 43.00 | 580.00 | 948.50 | 1/1/2004 | |||||||
6. Metro Roxas | 32 | A | 2 | 235.00 | 34.50 | 36.85 | 40.00 | 43.00 | 43.00 | 580.00 | 948.50 | 1/1/2004 | |||||||
7. Pilar | 82 | D | 2 | 2 | 130.00 | 17.25 | 19.50 | 21.00 | 21.00 | 21.00 | 302.50 | 497.50 | 4/11/2000 | ||||||
8. Pontevedra | 372 | D | 2 | 1 | 287.00 | 35.85 | 41.40 | 46.95 | 52.50 | 52.50 | 645.50 | 1,059.50 | 1/14/2003 | ||||||
9. Pres. Roxas | 341 | D | 3 | 190.00 | 20.90 | 21.85 | 22.80 | 23.75 | 23.75 | 399.00 | 617.50 | 9/1/2001 | |||||||
Total/Average | 3 | 11 | 5 | 163.28 | 19.95 | 22.18 | 24.32 | 25.25 | 25.25 | 362.85 | 584.71 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Baras | 455 | D | 8 | 1 | 1 | 190.00 | 20.90 | 21.85 | 22.80 | 23.75 | 23.75 | 399.00 | 617.50 | 9/1/2001 | |||||
2. Bato | 101 | D | 1 | 3 | 84.00 | 9.15 | 9.60 | 10.85 | 10.85 | 10.85 | 175.50 | 271.50 | 7/24/2001 | ||||||
3. Pandan | 380 | D | 1 | 1 | 121.00 | 13.20 | 13.50 | 14.05 | 14.05 | 14.05 | 253.00 | 388.00 | 7/31/2002 | ||||||
4. San Andres | 180 | D | 1 | 1 | 100.00 | 10.50 | 12.45 | 15.10 | 15.10 | 15.10 | 205.00 | 329.50 | 2/23/1994 | ||||||
5. Viga | 570 | D | 1 | 1 | 75.00 | 9.00 | 10.00 | 11.00 | 12.00 | 12.00 | 165.00 | 265.00 | 9/15/1998 | ||||||
6. Virac | 181 | C | 4 | 3 | 60.00 | 7.00 | 7.25 | 7.50 | 7.75 | 7.75 | 130.00 | 202.50 | 7/31/2000 | ||||||
Total/Average | 15 | 7 | 5 | 82.80 | 9.17 | 9.95 | 11.08 | 11.33 | 11.33 | 174.50 | 274.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Amadeo | 601 | C | 16 | 60.00 | 7.00 | 7.25 | 7.50 | 7.75 | 7.75 | 130.00 | 202.50 | 7/31/2000 | |||||||
2. Carmona | 561 | B | 17 | 238.60 | 26.20 | 29.00 | 32.60 | 37.00 | 37.00 | 500.60 | 790.60 | 3/16/2004 | |||||||
3. Dasmarinas City | 83 | A | 144 | 89.00 | 10.80 | 13.15 | 15.60 | 18.45 | 18.45 | 197.00 | 328.50 | 7/31/2000 | |||||||
4. Gen. E. Aguinaldo | 555 | D | 4 | 2 | 163.00 | 17.30 | 19.70 | 23.45 | 27.60 | 27.60 | 336.00 | 533.00 | 6/3/2003 | ||||||
5. Gen. Mariano Alvarez | 393 | B | 29 | 212.00 | 22.45 | 24.25 | 27.00 | 30.75 | 30.75 | 436.50 | 679.00 | 8/31/2000 | |||||||
6. Indang | 99 | C | 15 | 3 | 120.00 | 14.20 | 15.90 | 17.40 | 17.40 | 17.40 | 262.00 | 421.00 | 6/4/2002 | ||||||
7. Maragondon | 503 | C | 5 | 98.00 | 10.00 | 12.00 | 13.00 | 16.00 | 16.00 | 198.00 | 318.00 | 9/7/1999 | |||||||
8. Mendez | 424 | C | 10 | 195.00 | 21.50 | 24.00 | 27.25 | 30.75 | 30.75 | 410.00 | 650.00 | 6/19/2002 | |||||||
9. Silang | 115 | A | 77 | 2 | 132.00 | 14.00 | 15.50 | 14.50 | 17.50 | 20.00 | 272.00 | 427.00 | 9/18/2000 | ||||||
10. Tagaytay City | 37 | B | 19 | 2 | 166.00 | 19.00 | 21.75 | 25.00 | 28.50 | 32.25 | 356.00 | 573.50 | 9/25/2000 | ||||||
11. Tanza | 358 | B | 11 | 150.00 | 15.90 | 17.10 | 18.60 | 20.40 | 20.40 | 309.00 | 480.00 | 7/31/2000 | |||||||
12. Trece Martires City | 574 | B | 31 | 130.00 | 13.95 | 14.95 | 16.00 | 18.00 | 18.00 | 269.50 | 419.00 | 6/24/2003 | |||||||
Total/Average | 378 | 9 | 123.92 | 13.63 | 15.32 | 17.01 | 19.43 | 20.00 | 260.29 | 413.56 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Balamban | 622 | C | 1 | 20 | 11 | 130.00 | 13.95 | 14.95 | 16.00 | 18.00 | 18.00 | 269.50 | 419.00 | 6/24/2003 | |||||
2. Bogo City | 577 | C | 5 | 117.00 | 13.10 | 15.00 | 17.35 | 20.30 | 20.30 | 248.00 | 398.00 | 11/24/1999 | |||||||
3. Carcar | 117 | B | 31 | 6 | 132.00 | 13.50 | 15.10 | 17.70 | 20.80 | 20.80 | 267.00 | 418.00 | 1/7/2003 | ||||||
4. Daanbantayan | 632 | D | 18 | 132.00 | 13.50 | 15.10 | 17.70 | 20.80 | 20.80 | 267.00 | 418.00 | 1/7/2003 | |||||||
5. Dalaguete | 436 | C | 5 | 3 | 100.60 | 11.25 | 12.40 | 14.65 | 16.75 | 16.75 | 213.10 | 337.10 | 7/15/1997 | ||||||
6. Medellin | 873 | D | 100.60 | 11.25 | 12.40 | 14.65 | 16.75 | 16.75 | 213.10 | 337.10 | 7/15/1997 | ||||||||
7. Metro Cebu | 11 | A | 5 | 140 | 108.51 | 11.97 | 14.07 | 38.61 | 38.61 | 38.61 | 228.21 | 368.91 | 6/15/2000 | ||||||
8. Moalboal | 476 | C | 2 | 2 | 115.00 | 13.00 | 14.75 | 17.00 | 20.00 | 20.00 | 245.00 | 392.50 | 9/30/2003 | ||||||
9. Pinamungajan | 420 | C | 16 | 5 | 116.00 | 11.30 | 13.00 | 15.70 | 17.25 | 17.25 | 229.00 | 359.00 | 5/27/2003 | ||||||
10. Tabuelan | 617 | D | 3 | 116.00 | 11.30 | 13.00 | 15.70 | 17.25 | 17.25 | 229.00 | 359.00 | 5/27/2003 | |||||||
11. Toledo City | 195 | B | 20 | 4 | 116.00 | 11.30 | 13.00 | 15.70 | 17.25 | 17.25 | 229.00 | 359.00 | 5/27/2003 | ||||||
Total/Average | 6 | 258 | 34 | 104.22 | 11.52 | 13.13 | 19.74 | 21.66 | 21.66 | 219.46 | 350.80 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Compostela | 863 | D | 3 | 116.00 | 11.30 | 13.00 | 15.70 | 17.25 | 17.25 | 229.00 | 359.00 | 5/27/2003 | |||||||
2. Nabunturan | 146 | D | 15 | 156.50 | 16.55 | 19.45 | 24.05 | 29.75 | 29.75 | 322.00 | 516.50 | 1/6/2004 | |||||||
Total/Average | 18 | 156.50 | 16.55 | 19.45 | 24.05 | 29.75 | 29.75 | 322.00 | 516.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Baganga | 154 | D | 3 | 75.00 | 7.80 | 8.50 | 9.50 | 9.50 | 9.50 | 153.00 | 238.00 | 9/16/1996 | |||||||
2. Lupon | 428 | D | 3 | 210.00 | 22.20 | 24.80 | 27.45 | 30.15 | 30.15 | 432.00 | 680.00 | 4/1/2003 | |||||||
3. Mati City | 35 | C | 31 | 100.00 | 10.75 | 11.67 | 12.90 | 12.90 | 12.90 | 207.50 | 324.20 | 9/22/1995 | |||||||
4. San Isidro | 161 | D | 4 | 151.00 | 16.05 | 18.20 | 19.15 | 19.15 | 19.15 | 311.50 | 493.50 | 1/12/2000 | |||||||
5. Tarragona | 847 | D | 4 | 1 | 151.00 | 16.05 | 18.20 | 19.15 | 19.15 | 19.15 | 311.50 | 493.50 | 1/12/2000 | ||||||
Total/Average | 45 | 1 | 113.42 | 11.86 | 13.18 | 14.33 | 14.75 | 14.75 | 232.07 | 363.90 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Asuncion | 685 | D | 3 | 151.00 | 16.05 | 18.20 | 19.15 | 19.15 | 19.15 | 311.50 | 493.50 | 1/12/2000 | |||||||
2. Braulio E. Dujali | 579 | D | 2 | 262.00 | 27.50 | 29.15 | 31.00 | 33.35 | 33.35 | 537.00 | 828.50 | 6/25/2002 | |||||||
3. Carmen | 319 | D | 4 | 248.50 | 25.65 | 28.55 | 31.55 | 34.60 | 34.60 | 505.00 | 790.50 | 1/13/2004 | |||||||
4. Island Garden City of Samal | 564 | C | 8 | 37 | 155.90 | 17.70 | 19.85 | 22.00 | 24.15 | 24.15 | 332.90 | 531.40 | 5/20/2003 | ||||||
5. Kapalong | 665 | D | 1 | 155.90 | 17.70 | 19.85 | 22.00 | 24.15 | 24.15 | 332.90 | 531.40 | 5/20/2003 | |||||||
6. New Corella | 552 | D | 4 | 187.56 | 21.95 | 23.65 | 25.40 | 27.25 | 27.25 | 407.06 | 643.56 | 3/10/2004 | |||||||
7. Panabo City | 200 | C | 13 | 194.35 | 19.60 | 20.60 | 23.35 | 26.25 | 26.25 | 390.35 | 596.35 | 2/17/2004 | |||||||
8. Tagum City | 175 | A | 1 | 7 | 138.85 | 14.55 | 15.70 | 19.30 | 23.35 | 27.50 | 284.35 | 441.35 | 6/29/1999 | ||||||
