Water Districts Rates Data
Regional Averages
As of 6/30/2000

Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
01 13 3 389 18 123.73 13.56 15.12 17.13 18.21 18.21 259.37 410.66
02 9 5 218 9 128.31 15.75 17.85 20.67 21.53 21.53 285.86 464.42
03 30 31 1,343 8 109.38 11.54 12.50 13.80 14.64 14.97 224.81 349.81
04 29 17 1,638 83 95.85 10.16 10.91 12.09 12.67 12.74 197.52 306.65
05 14 31 201 101 102.13 11.88 13.27 14.92 15.92 16.08 221.02 353.74
06 27 18 338 39 112.45 12.78 14.46 16.33 17.17 17.32 240.34 384.98
07 10 19 320 67 96.86 11.39 12.95 14.90 16.68 16.68 210.76 340.26
08 8 14 74 34 135.56 15.25 16.78 19.10 20.32 20.40 288.12 456.00
09 6 5 76 30 99.83 12.25 13.40 14.43 15.01 15.26 222.33 356.33
10 11 11 167 78 86.72 10.32 11.62 13.04 13.94 14.44 189.96 306.25
11 3 9 257 11 81.53 8.38 9.69 11.55 13.75 13.75 165.40 262.33
12 4 3 191 21 109.17 12.12 13.92 15.08 16.35 16.35 230.42 369.67
ARMM 4 5 13 20 89.36 9.71 10.53 11.33 11.61 11.61 186.48 291.86
CAR 5 1 100 8 74.80 8.10 9.75 12.66 12.99 12.99 155.82 253.32
CARAGA 8 32 69 38 90.95 10.80 12.10 13.16 13.85 13.85 199.01 320.01
Total/Average 181 204 5,394 565 105.17 11.78 13.09 14.71 15.61 15.75 223.05 353.97