Total/Average | 9 | 67 | 4 | 157.82 | 16.58 | 17.66 | 19.68 | 21.97 | 22.87 | 323.70 | 500.32 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bansalan | 57 | C | 2 | 4 | 170.00 | 20.00 | 23.00 | 26.00 | 29.00 | 29.00 | 370.00 | 600.00 | 8/22/2001 | ||||||
2. Davao City | 5 | A | 112 | 2 | 80.00 | 8.40 | 10.85 | 14.40 | 21.00 | 21.00 | 164.00 | 272.50 | 5/23/2000 | ||||||
3. Digos City | 147 | B | 10 | 183.90 | 20.50 | 23.35 | 26.95 | 31.25 | 31.25 | 388.90 | 622.40 | 12/4/2001 | |||||||
4. Hagonoy | 548 | D | 2 | 114.00 | 12.50 | 14.50 | 15.00 | 16.00 | 16.00 | 239.00 | 384.00 | 1/13/1997 | |||||||
5. Kiblawan | 507 | D | 1 | 130.00 | 13.75 | 14.55 | 15.40 | 16.30 | 16.30 | 267.50 | 413.00 | 1/22/2002 | |||||||
Total/Average | 127 | 6 | 124.52 | 13.80 | 15.85 | 17.93 | 20.83 | 20.83 | 262.52 | 421.02 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Dinagat | 833 | D | 130.00 | 13.75 | 14.55 | 15.40 | 16.30 | 16.30 | 267.50 | 413.00 | 1/22/2002 | ||||||||
2. San Jose (Dinagat Island) | 578 | D | 1 | 4 | 130.00 | 13.75 | 14.55 | 15.40 | 16.30 | 16.30 | 267.50 | 413.00 | 1/22/2002 | ||||||
Total/Average | 1 | 4 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Borongan | 116 | D | 1 | 4 | 210.00 | 22.00 | 24.00 | 27.00 | 31.00 | 31.00 | 430.00 | 670.00 | 1/2/2003 | ||||||
2. Gen. Macarthur | 568 | D | 1 | 1 | 172.00 | 19.50 | 22.00 | 25.00 | 28.50 | 28.50 | 367.00 | 587.00 | 2/27/2001 | ||||||
3. Guiuan | 201 | D | 6 | 228.00 | 24.20 | 25.90 | 28.00 | 30.50 | 30.50 | 470.00 | 729.00 | 11/26/2002 | |||||||
4. Llorente | 220 | D | 2 | 100.00 | 12.30 | 13.15 | 14.00 | 14.00 | 14.00 | 223.00 | 354.50 | 3/23/1994 | |||||||
5. Oras | 276 | D | 1 | 100.00 | 12.30 | 13.15 | 14.00 | 14.00 | 14.00 | 223.00 | 354.50 | 3/23/1994 | |||||||
6. Sulat | 425 | D | 1 | 138.00 | 14.20 | 15.00 | 15.90 | 15.90 | 15.90 | 280.00 | 430.00 | 12/20/2000 | |||||||
7. Taft | 584 | D | 1 | 1 | 185.00 | 20.00 | 22.00 | 24.50 | 27.50 | 27.50 | 385.00 | 605.00 | 3/18/2003 | ||||||
Total/Average | 1 | 13 | 5 | 152.75 | 16.80 | 18.60 | 20.95 | 22.36 | 22.36 | 320.83 | 506.91 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Buenavista | 164 | C | 22 | 1 | 185.00 | 20.00 | 22.00 | 24.50 | 27.50 | 27.50 | 385.00 | 605.00 | 3/18/2003 | ||||||
2. Jordan | 289 | D | 6 | 4 | 177.35 | 22.50 | 27.30 | 32.75 | 38.25 | 38.25 | 402.35 | 675.35 | 11/27/2000 | ||||||
3. Nueva Valencia | 242 | D | 1 | 177.35 | 22.50 | 27.30 | 32.75 | 38.25 | 38.25 | 402.35 | 675.35 | 11/27/2000 | |||||||
Total/Average | 28 | 6 | 144.87 | 18.67 | 23.45 | 31.67 | 34.42 | 34.42 | 331.62 | 566.12 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Banaue | 861 | D | 1 | 177.35 | 22.50 | 27.30 | 32.75 | 38.25 | 38.25 | 402.35 | 675.35 | 11/27/2000 | |||||||
2. Ifugao | 325 | D | 2 | 45.00 | 1.50 | 1.75 | 2.00 | 2.00 | 2.00 | 60.00 | 77.50 | 2/17/1989 | |||||||
Total/Average | 3 | 45.00 | 1.50 | 1.75 | 2.00 | 2.00 | 2.00 | 60.00 | 77.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bangui | 799 | D | 1 | 45.00 | 1.50 | 1.75 | 2.00 | 2.00 | 2.00 | 60.00 | 77.50 | 2/17/1989 | |||||||
2. Batac | 250 | D | 14 | 190.00 | 20.00 | 21.50 | 23.50 | 26.00 | 26.00 | 390.00 | 605.00 | 7/13/1999 | |||||||
3. Dingras | 208 | D | 10 | 220.00 | 22.90 | 23.85 | 24.90 | 26.10 | 26.10 | 449.00 | 687.50 | 12/17/2002 | |||||||
4. Ilocos Norte | 210 | B | 45 | 2 | 155.00 | 17.80 | 21.35 | 25.25 | 30.00 | 30.00 | 333.00 | 546.50 | 1/28/2000 | ||||||
5. Pagudpud | 706 | D | 1 | 155.00 | 17.80 | 21.35 | 25.25 | 30.00 | 30.00 | 333.00 | 546.50 | 1/28/2000 | |||||||
6. San Nicolas | 207 | C | 6 | 116.15 | 13.60 | 15.10 | 17.85 | 17.85 | 17.85 | 252.15 | 403.15 | 6/25/2002 | |||||||
7. Sarrat | 350 | D | 2 | 1 | 184.00 | 19.55 | 21.10 | 22.75 | 24.50 | 24.50 | 379.50 | 590.50 | 8/3/1999 | ||||||
Total/Average | 78 | 4 | 166.03 | 18.04 | 19.82 | 22.07 | 24.09 | 24.09 | 346.43 | 544.63 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Candon City | 571 | D | 1 | 184.00 | 19.55 | 21.10 | 22.75 | 24.50 | 24.50 | 379.50 | 590.50 | 8/3/1999 | |||||||
2. Magsingal | 526 | D | 4 | 184.00 | 19.55 | 21.10 | 22.75 | 24.50 | 24.50 | 379.50 | 590.50 | 8/3/1999 | |||||||
3. Metro Vigan | 53 | B | 1 | 15 | 1 | 215.50 | 25.00 | 26.00 | 27.15 | 28.45 | 28.45 | 465.50 | 725.50 | 2/27/2001 | |||||
4. Narvacan | 352 | D | 1 | 150.00 | 15.20 | 16.20 | 17.40 | 18.70 | 18.70 | 302.00 | 464.00 | 9/18/2000 | |||||||
5. Santa | 299 | D | 1 | 1 | 150.00 | 15.20 | 16.20 | 17.40 | 18.70 | 18.70 | 302.00 | 464.00 | 9/18/2000 | ||||||
6. Sinait | 573 | D | 6 | 133.00 | 14.00 | 15.00 | 16.25 | 17.60 | 17.60 | 273.00 | 423.00 | 3/7/2000 | |||||||
7. Sta. Lucia | 349 | D | 1 | 141.00 | 15.25 | 16.55 | 18.10 | 19.75 | 19.75 | 293.50 | 459.00 | 8/31/2000 | |||||||
8. Tagudin | 177 | D | 1 | 143.00 | 18.60 | 21.45 | 22.85 | 22.85 | 22.85 | 329.00 | 543.50 | 1/27/1996 | |||||||
Total/Average | 2 | 29 | 2 | 152.50 | 17.61 | 19.04 | 20.35 | 21.47 | 21.47 | 328.60 | 519.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Ajuy | 110 | D | 1 | 80.00 | 11.90 | 12.90 | 13.90 | 13.90 | 13.90 | 199.00 | 328.00 | 8/6/1996 | |||||||
2. Alimodian | 185 | D | 10 | 150.00 | 15.32 | 16.92 | 17.55 | 17.55 | 17.55 | 303.20 | 472.40 | 5/5/1997 | |||||||
3. Anilao | 331 | D | 1 | 158.00 | 17.20 | 18.95 | 21.00 | 23.40 | 23.40 | 330.00 | 519.50 | 11/23/1999 | |||||||
4. Banate | 318 | D | 5 | 165.00 | 16.85 | 17.95 | 19.65 | 21.90 | 21.90 | 333.50 | 513.00 | 6/1/2004 | |||||||
5. Calinog | 363 | D | 1 | 6 | 162.00 | 16.55 | 17.20 | 18.20 | 18.20 | 18.20 | 327.50 | 499.50 | 4/1/2004 | ||||||
6. Concepcion | 375 | D | 4 | 213.75 | 22.90 | 24.60 | 26.35 | 28.15 | 28.15 | 442.75 | 688.75 | 7/6/1999 | |||||||
7. Dingle-Pototan | 77 | D | 1 | 2 | 132.00 | 13.90 | 16.80 | 20.00 | 24.00 | 24.00 | 271.00 | 439.00 | 1/1/2003 | ||||||
8. Duenas | 345 | D | 14 | 132.00 | 13.90 | 16.80 | 20.00 | 24.00 | 24.00 | 271.00 | 439.00 | 1/1/2003 | |||||||
9. Dumangas-Barotac Nuevo | 237 | C | 7 | 283.00 | 28.60 | 32.00 | 37.35 | 44.30 | 52.45 | 569.00 | 889.00 | 4/22/2003 | |||||||
10. Estancia | 360 | D | 1 | 218.00 | 24.00 | 26.50 | 29.50 | 33.00 | 33.00 | 458.00 | 723.00 | 1/1/2003 | |||||||
11. Igbaras | 390 | D | 1 | 218.00 | 24.00 | 26.50 | 29.50 | 33.00 | 33.00 | 458.00 | 723.00 | 1/1/2003 | |||||||
12. Janiuay | 226 | D | 6 | 175.00 | 19.25 | 21.00 | 22.75 | 24.50 | 24.50 | 367.50 | 577.50 | 6/1/2004 | |||||||
13. Lambunao | 225 | D | 3 | 175.00 | 19.25 | 21.00 | 22.75 | 24.50 | 24.50 | 367.50 | 577.50 | 6/1/2004 | |||||||
14. Lemery | 431 | D | 1 | 175.00 | 19.25 | 21.00 | 22.75 | 24.50 | 24.50 | 367.50 | 577.50 | 6/1/2004 | |||||||
15. Leon | 466 | D | 1 | 170.00 | 17.70 | 18.65 | 19.95 | 21.60 | 21.60 | 347.00 | 533.50 | 5/30/2000 | |||||||
16. Metro Iloilo | 71 | A | 7 | 10 | 170.00 | 17.70 | 18.65 | 19.95 | 21.60 | 21.60 | 347.00 | 533.50 | 5/30/2000 | ||||||
17. Miagao | 383 | D | 1 | 2 | 170.00 | 17.70 | 18.65 | 19.95 | 21.60 | 21.60 | 347.00 | 533.50 | 5/30/2000 | ||||||
18. New Lucena | 446 | D | 4 | 109.00 | 11.48 | 12.58 | 13.67 | 13.67 | 13.67 | 223.80 | 349.60 | 6/5/1995 | |||||||
19. San Joaquin | 388 | D | 1 | 308.00 | 31.90 | 33.30 | 34.90 | 36.85 | 36.85 | 627.00 | 960.00 | 3/16/2004 | |||||||
20. Tubungan | 595 | D | 1 | 308.00 | 31.90 | 33.30 | 34.90 | 36.85 | 36.85 | 627.00 | 960.00 | 3/16/2004 | |||||||
21. Zarraga | 508 | D | 1 | 5 | 308.00 | 31.90 | 33.30 | 34.90 | 36.85 | 36.85 | 627.00 | 960.00 | 3/16/2004 | ||||||
Total/Average | 10 | 89 | 2 | 143.19 | 15.32 | 16.63 | 18.14 | 19.25 | 19.33 | 296.45 | 462.81 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Alicia | 198 | D | 7 | 210.00 | 23.00 | 25.20 | 28.50 | 32.00 | 32.00 | 440.00 | 692.00 | 3/11/2000 | |||||||
2. Angadanan | 278 | D | 1 | 210.00 | 22.70 | 24.70 | 27.00 | 29.50 | 29.50 | 437.00 | 684.00 | 11/25/2003 | |||||||
3. Aurora | 856 | D | 5 | 210.00 | 22.70 | 24.70 | 27.00 | 29.50 | 29.50 | 437.00 | 684.00 | 11/25/2003 | |||||||
4. Benito Soliven | 283 | D | 6 | 210.00 | 22.70 | 24.70 | 27.00 | 29.50 | 29.50 | 437.00 | 684.00 | 11/25/2003 | |||||||
5. Cabagan | 182 | C | 7 | 183.00 | 30.10 | 36.10 | 43.40 | 43.40 | 43.40 | 484.00 | 845.00 | 2/18/2003 | |||||||
6. Cauayan City | 183 | B | 17 | 60.00 | 6.70 | 7.50 | 8.50 | 9.80 | 9.80 | 127.00 | 202.00 | 1/3/2000 | |||||||
7. City of Ilagan | 90 | C | 26 | 240.00 | 25.05 | 28.60 | 33.25 | 37.75 | 37.75 | 490.50 | 776.50 | 2/10/2004 | |||||||
8. Cordon | 287 | D | 3 | 325.00 | 33.65 | 35.30 | 37.35 | 39.80 | 39.80 | 661.50 | 1,014.50 | 2/12/2002 | |||||||
9. Gamu | 615 | D | 9 | 325.00 | 33.65 | 35.30 | 37.35 | 39.80 | 39.80 | 661.50 | 1,014.50 | 2/12/2002 | |||||||
10. Luna | 460 | D | 1 | 325.00 | 33.65 | 35.30 | 37.35 | 39.80 | 39.80 | 661.50 | 1,014.50 | 2/12/2002 | |||||||
11. Naguilian | 781 | D | 9 | 325.00 | 33.65 | 35.30 | 37.35 | 39.80 | 39.80 | 661.50 | 1,014.50 | 2/12/2002 | |||||||
12. Ramon | 294 | D | 4 | 265.00 | 29.85 | 33.45 | 37.30 | 41.60 | 41.60 | 563.50 | 898.00 | 2/17/2004 | |||||||
13. Reina Mercedes | 572 | D | 2 | 265.00 | 29.85 | 33.45 | 37.30 | 41.60 | 41.60 | 563.50 | 898.00 | 2/17/2004 | |||||||
14. Roxas | 199 | C | 7 | 160.00 | 16.39 | 18.10 | 20.10 | 22.25 | 22.25 | 323.90 | 504.90 | 9/24/2002 | |||||||
15. San Guillermo | 485 | D | 4 | 160.00 | 16.39 | 18.10 | 20.10 | 22.25 | 22.25 | 323.90 | 504.90 | 9/24/2002 | |||||||
16. San Manuel | 421 | D | 4 | 170.00 | 17.50 | 18.00 | 18.50 | 19.00 | 19.00 | 345.00 | 525.00 | 1/8/2002 | |||||||
17. Santiago City | 92 | B | 19 | 297.00 | 32.00 | 37.00 | 47.00 | 51.00 | 51.00 | 617.00 | 987.00 | 3/23/1999 | |||||||
18. Tumauini | 309 | C | 9 | 135.00 | 14.00 | 14.50 | 15.00 | 15.00 | 15.00 | 275.00 | 420.00 | 4/10/2002 | |||||||
Total/Average | 140 | 163.56 | 18.61 | 20.67 | 23.44 | 25.08 | 25.08 | 349.69 | 556.44 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Balaoan | 59 | D | 4 | 2 | 175.00 | 18.50 | 19.75 | 21.25 | 23.00 | 23.00 | 360.00 | 557.50 | 4/13/1999 | ||||||
2. Metro San Fernando | 16 | B | 35 | 2 | 177.00 | 18.45 | 22.10 | 27.70 | 31.05 | 31.05 | 361.50 | 582.50 | 2/18/2003 | ||||||
3. Naguilian | 84 | D | 6 | 1 | 190.00 | 19.50 | 20.60 | 22.25 | 24.45 | 24.45 | 385.00 | 591.00 | 3/16/2004 | ||||||
4. Rosario | 89 | D | 2 | 4 | 154.25 | 15.95 | 16.45 | 16.75 | 17.50 | 17.50 | 313.75 | 478.25 | 6/18/1999 | ||||||
Total/Average | 49 | 9 | 165.25 | 17.66 | 19.12 | 21.59 | 23.16 | 23.16 | 341.85 | 533.05 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Alaminos | 120 | C | 12 | 1 | 140.00 | 16.00 | 18.50 | 21.50 | 25.50 | 25.50 | 300.00 | 485.00 | 9/25/2001 | ||||||
2. Cabuyao | 596 | C | 18 | 140.00 | 16.00 | 18.50 | 21.50 | 25.50 | 25.50 | 300.00 | 485.00 | 9/25/2001 | |||||||
3. Calamba | 29 | A | 82 | 1 | 115.35 | 12.60 | 14.90 | 19.10 | 22.70 | 22.70 | 241.35 | 390.35 | 7/31/2000 | ||||||
4. Laguna | 38 | A | 16 | 136.00 | 14.05 | 16.10 | 18.50 | 20.25 | 23.90 | 276.50 | 437.50 | 2/1/2003 | |||||||
5. Mabitac | 668 | D | 1 | 136.00 | 14.05 | 16.10 | 18.50 | 20.25 | 23.90 | 276.50 | 437.50 | 2/1/2003 | |||||||
6. Pagsanjan | 122 | C | 8 | 3 | 138.80 | 15.00 | 16.40 | 18.35 | 18.35 | 18.35 | 288.80 | 452.80 | 2/22/2000 | ||||||
7. Pakil | 518 | D | 1 | 1 | 74.00 | 8.05 | 8.80 | 9.65 | 10.60 | 10.60 | 154.50 | 242.50 | 9/14/1999 | ||||||
8. San Pablo City | 4 | A | 31 | 6 | 74.00 | 8.05 | 8.80 | 9.65 | 10.60 | 10.60 | 154.50 | 242.50 | 9/14/1999 | ||||||
9. San Pedro | 170 | B | 54 | 141.90 | 14.40 | 15.05 | 15.40 | 15.80 | 15.80 | 285.90 | 436.40 | 3/11/2003 | |||||||
10. Siniloan | 395 | C | 9 | 2 | 92.75 | 10.00 | 11.00 | 12.30 | 14.15 | 14.15 | 192.75 | 302.75 | 3/20/2000 | ||||||
11. Sta. Cruz | 127 | B | 19 | 175.00 | 18.50 | 19.75 | 21.25 | 23.00 | 23.00 | 360.00 | 557.50 | 3/12/2002 | |||||||
Total/Average | 251 | 14 | 113.20 | 12.13 | 13.48 | 15.35 | 16.87 | 17.25 | 234.58 | 369.47 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bacolod | 543 | C | 3 | 109.00 | 12.25 | 13.45 | 14.10 | 14.65 | 14.65 | 231.50 | 366.00 | 6/19/2002 | |||||||
2. Kapatagan | 418 | C | 2 | 1 | 94.40 | 11.10 | 12.60 | 14.15 | 14.15 | 14.15 | 205.40 | 331.40 | 7/12/2002 | ||||||
3. Kauswagan | 540 | D | 10 | 2 | 108.00 | 11.85 | 13.15 | 14.30 | 14.30 | 14.30 | 226.50 | 358.00 | 7/17/2002 | ||||||
4. Kolambugan | 539 | D | 2 | 2 | 123.00 | 16.85 | 17.55 | 18.25 | 18.25 | 18.25 | 291.50 | 467.00 | 7/24/2003 | ||||||
5. Linamon | 517 | D | 3 | 77.00 | 8.47 | 8.86 | 9.24 | 9.24 | 9.24 | 161.70 | 250.30 | 12/7/1998 | |||||||
6. Tubod-Baroy | 228 | D | 10 | 103.35 | 11.80 | 13.30 | 14.75 | 14.75 | 14.75 | 221.35 | 354.35 | 9/16/1996 | |||||||
Total/Average | 27 | 8 | 102.45 | 12.05 | 13.15 | 14.13 | 14.22 | 14.22 | 222.99 | 354.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Marawi City | 3 | D | 3 | 90.00 | 10.35 | 12.75 | 15.65 | 16.20 | 16.20 | 193.50 | 321.00 | 7/28/1998 | |||||||
2. Wao | 519 | C | 6 | 75.00 | 8.00 | 8.50 | 9.00 | 9.00 | 9.00 | 155.00 | 240.00 | 12/13/1998 | |||||||
Total/Average | 3 | 6 | 82.50 | 9.17 | 10.62 | 12.32 | 12.60 | 12.60 | 174.25 | 280.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Abuyog | 121 | D | 3 | 240.00 | 25.70 | 28.00 | 30.85 | 34.25 | 34.25 | 497.00 | 777.00 | 4/1/2003 | |||||||
2. Babatngon | 438 | D | 1 | 1 | 240.00 | 25.70 | 28.00 | 30.85 | 34.25 | 34.25 | 497.00 | 777.00 | 4/1/2003 | ||||||
3. Baybay City | 39 | C | 2 | 2 | 9 | 78.00 | 8.90 | 9.80 | 10.45 | 11.85 | 11.85 | 167.00 | 265.00 | 8/24/1998 | |||||