Water Districts Rates Data
Provincial Averages
As of 6/30/2000

Province Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Abra CAR 2 5 1 94.50 11.70 12.17 12.75 13.45 13.45 211.55 333.30
Agusan Del Sur CARAGA 1 10 14 16 80.00 8.50 9.00 9.50 9.50 9.50 165.00 255.00
Aklan 06 2 2 28 122.30 12.82 13.90 14.87 14.87 14.87 250.55 389.55
Albay 05 2 1 46 22 81.95 8.95 10.47 12.47 12.47 12.47 171.45 276.20
Antique 06 4 14 8 108.75 13.98 16.60 19.45 19.96 19.96 248.62 414.62
Aurora 03 2 1 1 103.00 10.55 11.45 11.80 11.80 11.80 208.50 323.00
Basilan ARMM 2 5 3 12 83.00 8.45 9.20 10.00 10.55 10.55 167.50 259.50
Bataan 03 7 194 5 92.28 9.75 10.85 12.30 13.59 13.59 189.85 298.35
Batangas 04 8 765 2 92.75 9.82 10.41 11.37 11.87 11.87 191.00 295.12
Benguet CAR 1 1 92 7 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50
Bohol 07 2 1 9 5 109.00 12.15 13.87 15.72 17.12 17.12 230.50 369.25
Bukidnon 10 4 10 59 35 98.25 11.25 13.35 15.68 17.52 18.60 210.75 344.25
Bulacan 03 8 17 505 112.62 12.15 13.26 15.13 16.41 17.23 234.18 366.87
Cagayan 02 4 3 70 7 115.00 12.47 13.60 14.80 15.17 15.17 239.75 375.75
Camarines Norte 05 1 6 13 8 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00
Camarines Sur 05 4 8 80 52 128.25 16.45 18.57 20.72 22.80 22.80 292.75 478.50
Camiguin 10 1 12 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00
Capiz 06 2 3 11 5 130.00 15.62 17.55 19.50 19.50 19.50 286.25 461.75
Catanduanes 05 3 15 7 5 73.66 8.10 9.10 10.55 10.88 10.88 154.66 245.66
Cavite 04 6 378 9 90.66 9.68 10.60 12.01 13.26 13.26 187.50 293.50
Cebu 07 4 6 258 34 90.65 9.70 10.83 12.71 14.36 14.36 187.65 296.02
Davao Del Sur 11 1 127 6 80.00 8.40 10.85 14.40 21.00 21.00 164.00 272.50
Davao Oriental 11 2 45 1 82.30 8.38 9.11 10.12 10.12 10.12 166.10 257.25
Eastern Samar 08 2 1 13 5 116.25 13.57 15.70 18.65 18.65 18.65 252.00 409.00
Ifugao CAR 1 3 45.00 1.50 1.75 2.00 2.00 2.00 60.00 77.50
Ilocos Norte 01 1 78 4 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50
Ilocos Sur 01 1 2 29 2 143.00 18.60 21.45 22.85 22.85 22.85 329.00 543.50
Iloilo 06 9 10 89 2 106.77 11.84 12.99 14.20 14.33 14.33 225.18 355.14
Isabela 02 5 140 138.96 18.38 21.26 25.37 26.62 26.62 322.76 535.36
La Union 01 2 49 9 138.15 14.15 15.42 16.25 16.62 16.62 279.65 433.90
Laguna 04 3 251 14 102.90 10.76 11.33 12.66 13.00 13.66 210.56 323.90
Lanao Del Norte 10 4 27 8 93.28 11.24 12.19 13.17 13.17 13.17 205.71 327.61
Lanao Del Sur ARMM 1 3 6 75.00 8.00 8.50 9.00 9.00 9.00 155.00 240.00
Leyte 08 3 8 24 15 145.00 16.85 18.33 20.11 22.11 22.11 313.50 496.83
Misamis Oriental 10 2 56 18 81.40 10.50 11.37 12.25 13.12 13.12 186.40 300.15
Mt. Province CAR 1 10.00 1.00 1.10 1.25 1.50 1.50 20.00 31.00
Negros Occidental 06 10 3 168 18 113.57 12.59 14.42 16.66 18.61 19.01 239.47 383.72
Negros Oriental 07 3 12 46 26 96.33 12.03 14.03 16.10 18.90 18.90 216.66 357.00
North Cotabato 12 1 2 60 10 84.75 9.60 10.75 11.90 13.05 13.05 180.75 288.25
Nueva Ecija 03 5 9 211 1 133.20 13.71 14.53 15.56 16.28 16.85 270.30 415.60
Oriental Mindoro 04 2 1 9 65.80 6.87 7.65 8.55 8.65 8.65 134.55 211.05
Palawan 04 1 10 40 4 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00
Pampanga 03 4 236 106.87 11.06 11.68 12.40 12.47 12.57 217.50 334.37
Pangasinan 01 9 1 233 3 114.91 12.40 13.67 15.78 16.74 16.74 238.95 375.65
Quezon 04 6 6 97 51 105.16 11.26 12.09 13.42 13.60 13.60 217.83 338.75
Romblon 04 1 8 1 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55
Siquijor 07 1 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00
Sorsogon 05 4 1 47 14 96.50 10.23 11.06 12.22 13.03 13.60 198.87 309.50
South Cotabato 12 3 96 4 117.31 12.96 14.98 16.15 17.45 17.45 246.98 396.81
Surigao Del Norte CARAGA 2 14 8 7 82.32 8.70 10.25 10.62 10.62 10.62 169.32 271.82
Surigao Del Sur CARAGA 5 6 28 10 96.60 12.11 13.46 14.92 16.02 16.02 217.70 352.30
Tarlac 03 1 1 113 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50
Tawi Tawi ARMM 1 6 116.45 13.95 15.25 16.35 16.35 16.35 255.95 408.45
Western Samar 08 3 4 10 3 139.00 14.78 15.96 18.40 19.65 19.86 286.83 446.50
Zambales 03 5 4 83 1 98.20 10.44 11.10 11.83 12.28 12.28 202.60 313.60
Zamboanga Del Norte 09 4 5 30 9 93.50 12.23 13.53 14.58 14.83 14.83 215.87 351.25
Zamboanga Del Sur 09 1 35 20 105.00 11.85 12.75 13.75 15.00 16.50 223.50 351.00
Zamboanga Sibugay 09 1 11 1 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00
Total/Average 181 204 5,394 565 105.17 11.78 13.09 14.71 15.61 15.75 223.05 353.97

Abra - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bucay 642 D 1
2. Dolores 456 D 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
3. Lagangilang 442 D 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
4. Metro Bangued 28 B 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
5. Pilar 662 D 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
6. Sal-Lapadan 688 D 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
7. San Isidro 692 D 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
8. San Juan 453 D 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
Total/Average 5 1 94.50 11.70 12.17 12.75 13.45 13.45 211.55 333.30

Agusan del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 406 C 5 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
2. Butuan City 7 A 1 7 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
3. Las Nieves 871 D 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
4. Nasipit 211 C 6 1 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
Total/Average 1 19 1

Agusan del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bayugan 243 C 9 5 147.00 15.41 16.35 17.50 18.90 18.90 301.10 464.60 4/13/1999
2. Bunawan 549 D 4 2 80.00 8.50 9.00 9.50 9.50 9.50 165.00 255.00 8/9/1996
3. Prosperidad 66 D 1 75.00 8.00 9.50 11.00 12.50 12.50 155.00 250.00 1/12/1999
4. San Francisco 399 C 10 8 126.00 14.00 15.80 17.75 19.80 22.10 266.00 424.00 1/23/1999
5. Sibagat 682 D 1 126.00 14.00 15.80 17.75 19.80 22.10 266.00 424.00 1/23/1999
Total/Average 10 14 16 80.00 8.50 9.00 9.50 9.50 9.50 165.00 255.00