4. Isabel | 521 | D | 7 | 2 | 90.00 | 10.50 | 11.00 | 11.50 | 12.20 | 12.20 | 195.00 | 305.00 | 4/17/2002 | ||||||
5. Jaro | 157 | D | 1 | 2 | 95.00 | 12.00 | 14.00 | 16.00 | 17.50 | 17.50 | 215.00 | 355.00 | 7/4/1997 | ||||||
6. Leyte Metro | 19 | B | 3 | 1 | 148.50 | 16.35 | 19.00 | 22.15 | 22.15 | 22.15 | 312.00 | 502.00 | 5/20/2003 | ||||||
7. Merida | 520 | D | 2 | 60.00 | 5.50 | 7.25 | 8.25 | 10.50 | 10.50 | 115.00 | 187.50 | 3/1/2002 | |||||||
8. Metro Carigara | 246 | B | 2 | 1 | 181.45 | 19.05 | 20.95 | 24.00 | 28.80 | 28.80 | 371.95 | 581.45 | 4/11/2000 | ||||||
9. Metro Hilongos | 189 | C | 5 | 2 | 262.00 | 28.70 | 31.20 | 34.30 | 37.60 | 37.60 | 549.00 | 861.00 | 12/16/2003 | ||||||
Total/Average | 8 | 24 | 15 | 129.56 | 14.66 | 16.89 | 19.17 | 21.20 | 21.30 | 276.17 | 445.07 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Metro Cotabato | 30 | A | 1 | 8 | 1 | 184.00 | 20.35 | 23.50 | 26.70 | 29.95 | 29.95 | 387.50 | 622.50 | 2/11/2003 | |||||
Total/Average | 1 | 9 | 1 | 160.00 | 17.70 | 20.45 | 23.20 | 26.05 | 26.05 | 337.00 | 541.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Aroroy | 137 | D | 1 | 276.00 | 28.90 | 30.30 | 32.05 | 34.00 | 34.00 | 565.00 | 868.00 | 6/24/2003 | |||||||
2. Masbate-Mobo | 69 | C | 7 | 178.00 | 25.60 | 27.10 | 29.10 | 31.60 | 31.60 | 434.00 | 705.00 | 9/18/2000 | |||||||
Total/Average | 8 | 201.50 | 24.30 | 25.90 | 27.60 | 29.65 | 29.65 | 444.50 | 703.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Metro Ozamis | 10 | B | 4 | 1 | 190.00 | 22.00 | 25.00 | 29.00 | 34.00 | 40.00 | 410.00 | 660.00 | 12/11/2001 | ||||||
2. Oroquieta City | 694 | C | 1 | 5 | 190.00 | 22.00 | 25.00 | 29.00 | 34.00 | 40.00 | 410.00 | 660.00 | 12/11/2001 | ||||||
3. Tangub City | 158 | C | 16 | 4 | 161.00 | 17.50 | 21.00 | 22.90 | 22.90 | 22.90 | 336.00 | 546.00 | 7/23/2002 | ||||||
Total/Average | 1 | 25 | 5 | 132.00 | 14.30 | 16.50 | 18.42 | 19.55 | 20.80 | 275.00 | 440.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Balingasag | 501 | D | 3 | 1 | 194.00 | 27.85 | 36.90 | 46.60 | 56.85 | 56.85 | 472.50 | 841.50 | 4/17/2002 | ||||||
2. Cagayan de Oro City | 1 | A | 25 | 1 | 90.00 | 12.50 | 13.00 | 13.50 | 14.00 | 14.00 | 215.00 | 345.00 | 10/26/1998 | ||||||
3. Claveria | 212 | D | 8 | 123.00 | 14.35 | 16.60 | 19.00 | 21.55 | 21.55 | 266.50 | 432.50 | 7/24/2003 | |||||||
4. Gingoog City | 25 | C | 23 | 6 | 208.00 | 22.00 | 24.00 | 26.00 | 28.00 | 28.00 | 428.00 | 668.00 | 10/16/2001 | ||||||
5. Tagoloan | 634 | D | 3 | 1 | 208.00 | 22.00 | 24.00 | 26.00 | 28.00 | 28.00 | 428.00 | 668.00 | 10/16/2001 | ||||||
6. Talisayan | 864 | D | 2 | 1 | 208.00 | 22.00 | 24.00 | 26.00 | 28.00 | 28.00 | 428.00 | 668.00 | 10/16/2001 | ||||||
Total/Average | 56 | 18 | 117.65 | 14.77 | 17.18 | 19.75 | 22.68 | 22.68 | 265.40 | 437.27 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bacolod City | 2 | A | 1 | 65 | 2 | 173.00 | 17.80 | 18.90 | 21.45 | 21.45 | 25.00 | 351.00 | 540.00 | 6/1/2004 | |||||
2. Bago City | 317 | C | 11 | 173.00 | 17.80 | 18.90 | 21.45 | 21.45 | 25.00 | 351.00 | 540.00 | 6/1/2004 | |||||||
3. Binalbagan | 103 | C | 5 | 230.00 | 33.00 | 37.70 | 42.70 | 48.10 | 48.10 | 560.00 | 937.00 | 7/24/2003 | |||||||
4. Cadiz City | 386 | C | 1 | 1 | 230.00 | 33.00 | 37.70 | 42.70 | 48.10 | 48.10 | 560.00 | 937.00 | 7/24/2003 | ||||||
5. Escalante | 165 | D | 2 | 2 | 144.70 | 18.10 | 22.90 | 27.70 | 32.50 | 32.50 | 325.70 | 554.70 | 4/21/1997 | ||||||
6. Himamaylan | 102 | C | 7 | 1 | 225.00 | 30.00 | 32.00 | 34.00 | 36.00 | 36.00 | 525.00 | 845.00 | 7/8/2003 | ||||||
7. Kabankalan City | 50 | C | 2 | 3 | 1 | 225.00 | 30.00 | 32.00 | 34.00 | 36.00 | 36.00 | 525.00 | 845.00 | 7/8/2003 | |||||
8. La Carlota City | 49 | C | 17 | 2 | 225.00 | 30.00 | 32.00 | 34.00 | 36.00 | 36.00 | 525.00 | 845.00 | 7/8/2003 | ||||||
9. La Castellana | 281 | D | 3 | 127.00 | 13.05 | 13.55 | 14.30 | 14.80 | 14.80 | 257.50 | 393.00 | 2/9/1998 | |||||||
10. Manapla | 234 | D | 2 | 240.00 | 26.70 | 32.10 | 37.50 | 42.90 | 42.90 | 507.00 | 828.00 | 5/12/2004 | |||||||
11. Murcia | 611 | C | 6 | 240.00 | 26.70 | 32.10 | 37.50 | 42.90 | 42.90 | 507.00 | 828.00 | 5/12/2004 | |||||||
12. Pulupandan | 631 | D | 1 | 240.00 | 26.70 | 32.10 | 37.50 | 42.90 | 42.90 | 507.00 | 828.00 | 5/12/2004 | |||||||
13. Sagay | 129 | C | 16 | 175.00 | 17.90 | 19.50 | 21.15 | 23.15 | 25.45 | 354.00 | 549.00 | 6/10/2003 | |||||||
14. Silay City | 27 | C | 10 | 200.00 | 22.00 | 26.00 | 32.00 | 39.00 | 39.00 | 420.00 | 680.00 | 6/1/2004 | |||||||
15. Sipalay | 252 | D | 1 | 279.00 | 28.50 | 29.75 | 31.25 | 33.25 | 33.25 | 564.00 | 861.50 | 11/5/2003 | |||||||
16. Talisay City | 533 | C | 9 | 190.00 | 21.95 | 25.15 | 27.90 | 33.00 | 33.00 | 409.50 | 661.00 | 12/8/1997 | |||||||
17. Victorias | 70 | C | 12 | 108.00 | 11.60 | 13.75 | 16.70 | 19.85 | 19.85 | 224.00 | 361.50 | 1/1/2003 | |||||||
Total/Average | 3 | 168 | 18 | 142.21 | 16.66 | 18.68 | 21.08 | 23.42 | 24.52 | 308.89 | 495.74 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Ayungon | 569 | D | 9 | 4 | 108.00 | 11.60 | 13.75 | 16.70 | 19.85 | 19.85 | 224.00 | 361.50 | 1/1/2003 | ||||||
2. Bais City | 530 | C | 2 | 11 | 3 | 171.00 | 18.55 | 20.65 | 23.80 | 27.70 | 27.70 | 356.50 | 563.00 | 11/13/1995 | |||||
3. Bayawan | 221 | C | 1 | 14 | 152.00 | 24.30 | 28.55 | 31.65 | 36.70 | 36.70 | 395.00 | 680.50 | 11/24/1997 | ||||||
4. Dumaguete City | 47 | B | 20 | 7/31/2003 | 767,164 | 16,786 | 83,930 | 120.00 | 13.50 | 16.50 | 20.00 | 24.00 | 24.00 | 255.00 | 420.00 | 8/26/2003 | |||
5. Sibulan | 253 | C | 9 | 7 | 165.00 | 20.25 | 22.75 | 26.25 | 30.50 | 30.50 | 367.50 | 595.00 | 7/22/1998 | ||||||
6. Tanjay | 163 | C | 1 | 1 | 2 | 139.15 | 15.30 | 17.60 | 21.10 | 26.40 | 26.40 | 292.15 | 468.15 | 4/13/1999 | |||||
Total/Average | 12 | 46 | 26 | 128.03 | 15.01 | 17.30 | 20.34 | 23.90 | 25.48 | 278.15 | 451.15 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Aleosan | 755 | D | 3 | 139.15 | 15.30 | 17.60 | 21.10 | 26.40 | 26.40 | 292.15 | 468.15 | 4/13/1999 | |||||||
2. Kabacan | 194 | C | 8 | 138.60 | 14.35 | 15.40 | 17.15 | 19.15 | 19.15 | 282.10 | 436.10 | 2/13/2001 | |||||||
3. Metro Kidapawan | 41 | A | 1 | 4 | 9 | 156.60 | 17.95 | 20.30 | 22.65 | 25.00 | 27.35 | 336.10 | 539.10 | 12/18/2001 | |||||
4. Metro Midsayap | 174 | C | 1 | 20 | 164.60 | 18.10 | 20.40 | 22.70 | 25.55 | 25.55 | 345.60 | 549.60 | 10/2/2001 | ||||||
5. Mlang | 209 | C | 7 | 233.25 | 25.05 | 26.85 | 28.85 | 31.05 | 31.05 | 483.75 | 752.25 | 1/15/2002 | |||||||
6. Pigcawayan | 477 | D | 7 | 176.65 | 18.85 | 20.05 | 21.25 | 22.45 | 22.45 | 365.15 | 565.65 | 4/27/1999 | |||||||
7. Pikit | 495 | D | 5 | 160.50 | 17.25 | 18.75 | 20.55 | 22.65 | 22.65 | 333.00 | 520.50 | 7/24/2001 | |||||||
8. Tulunan | 590 | D | 1 | 246.65 | 25.90 | 27.50 | 29.30 | 31.60 | 31.60 | 505.65 | 780.65 | 8/13/2002 | |||||||
Total/Average | 2 | 60 | 10 | 143.49 | 15.01 | 16.36 | 17.90 | 19.49 | 19.72 | 293.64 | 457.29 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Catarman | 359 | D | 4 | 158.00 | 18.50 | 21.25 | 25.50 | 30.25 | 30.25 | 343.00 | 555.50 | 1/19/2000 | |||||||
2. Gamay | 619 | D | 1 | 158.00 | 18.50 | 21.25 | 25.50 | 30.25 | 30.25 | 343.00 | 555.50 | 1/19/2000 | |||||||
3. Laoang | 381 | D | 7 | 250.00 | 26.00 | 27.50 | 29.25 | 31.25 | 31.25 | 510.00 | 785.00 | 3/5/2003 | |||||||
4. San Isidro | 557 | D | 1 | 105.00 | 11.00 | 11.55 | 12.40 | 13.50 | 13.50 | 215.00 | 330.50 | 12/11/2000 | |||||||
5. San Jose | 583 | D | 1 | 3 | 1 | 230.00 | 23.70 | 24.65 | 26.30 | 28.30 | 28.30 | 467.00 | 713.50 | 6/25/2002 | |||||
6. Victoria | 556 | D | 1 | 132.00 | 13.40 | 13.85 | 14.50 | 15.85 | 15.85 | 266.00 | 404.50 | 5/3/2001 | |||||||
Total/Average | 1 | 16 | 2 | 147.50 | 15.80 | 17.03 | 18.83 | 21.03 | 21.03 | 305.50 | 475.87 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bongabon | 410 | C | 1 | 18 | 265.00 | 27.50 | 29.25 | 31.65 | 34.70 | 38.05 | 540.00 | 832.50 | 12/10/2002 | ||||||
2. Cabanatuan City | 15 | A | 47 | 110.00 | 11.50 | 12.50 | 14.00 | 16.00 | 19.00 | 225.00 | 350.00 | 6/15/2000 | |||||||
3. Cabiao | 414 | B | 6 | 160.00 | 16.15 | 16.30 | 16.65 | 16.65 | 16.65 | 321.50 | 484.50 | 4/4/2000 | |||||||
4. Cuyapo | 224 | D | 7 | 155.00 | 16.40 | 18.00 | 19.35 | 20.65 | 20.65 | 319.00 | 499.00 | 3/5/2003 | |||||||
5. Gapan City | 21 | C | 10 | 176.00 | 18.65 | 20.00 | 21.75 | 24.15 | 27.60 | 362.50 | 562.50 | 3/13/2000 | |||||||
6. Gen. M. Natividad | 353 | D | 3 | 240.00 | 24.70 | 25.50 | 26.35 | 27.25 | 28.20 | 487.00 | 742.00 | 10/22/2002 | |||||||
7. Gen. Tinio | 191 | C | 1 | 7 | 170.00 | 17.50 | 18.50 | 20.00 | 22.00 | 24.50 | 345.00 | 530.00 | 8/30/1999 | ||||||
8. Guimba | 295 | B | 10 | 160.00 | 17.45 | 19.15 | 21.15 | 23.40 | 25.90 | 334.50 | 526.00 | 5/3/2001 | |||||||
9. Jaen | 290 | C | 12 | 186.00 | 19.50 | 20.50 | 21.65 | 23.10 | 24.75 | 381.00 | 586.00 | 12/17/2002 | |||||||
10. Licab | 603 | C | 4 | 186.00 | 19.50 | 20.50 | 21.65 | 23.10 | 24.75 | 381.00 | 586.00 | 12/17/2002 | |||||||
11. Lupao | 316 | D | 5 | 186.00 | 19.50 | 20.50 | 21.65 | 23.10 | 24.75 | 381.00 | 586.00 | 12/17/2002 | |||||||
12. Munoz City | 328 | C | 7 | 136.00 | 14.10 | 14.85 | 16.10 | 17.60 | 19.35 | 277.00 | 425.50 | 9/11/2001 | |||||||
13. Palayan City | 343 | C | 6 | 15 | 140.00 | 14.25 | 14.75 | 15.50 | 16.50 | 16.50 | 282.50 | 430.00 | 2/13/2001 | ||||||
14. Penaranda | 306 | C | 7 | 200.00 | 20.85 | 22.15 | 23.70 | 25.35 | 27.50 | 408.50 | 630.00 | 2/13/2001 | |||||||
15. San Antonio | 131 | C | 7 | 165.00 | 17.10 | 18.40 | 20.80 | 23.00 | 25.20 | 336.00 | 520.00 | 10/2/2001 | |||||||
16. San Jose City | 36 | C | 4 | 1 | 125.00 | 13.20 | 14.20 | 15.50 | 17.10 | 19.00 | 257.00 | 399.00 | 3/22/2002 | ||||||
17. Sta. Rosa | 217 | B | 1 | 15 | 126.00 | 12.60 | 13.80 | 15.50 | 15.15 | 15.50 | 252.00 | 390.00 | 12/11/1995 | ||||||
18. Talavera | 293 | B | 16 | 180.00 | 18.30 | 18.70 | 19.30 | 20.10 | 21.00 | 363.00 | 550.00 | 5/3/2001 | |||||||
19. Talugtug | 494 | D | 10 | 180.00 | 18.30 | 18.70 | 19.30 | 20.10 | 21.00 | 363.00 | 550.00 | 5/3/2001 | |||||||
Total/Average | 9 | 211 | 1 | 153.06 | 15.97 | 16.98 | 18.25 | 19.62 | 21.13 | 312.78 | 482.61 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Diadi | 613 | D | 1 | 2 | 1 | 180.00 | 18.30 | 18.70 | 19.30 | 20.10 | 21.00 | 363.00 | 550.00 | 5/3/2001 | |||||
2. Kasibu | 759 | D | 1 | 180.00 | 18.30 | 18.70 | 19.30 | 20.10 | 21.00 | 363.00 | 550.00 | 5/3/2001 | |||||||
Total/Average | 1 | 2 | 2 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Sablayan | 197 | C | 13 | 150.00 | 15.00 | 16.00 | 18.00 | 21.00 | 21.00 | 300.00 | 460.00 | 5/18/1999 | |||||||
2. San Jose | 62 | C | 20 | 125.00 | 13.00 | 14.00 | 16.00 | 18.00 | 18.00 | 255.00 | 395.00 | 3/5/2002 | |||||||
Total/Average | 35 | 137.50 | 14.00 | 15.00 | 17.00 | 19.50 | 19.50 | 277.50 | 427.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Naujan | 245 | D | 3 | 170.00 | 18.55 | 20.65 | 23.20 | 23.20 | 23.20 | 355.50 | 562.00 | 2/5/2002 | |||||||
2. Pinamalayan | 327 | D | 1 | 3 | 155.00 | 16.60 | 18.20 | 20.90 | 23.50 | 23.50 | 321.00 | 503.00 | 2/13/2001 | ||||||
3. Pola | 96 | D | 1 | 92.60 | 9.90 | 11.60 | 13.65 | 13.65 | 13.65 | 191.60 | 307.60 | 9/25/2001 | |||||||
4. Roxas | 334 | D | 1 | 100.00 | 10.20 | 10.70 | 11.20 | 11.50 | 11.50 | 202.00 | 309.00 | 1/1/2001 | |||||||
Total/Average | 1 | 9 | 116.95 | 12.47 | 13.78 | 15.47 | 16.10 | 16.10 | 241.70 | 379.57 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Aborlan | 440 | D | 4/30/2001 | 100.00 | 10.20 | 10.70 | 11.20 | 11.50 | 11.50 | 202.00 | 309.00 | 1/1/2001 | |||||||
2. Culion | 599 | D | 1 | 4 | 100.00 | 10.20 | 10.70 | 11.20 | 11.50 | 11.50 | 202.00 | 309.00 | 1/1/2001 | ||||||
3. Puerto Princesa City | 26 | A | 9 | 36 | 150.00 | 16.00 | 17.00 | 19.00 | 22.00 | 22.00 | 310.00 | 480.00 | 7/6/1999 | ||||||
4. Roxas | 449 | D | 1 | 1 | 180.00 | 20.50 | 23.00 | 25.50 | 28.00 | 28.00 | 385.00 | 615.00 | 4/16/2001 | ||||||
5. Taytay | 604 | D | 1 | 150.00 | 16.00 | 17.00 | 18.00 | 20.00 | 20.00 | 310.00 | 480.00 | 2/15/2001 | |||||||
Total/Average | 10 | 40 | 4 | 147.50 | 16.00 | 17.25 | 19.00 | 21.25 | 21.25 | 307.50 | 480.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Angeles City | 322 | A | 40 | 122.00 | 13.15 | 13.90 | 14.65 | 14.65 | 14.65 | 253.50 | 392.50 | 1/28/2000 | |||||||
2. Bacolor | 160 | D | 7 | 122.00 | 13.15 | 13.90 | 14.65 | 14.65 | 14.65 | 253.50 | 392.50 | 1/28/2000 | |||||||
3. Candaba | 593 | C | 7 | 122.00 | 13.15 | 13.90 | 14.65 | 14.65 | 14.65 | 253.50 | 392.50 | 1/28/2000 | |||||||
4. City of San Fernando | 40 | A | 46 | 175.00 | 19.65 | 22.25 | 25.15 | 28.50 | 32.20 | 371.50 | 594.00 | 9/25/2000 | |||||||
5. Floridablanca | 256 | B | 22 | 115.00 | 12.25 | 13.00 | 13.75 | 14.50 | 15.25 | 237.50 | 367.50 | 6/6/2004 | |||||||
6. Guagua | 46 | B | 16 | 120.00 | 13.20 | 15.00 | 17.40 | 20.40 | 24.00 | 252.00 | 402.00 | 11/18/2003 | |||||||
7. Lubao | 232 | B | 19 | 104.00 | 11.10 | 11.90 | 13.00 | 13.00 | 13.00 | 215.00 | 334.00 | 5/23/2000 | |||||||
8. Mabalacat City | 61 | A | 45 | 108.00 | 11.50 | 12.60 | 14.00 | 14.00 | 14.00 | 223.00 | 349.00 | 10/11/2000 | |||||||
9. Macabebe | 171 | C | 8 | 107.50 | 10.80 | 12.00 | 13.45 | 13.45 | 13.45 | 215.50 | 335.50 | 10/26/1998 | |||||||
10. Masantol | 320 | C | 6 | 125.00 | 13.00 | 13.50 | 14.00 | 14.00 | 14.00 | 255.00 | 390.00 | 8/26/1996 | |||||||
11. Porac | 402 | C | 11 | 125.00 | 13.00 | 13.50 | 14.00 | 14.00 | 14.00 | 255.00 | 390.00 | 8/26/1996 | |||||||
12. Sasmuan | 484 | D | 7 | 130.00 | 13.20 | 13.70 | 13.95 | 13.95 | 13.95 | 262.00 | 399.00 | 7/10/2000 | |||||||
13. Sta Rita | 618 | D | 2 | 130.00 | 13.20 | 13.70 | 13.95 | 13.95 | 13.95 | 262.00 | 399.00 | 7/10/2000 | |||||||
Total/Average | 236 | 112.94 | 11.97 | 12.77 | 14.08 | 14.44 | 14.85 | 232.66 | 360.44 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Alaminos City | 34 | B | 10 | 1 | 130.00 | 13.20 | 13.70 | 13.95 | 13.95 | 13.95 | 262.00 | 399.00 | 7/10/2000 | ||||||
2. Alcala | 166 | C | 17 | 246.95 | 26.85 | 29.70 | 33.30 | 37.60 | 37.60 | 515.45 | 812.45 | 5/3/2004 | |||||||
3. Asingan | 524 | C | 5 | 220.00 | 23.00 | 24.50 | 26.50 | 29.00 | 29.00 | 450.00 | 695.00 | 2/27/2001 | |||||||
4. Balungao | 560 | D | 1 | 135.00 | 14.00 | 14.50 | 15.00 | 15.50 | 15.50 | 275.00 | 420.00 | 5/7/2002 | |||||||
5. Bani | 74 | D | 1 | 132.00 | 15.45 | 18.15 | 21.50 | 25.35 | 25.35 | 286.50 | 468.00 | 10/29/2001 | |||||||
6. Basista | 544 | D | 3 | 132.00 | 15.45 | 18.15 | 21.50 | 25.35 | 25.35 | 286.50 | 468.00 | 10/29/2001 | |||||||
7. Bayambang | 119 | C | 1 | 16 | 168.00 | 18.20 | 19.95 | 22.05 | 24.85 | 24.85 | 350.00 | 549.50 | 2/8/2000 | ||||||
8. Binalonan | 285 | C | 9 | 150.00 | 16.50 | 18.30 | 20.70 | 23.30 | 23.30 | 315.00 | 498.00 | 3/13/2001 | |||||||
9. Binmaley | 97 | B | 13 | 120.00 | 13.25 | 15.15 | 17.70 | 20.85 | 20.85 | 252.50 | 404.00 | 1/12/2000 | |||||||
10. Bugallon | 567 | D | 3 | 87.00 | 9.00 | 10.45 | 14.80 | 14.80 | 14.80 | 177.00 | 281.50 | 11/6/1990 | |||||||
11. Calasiao | 700 | D | 87.00 | 9.00 | 10.45 | 14.80 | 14.80 | 14.80 | 177.00 | 281.50 | 11/6/1990 | ||||||||
12. Dagupan City | 297 | B | 25 | 99.00 | 10.89 | 11.88 | 15.84 | 15.84 | 15.84 | 207.90 | 326.70 | 5/18/1999 | |||||||
13. Dasol | 674 | D | 2 | 99.00 | 10.89 | 11.88 | 15.84 | 15.84 | 15.84 | 207.90 | 326.70 | 5/18/1999 | |||||||
14. Lingayen | 52 | C | 12 | 215.00 | 22.45 | 23.50 | 24.75 | 26.35 | 26.35 | 439.50 | 674.50 | 3/11/2003 | |||||||
15. Manaoag | 128 | C | 5 | 1 | 180.00 | 19.00 | 20.50 | 22.50 | 25.00 | 25.00 | 370.00 | 575.00 | 11/25/2003 | ||||||
16. Mangaldan | 139 | B | 16 | 72.00 | 7.80 | 9.30 | 10.70 | 10.70 | 10.70 | 150.00 | 243.00 | 11/27/1995 | |||||||
17. Mapandan | 612 | C | 5 | 72.00 | 7.80 | 9.30 | 10.70 | 10.70 | 10.70 | 150.00 | 243.00 | 11/27/1995 | |||||||
18. Metro Tayug | 113 | C | 5 | 186.00 | 20.45 | 22.30 | 24.20 | 24.20 | 24.20 | 390.50 | 613.50 | 7/24/2003 | |||||||
19. Pozorrubio | 133 | C | 7 | 180.00 | 18.70 | 20.10 | 22.35 | 25.95 | 25.95 | 367.00 | 568.00 | 12/9/2003 | |||||||
20. Rosales | 270 | C | 9 | 144.00 | 15.20 | 16.00 | 16.80 | 16.80 | 16.80 | 296.00 | 456.00 | 9/28/1998 | |||||||
21. San Carlos City | 44 | C | 18 | 140.00 | 14.75 | 15.85 | 17.20 | 18.85 | 18.85 | 287.50 | 446.00 | 12/20/2000 | |||||||
22. San Manuel | 562 | D | 3 | 170.00 | 17.50 | 18.00 | 18.50 | 19.00 | 19.00 | 345.00 | 525.00 | 6/21/2004 | |||||||
23. San Nicolas | 255 | D | 8 | 135.00 | 14.00 | 15.00 | 16.50 | 18.50 | 18.50 | 275.00 | 425.00 | 9/21/1998 | |||||||
24. San Quintin | 553 | D | 2 | 1 | 149.00 | 15.60 | 16.90 | 18.60 | 20.65 | 20.65 | 305.00 | 474.00 | 11/6/2001 | ||||||
25. Santa Maria | 554 | C | 5 | 161.00 | 16.70 | 17.70 | 19.00 | 20.50 | 20.50 | 328.00 | 505.00 | 12/11/2001 | |||||||
26. Santo Tomas | 636 | D | 1 | 161.00 | 16.70 | 17.70 | 19.00 | 20.50 | 20.50 | 328.00 | 505.00 | 12/11/2001 | |||||||
27. Umingan | 148 | D | 10 | 143.00 | 15.25 | 16.70 | 18.90 | 20.25 | 20.25 | 295.50 | 462.50 | 1/10/2001 | |||||||
28. Urbiztondo | 304 | D | 2 | 250.00 | 26.10 | 27.30 | 28.60 | 30.00 | 30.00 | 511.00 | 784.00 | 5/25/2004 | |||||||
29. Urdaneta City | 24 | B | 9 | 226.00 | 22.90 | 23.30 | 23.80 | 24.40 | 24.40 | 455.00 | 688.00 | 1/23/2004 | |||||||
30. Villasis | 95 | C | 9 | 160.00 | 17.30 | 18.80 | 20.65 | 22.80 | 22.80 | 333.00 | 521.00 | 1/29/2002 | |||||||
Total/Average | 1 | 233 | 3 | 141.27 | 15.15 | 16.53 | 18.46 | 20.16 | 20.16 | 292.83 | 458.20 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Atimonan | 260 | D | 1 | 4 | 196.00 | 24.30 | 27.65 | 31.35 | 35.55 | 35.55 | 439.00 | 715.50 | 9/19/2000 | ||||||
2. Burdeos | 581 | D | 1 | 196.00 | 24.30 | 27.65 | 31.35 | 35.55 | 35.55 | 439.00 | 715.50 | 9/19/2000 | |||||||
3. Calauag | 78 | C | 1 | 8 | 235.00 | 29.00 | 30.00 | 35.00 | 35.00 | 35.00 | 525.00 | 825.00 | 7/2/2003 | ||||||
4. Candelaria | 114 | C | 9 | 235.00 | 29.00 | 30.00 | 35.00 | 35.00 | 35.00 | 525.00 | 825.00 | 7/2/2003 | |||||||
5. Catanauan | 531 | D | 1 | 185.00 | 19.00 | 20.50 | 22.50 | 25.00 | 25.00 | 375.00 | 580.00 | 10/29/2001 | |||||||
6. Dolores | 462 | D | 1 | 3 | 3 | 130.00 | 14.50 | 16.25 | 18.50 | 21.25 | 21.25 | 275.00 | 437.50 | 4/10/2003 | |||||
7. Guinayangan | 303 | D | 1 | 3 | 9 | 150.00 | 16.25 | 17.85 | 19.60 | 21.50 | 21.50 | 312.50 | 491.00 | 7/6/1999 | |||||
8. Gumaca | 79 | D | 9 | 180.00 | 19.00 | 20.55 | 22.55 | 22.65 | 22.65 | 370.00 | 575.50 | 6/29/1999 | |||||||
9. Infanta - Gen. Nakar | 229 | C | 6 | 151.00 | 16.45 | 18.25 | 20.65 | 20.65 | 20.65 | 315.50 | 498.00 | 6/19/2002 | |||||||
10. Lopez | 45 | D | 3 | 4 | 128.00 | 13.00 | 14.00 | 15.00 | 17.00 | 17.00 | 258.00 | 398.00 | 3/9/1999 | ||||||
11. Macalelon | 580 | D | 3 | 128.00 | 13.00 | 14.00 | 15.00 | 17.00 | 17.00 | 258.00 | 398.00 | 3/9/1999 | |||||||
12. Mauban | 298 | D | 5 | 4 | 136.00 | 14.50 | 16.00 | 18.00 | 20.50 | 20.50 | 281.00 | 441.00 | 1/29/2002 | ||||||
13. Polilio | 600 | D | 2 | 200.00 | 21.00 | 22.50 | 24.50 | 27.00 | 27.00 | 410.00 | 635.00 | 1/20/2004 | |||||||
14. Quezon Metro | 17 | A | 36 | 16 | 102.50 | 10.65 | 11.85 | 13.00 | 14.50 | 14.50 | 209.00 | 327.50 | 7/15/2003 | ||||||
15. San Francisco | 842 | D | 2 | 185.00 | 19.00 | 20.50 | 22.50 | 25.00 | 25.00 | 375.00 | 580.00 | 1/1/2001 | |||||||
16. Tagkawayan | 130 | C | 1 | 3 | 171.60 | 17.95 | 19.15 | 20.70 | 22.45 | 22.45 | 351.10 | 542.60 | 2/4/2003 | ||||||
17. Tiaong | 151 | C | 7 | 122.00 | 13.00 | 15.00 | 18.00 | 18.00 | 22.00 | 252.00 | 402.00 | 2/13/2001 | |||||||
Total/Average | 6 | 97 | 51 | 137.70 | 14.99 | 16.50 | 18.43 | 19.69 | 20.00 | 287.66 | 452.70 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Aglipay | 354 | D | 4/30/2001 | 122.00 | 13.00 | 15.00 | 18.00 | 18.00 | 22.00 | 252.00 | 402.00 | 2/13/2001 | |||||||
2. Diffun | 279 | D | 4 | 142.00 | 16.00 | 17.80 | 19.80 | 21.90 | 21.90 | 302.00 | 480.00 | 1/14/2003 | |||||||
3. Maddela | 337 | D | 1 | 1 | 177.00 | 18.00 | 18.40 | 18.90 | 19.50 | 19.50 | 357.00 | 541.00 | 9/4/2001 | ||||||
Total/Average | 1 | 6 | 171.00 | 18.95 | 20.90 | 23.02 | 25.32 | 25.32 | 360.50 | 569.50 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Morong | 144 | C | 12 | 175.00 | 19.00 | 20.95 | 23.00 | 25.15 | 27.40 | 365.00 | 574.50 | 5/13/2003 | |||||||
2. Pililla | 487 | C | 17 | 130.00 | 13.20 | 14.75 | 17.20 | 18.40 | 18.40 | 262.00 | 409.50 | 3/19/2002 | |||||||
3. Tanay | 88 | B | 15 | 2 | 188.00 | 19.80 | 22.20 | 26.50 | 33.40 | 33.40 | 386.00 | 608.00 | 6/1/2001 | ||||||
4. Teresa | 536 | C | 11 | 160.00 | 17.60 | 19.50 | 21.85 | 24.90 | 24.90 | 336.00 | 531.00 | 9/1/2003 | |||||||
Total/Average | 55 | 2 | 166.60 | 17.89 | 19.83 | 22.42 | 25.44 | 25.79 | 345.50 | 543.80 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Odiongan | 75 | D | 1 | 1 | 100.00 | 10.60 | 13.45 | 17.25 | 21.50 | 21.50 | 206.00 | 340.50 | 4/16/2001 | ||||||
2. Romblon | 64 | D | 7 | 66.55 | 7.40 | 7.80 | 9.35 | 9.35 | 9.35 | 140.55 | 218.55 | 2/2/1994 | |||||||
Total/Average | 8 | 1 | 77.42 | 8.30 | 9.75 | 12.17 | 14.02 | 14.02 | 160.42 | 257.92 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Glan | 439 | D | 5 | 205.40 | 22.35 | 25.70 | 29.05 | 34.95 | 34.95 | 428.90 | 685.90 | 2/26/2002 | |||||||
2. Maasim | 444 | D | 2 | 2 | 80.00 | 8.50 | 9.00 | 9.50 | 10.00 | 10.00 | 165.00 | 255.00 | 3/10/1997 | ||||||
3. Malungon | 592 | D | 2 | 170.00 | 18.00 | 19.25 | 20.75 | 22.50 | 22.50 | 350.00 | 542.50 | 11/25/2003 | |||||||
Total/Average | 7 | 4 | 125.00 | 13.25 | 14.12 | 15.12 | 16.25 | 16.25 | 257.50 | 398.75 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Metro Siquijor | 142 | D | 7 | 2 | 99.00 | 14.70 | 16.30 | 18.40 | 18.40 | 18.40 | 246.00 | 409.00 | 3/13/1995 | ||||||
Total/Average | 7 | 2 | 99.00 | 14.70 | 16.30 | 18.40 | 18.40 | 18.40 | 246.00 | 409.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Barcelona | 681 | D | 1 | 99.00 | 14.70 | 16.30 | 18.40 | 18.40 | 18.40 | 246.00 | 409.00 | 3/13/1995 | |||||||
2. Bulan | 22 | C | 1 | 3 | 1 | 100.00 | 11.60 | 12.25 | 13.25 | 13.25 | 13.25 | 216.00 | 338.50 | 5/7/1996 | |||||
3. Casiguran | 366 | C | 1 | 88.00 | 9.80 | 10.80 | 12.00 | 12.00 | 12.00 | 186.00 | 294.00 | 6/8/1994 | |||||||
4. Donsol | 72 | D | 4 | 255.00 | 27.35 | 30.90 | 35.50 | 40.65 | 40.65 | 528.50 | 837.50 | 9/10/2003 | |||||||
5. Gubat | 136 | C | 18 | 5 | 120.00 | 15.80 | 17.50 | 19.50 | 22.00 | 22.00 | 278.00 | 453.00 | 12/8/1997 | ||||||
6. Irosin | 586 | D | 1 | 120.00 | 13.40 | 14.40 | 15.40 | 16.40 | 16.40 | 254.00 | 398.00 | 6/25/2002 | |||||||
7. Matnog | 263 | D | 5 | 155.00 | 16.15 | 21.65 | 27.45 | 27.45 | 27.45 | 316.50 | 533.00 | 5/3/2001 | |||||||
8. Pilar | 474 | D | 5 | 192.00 | 20.20 | 21.65 | 23.60 | 25.95 | 25.95 | 394.00 | 610.50 | 6/10/2003 | |||||||
9. Sorsogon City | 20 | B | 12 | 5 | 140.00 | 15.25 | 16.85 | 18.85 | 21.40 | 24.35 | 292.50 | 461.00 | 7/2/2003 | ||||||
Total/Average | 1 | 47 | 14 | 116.12 | 12.74 | 14.44 | 16.49 | 17.76 | 18.08 | 243.56 | 388.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Banga | 230 | D | 2 | 282.75 | 31.05 | 34.00 | 37.00 | 40.10 | 40.10 | 593.25 | 933.25 | 5/14/2002 | |||||||
2. City of Koronadal | 156 | B | 23 | 119.30 | 14.60 | 17.30 | 20.05 | 22.85 | 22.85 | 265.30 | 438.30 | 2/8/2000 | |||||||
3. Gen. Santos City | 370 | A | 33 | 212.00 | 23.05 | 26.65 | 30.50 | 34.50 | 34.50 | 442.50 | 709.00 | 3/12/2001 | |||||||
4. Norala | 213 | D | 2 | 162.00 | 17.30 | 19.45 | 21.60 | 23.75 | 23.75 | 335.00 | 529.50 | 5/16/2000 | |||||||
5. Polomolok | 153 | B | 17 | 1 | 108.75 | 13.05 | 16.70 | 17.80 | 19.30 | 19.30 | 239.25 | 406.25 | 11/14/1994 | ||||||
6. Sto. Nino | 648 | D | 1 | 108.75 | 13.05 | 16.70 | 17.80 | 19.30 | 19.30 | 239.25 | 406.25 | 11/14/1994 | |||||||
7. Surallah | 500 | C | 12 | 1 | 156.00 | 16.80 | 18.95 | 21.15 | 23.40 | 23.40 | 324.00 | 513.50 | 6/26/2000 | ||||||
8. Tupi | 280 | D | 6 | 2 | 154.00 | 16.35 | 17.30 | 18.30 | 19.30 | 19.30 | 317.50 | 490.50 | 11/9/1999 | ||||||
Total/Average | 96 | 4 | 139.71 | 15.48 | 17.72 | 19.63 | 21.65 | 21.65 | 294.57 | 471.78 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Maasin City | 291 | C | 7 | 2 | 154.00 | 16.35 | 17.30 | 18.30 | 19.30 | 19.30 | 317.50 | 490.50 | 11/9/1999 | ||||||
2. Sogod | 188 | C | 3 | 4 | 109.00 | 12.50 | 15.50 | 20.20 | 26.80 | 26.80 | 234.00 | 389.00 | 10/7/2000 | ||||||
Total/Average | 10 | 6 | 109.00 | 12.50 | 15.50 | 20.20 | 26.80 | 26.80 | 234.00 | 389.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Kalamansig | 376 | D | 1 | 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 | 2/8/2000 | |||||||
2. Lebak | 499 | D | 2 | 1 | 268.10 | 27.60 | 29.35 | 31.30 | 33.40 | 33.40 | 544.10 | 837.60 | 4/28/2004 | ||||||
3. Sultan Kudarat | 247 | B | 17 | 152.40 | 16.80 | 18.80 | 20.85 | 22.95 | 22.95 | 320.40 | 508.40 | 2/15/2000 | |||||||
Total/Average | 19 | 2 | 176.00 | 20.00 | 22.50 | 25.10 | 17.90 | 27.90 | 376.00 | 601.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Jolo Mainland | 254 | C | 2 | 85.00 | 8.15 | 10.20 | 15.35 | 15.35 | 15.35 | 166.50 | 268.50 | 5/20/1992 | |||||||
Total/Average | 1 | 2 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bacuag | 515 | D | 2 | 1 | 182.00 | 20.85 | 24.00 | 27.30 | 30.75 | 30.75 | 390.50 | 630.50 | 2/12/2002 | ||||||
2. Del Carmen | 588 | D | 2 | 182.00 | 20.85 | 24.00 | 27.30 | 30.75 | 30.75 | 390.50 | 630.50 | 2/12/2002 | |||||||
3. Metro Siargao | 56 | D | 2 | 1 | 204.00 | 31.20 | 42.60 | 54.60 | 67.20 | 67.20 | 516.00 | 942.00 | 10/22/2002 | ||||||
4. Placer | 355 | C | 3 | 99.20 | 10.35 | 11.35 | 12.90 | 13.40 | 13.40 | 202.70 | 316.20 | 2/23/1999 | |||||||
5. Socorro | 628 | D | 99.20 | 10.35 | 11.35 | 12.90 | 13.40 | 13.40 | 202.70 | 316.20 | 2/23/1999 | ||||||||
6. Surigao Metro | 324 | B | 14 | 3 | 187.00 | 23.25 | 29.25 | 35.75 | 43.00 | 51.75 | 419.50 | 712.00 | 8/22/2001 | ||||||
Total/Average | 14 | 8 | 7 | 137.80 | 17.42 | 21.58 | 26.17 | 30.78 | 31.91 | 312.05 | 527.92 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Barobo | 193 | D | 2 | 187.00 | 23.25 | 29.25 | 35.75 | 43.00 | 51.75 | 419.50 | 712.00 | 8/22/2001 | |||||||
2. Bislig City | 23 | B | 1 | 3 | 7 | 178.00 | 18.55 | 20.55 | 24.50 | 29.60 | 29.60 | 363.50 | 569.00 | 1/8/2002 | |||||
3. Cantilan | 441 | D | 1 | 2 | 1 | 98.70 | 10.35 | 10.90 | 11.55 | 11.55 | 11.55 | 202.20 | 311.20 | 11/5/2003 | |||||
4. Carmen | 646 | D | 1 | 98.70 | 10.35 | 10.90 | 11.55 | 11.55 | 11.55 | 202.20 | 311.20 | 11/5/2003 | |||||||
5. Hinatuan | 143 | D | 2 | 7 | 200.00 | 26.75 | 33.75 | 41.00 | 46.40 | 46.40 | 467.50 | 805.00 | 5/18/2004 | ||||||
6. Lianga | 104 | D | 1 | 1 | 1 | 117.00 | 13.20 | 15.20 | 17.90 | 21.00 | 21.00 | 249.00 | 401.00 | 2/23/1999 | |||||
7. Madrid | 504 | D | 1 | 110.00 | 13.55 | 16.15 | 18.85 | 21.60 | 21.60 | 245.50 | 407.00 | 7/18/2003 | |||||||
8. Tagbina | 419 | D | 5 | 130.00 | 15.60 | 16.90 | 18.20 | 19.50 | 19.50 | 286.00 | 455.00 | 10/26/1998 | |||||||
9. Tandag City | 105 | C | 6 | 1 | 173.00 | 20.75 | 24.50 | 28.50 | 32.80 | 32.80 | 380.50 | 625.50 | 1/14/2001 | ||||||
Total/Average | 6 | 28 | 10 | 118.58 | 13.84 | 15.65 | 17.89 | 20.10 | 20.10 | 257.02 | 413.58 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Camiling | 43 | C | 16 | 170.00 | 19.00 | 21.00 | 23.00 | 26.00 | 30.00 | 360.00 | 570.00 | 6/27/2001 | |||||||
2. Concepcion | 134 | B | 21 | 125.00 | 13.50 | 14.75 | 16.25 | 18.00 | 20.00 | 260.00 | 407.50 | 4/16/2001 | |||||||
3. Gerona | 222 | C | 10 | 120.00 | 13.20 | 14.65 | 16.40 | 18.40 | 20.70 | 252.00 | 398.50 | 7/10/2000 | |||||||
4. Mayantoc | 335 | D | 1 | 7 | 150.00 | 15.75 | 18.00 | 20.25 | 20.25 | 20.25 | 307.50 | 487.50 | 7/17/1995 | ||||||
5. Moncada | 60 | C | 11 | 150.00 | 16.00 | 17.25 | 18.75 | 20.50 | 22.50 | 310.00 | 482.50 | 2/5/2002 | |||||||
6. Paniqui | 58 | C | 10 | 165.00 | 17.60 | 19.00 | 21.10 | 23.95 | 27.40 | 341.00 | 531.00 | 1/24/2001 | |||||||
7. Ramos | 482 | C | 4 | 157.00 | 16.20 | 16.70 | 17.20 | 17.20 | 17.20 | 319.00 | 486.00 | 2/12/2002 | |||||||
8. Sta. Ignacia | 413 | D | 5 | 138.00 | 14.10 | 14.40 | 14.70 | 14.70 | 14.70 | 279.00 | 423.00 | 6/11/2002 | |||||||
9. Tarlac City | 14 | B | 29 | 185.00 | 20.00 | 21.75 | 23.75 | 26.00 | 28.50 | 385.00 | 602.50 | 7/8/2003 | |||||||
Total/Average | 1 | 113 | 138.88 | 14.78 | 16.11 | 17.62 | 19.11 | 20.77 | 286.77 | 447.88 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Bongao | 301 | D | 6 | 123.00 | 14.50 | 16.00 | 17.00 | 18.00 | 18.00 | 268.00 | 428.00 | 8/24/1999 | |||||||
Total/Average | 6 | 130.00 | 15.50 | 17.10 | 18.20 | 19.20 | 19.20 | 285.00 | 456.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Basey | 215 | D | 1 | 1 | 179.00 | 18.90 | 20.40 | 22.40 | 24.90 | 24.90 | 368.00 | 572.00 | 2/28/1998 | ||||||
2. Calbayog City | 284 | B | 1 | 2 | 140.70 | 15.60 | 18.55 | 21.50 | 21.50 | 21.50 | 296.70 | 482.20 | 9/9/1997 | ||||||
3. Calbiga | 491 | D | 1 | 1 | 125.00 | 13.05 | 13.70 | 14.45 | 14.45 | 14.45 | 255.50 | 392.50 | 4/15/1996 | ||||||
4. Catbalogan City | 107 | C | 1 | 6 | 3 | 140.00 | 15.55 | 17.10 | 19.85 | 22.85 | 22.85 | 295.50 | 466.50 | 4/13/1999 | |||||
Total/Average | 4 | 10 | 3 | 139.42 | 14.98 | 16.61 | 19.17 | 20.11 | 20.27 | 289.30 | 455.42 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Cabangan | 505 | D | 4 | 145.00 | 15.00 | 15.45 | 15.90 | 15.90 | 15.90 | 295.00 | 449.50 | 12/14/1999 | |||||||
2. Candelaria | 541 | D | 3 | 150.00 | 15.70 | 16.65 | 17.85 | 19.15 | 20.45 | 307.00 | 473.50 | 9/18/2001 | |||||||
3. Castillejos | 551 | C | 12 | 150.00 | 16.00 | 17.25 | 18.75 | 20.50 | 22.50 | 310.00 | 482.50 | 5/28/2002 | |||||||
4. Iba | 238 | D | 3 | 120.00 | 13.00 | 14.25 | 15.75 | 17.50 | 17.50 | 250.00 | 392.50 | 3/31/1997 | |||||||
5. Masinloc | 430 | D | 1 | 1 | 70.00 | 7.30 | 7.75 | 8.30 | 8.30 | 8.30 | 143.00 | 220.50 | 3/25/1996 | ||||||
6. Palauig | 529 | D | 1 | 98.00 | 10.50 | 11.00 | 11.50 | 11.50 | 11.50 | 203.00 | 313.00 | 10/12/1998 | |||||||
7. San Antonio | 152 | D | 6 | 1 | 95.00 | 10.00 | 10.50 | 11.00 | 11.50 | 11.50 | 195.00 | 300.00 | 1/19/1998 | ||||||
8. San Felipe | 472 | D | 8 | 130.00 | 13.80 | 14.55 | 15.45 | 16.45 | 17.55 | 268.00 | 413.50 | 2/15/2000 | |||||||
9. San Marcelino | 427 | C | 6 | 220.00 | 23.05 | 24.45 | 26.10 | 28.10 | 30.45 | 450.50 | 695.00 | 12/10/2002 | |||||||
10. San Narciso | 307 | D | 7 | 180.00 | 25.50 | 26.10 | 26.85 | 27.75 | 28.75 | 435.00 | 696.00 | 5/21/2002 | |||||||
11. Sta. Cruz | 365 | D | 6 | 108.00 | 11.40 | 12.00 | 12.60 | 12.60 | 12.60 | 222.00 | 342.00 | 1/23/1995 | |||||||
12. Subic | 126 | C | 3 | 25 | 102.00 | 11.50 | 13.00 | 15.00 | 15.00 | 15.00 | 217.00 | 347.00 | 4/20/1999 | ||||||
Total/Average | 4 | 83 | 1 | 124.66 | 13.18 | 13.98 | 14.92 | 15.57 | 16.08 | 256.50 | 396.33 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Ipil-Titay | 492 | D | 11 | 1 | 160.00 | 17.10 | 18.40 | 20.40 | 22.60 | 22.60 | 331.00 | 515.00 | 5/27/2003 | ||||||
Total/Average | 11 | 1 | 160.00 | 17.10 | 18.40 | 20.40 | 22.60 | 22.60 | 331.00 | 515.00 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Dapitan City | 184 | C | 5 | 2 | 165.60 | 17.20 | 19.15 | 21.35 | 21.35 | 21.35 | 337.60 | 529.10 | 1/29/2002 | ||||||
2. Dipolog City | 179 | B | 15 | 165.00 | 28.20 | 30.00 | 31.80 | 33.60 | 35.40 | 447.00 | 747.00 | 6/27/2001 | |||||||
3. Labason | 205 | D | 3 | 165.00 | 28.20 | 30.00 | 31.80 | 33.60 | 35.40 | 447.00 | 747.00 | 6/27/2001 | |||||||
4. Liloy | 187 | D | 1 | 4 | 160.00 | 18.00 | 20.25 | 23.00 | 23.00 | 23.00 | 340.00 | 542.50 | 3/16/2004 | ||||||
5. Polanco | 532 | C | 7 | 150.00 | 22.00 | 25.00 | 29.00 | 35.00 | 35.00 | 370.00 | 620.00 | 2/26/2003 | |||||||
6. Pres. M.A. Roxas | 506 | D | 2 | 234.00 | 35.00 | 37.50 | 40.50 | 40.50 | 40.50 | 584.00 | 959.00 | 6/25/2002 | |||||||
7. Rizal | 514 | D | 2 | 84.00 | 9.60 | 10.80 | 12.00 | 12.00 | 12.00 | 180.00 | 288.00 | 8/28/1995 | |||||||
8. Sindangan | 479 | D | 1 | 154.00 | 16.50 | 17.90 | 19.50 | 19.50 | 19.50 | 319.00 | 498.00 | 3/25/2003 | |||||||
9. Siocon | 98 | D | 1 | 85.00 | 10.75 | 11.75 | 12.75 | 12.75 | 12.75 | 192.50 | 310.00 | 3/13/2000 | |||||||
Total/Average | 5 | 30 | 9 | 140.95 | 18.61 | 20.29 | 22.30 | 23.28 | 23.50 | 327.13 | 530.07 |
Water District | CCC | Category | Surface | Well | Spring | As of | Production m3/month | Service Conn. | Population Served | Ave. Cons. m3/month | Min. Charge | 11-20 m3 | 21-30 m3 | 31-40 m3 | 41-50 m3 | 51-up m3 | Cost per 20 m3 | Cost per 30 m3 | Date Approved |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. Kumalarang | 241 | D | 2 | 149.75 | 17.95 | 20.95 | 24.50 | 24.50 | 24.50 | 329.25 | 538.75 | 10/23/2001 | |||||||
2. Pagadian City | 51 | B | 11 | 9 | 160.00 | 17.85 | 20.00 | 22.40 | 25.00 | 27.75 | 338.50 | 538.50 | 3/11/2003 | ||||||
3. Tukuran | 465 | D | 1 | 1 | 120.00 | 13.50 | 15.00 | 16.50 | 16.50 | 16.50 | 255.00 | 405.00 | 8/20/2002 | ||||||
4. Zamboanga City | 6 | A | 23 | 7 | 90.00 | 11.00 | 12.00 | 13.00 | 14.00 | 15.00 | 200.00 | 320.00 | 2/28/2000 | ||||||
Total/Average | 35 | 20 | 112.15 | 12.89 | 14.40 | 16.02 | 16.70 | 17.32 | 241.05 | 385.05 |
Note: Charges apply only for a 1/2" inch domestic connection.
For other sizes and connection types the Water District applies a multiplying factor.