Aklan - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ibajay 434 D 5 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
2. Libacao 364 D 1 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
3. Madalag 669 D 4 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
4. Malay (Caticlan) 559 D 1 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
5. Malinao 258 D 1 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
6. Metro Kalibo 73 B 1 14 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
7. Numancia 259 D 2 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
Total/Average 2 28 122.30 12.82 13.90 14.87 14.87 14.87 250.55 389.55

Albay - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacacay 135 D 2 1 120.00 12.60 14.15 16.20 16.20 16.20 246.00 387.50 5/16/2000
2. Camalig 125 C 2 4 120.00 12.60 14.15 16.20 16.20 16.20 246.00 387.50 5/16/2000
3. Daraga 172 C 12 5 120.00 12.60 14.15 16.20 16.20 16.20 246.00 387.50 5/16/2000
4. Legazpi City 173 B 1 14 3 120.00 12.60 14.15 16.20 16.20 16.20 246.00 387.50 5/16/2000
5. Ligao City 149 C 9 5 43.90 5.30 6.80 8.75 8.75 8.75 96.90 164.90 6/24/1996
6. Tabaco 13 B 7 4 43.90 5.30 6.80 8.75 8.75 8.75 96.90 164.90 6/24/1996
Total/Average 1 46 22 81.95 8.95 10.47 12.47 12.47 12.47 171.45 276.20

Antique - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barbaza 497 D 2 43.90 5.30 6.80 8.75 8.75 8.75 96.90 164.90 6/24/1996
2. Belison 602 D 1 43.90 5.30 6.80 8.75 8.75 8.75 96.90 164.90 6/24/1996
3. Bugasong 348 D 3 1 43.90 5.30 6.80 8.75 8.75 8.75 96.90 164.90 6/24/1996
4. Culasi 274 D 1 1 86.00 9.30 11.20 13.70 13.70 13.70 179.00 291.00 8/19/1996
5. Hamtic 267 D 1 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
6. Pandan 523 C 3 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
7. Patnongon 296 D 2 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
8. Sibalom 249 D 5 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
9. Tobias Fornier 257 D 1 1 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
Total/Average 14 8 108.75 13.98 16.60 19.45 19.96 19.96 248.62 414.62

Aurora - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baler 233 D 1 79.00 8.00 8.80 8.80 8.80 8.80 159.00 247.00 5/1/1995
2. Dipaculao 408 D 1 80.00 8.10 8.90 9.60 9.60 9.60 161.00 250.00 7/14/1997
Total/Average 1 1 103.00 10.55 11.45 11.80 11.80 11.80 208.50 323.00

Basilan - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Isabela City 330 C 4 3 5 85.00 8.60 9.50 10.50 11.00 11.00 171.00 266.00 6/8/1998
2. Lamitan City 269 C 3 85.00 8.60 9.50 10.50 11.00 11.00 171.00 266.00 6/8/1998
3. Maluso 512 D 1 4 81.00 8.30 8.90 9.50 10.10 10.10 164.00 253.00 4/14/1997
Total/Average 5 3 12 83.00 8.45 9.20 10.00 10.55 10.55 167.50 259.50

Bataan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bagac 272 D 14 158.00 18.20 20.80 25.10 28.80 28.80 340.00 548.00 12/1/1997
2. Balanga City 124 B 47 1 72.00 7.75 8.50 9.50 10.75 10.75 149.50 234.50 5/25/1998
3. Dinalupihan 409 B 21 1 72.00 7.75 8.50 9.50 10.75 10.75 149.50 234.50 5/25/1998
4. Hermosa 286 C 11 72.00 7.75 8.50 9.50 10.75 10.75 149.50 234.50 5/25/1998
5. Limay 379 B 27 85.00 8.70 9.20 9.60 10.00 10.00 172.00 264.00 2/12/1996
6. Mariveles 48 B 31 65.00 7.00 8.10 9.75 11.50 11.50 135.00 216.00 11/17/1997
7. Morong 264 D 3 85.00 9.00 10.20 11.50 11.50 11.50 175.00 277.00 1/27/1996
8. Orani 54 B 14 3 135.00 14.25 15.50 17.00 18.50 18.50 277.50 432.50 6/23/1997
9. Orion 527 C 26 70.00 7.50 8.25 9.25 10.50 10.50 145.00 227.50 3/3/1997
Total/Average 194 5 92.28 9.75 10.85 12.30 13.59 13.59 189.85 298.35

Batangas - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
2. Alitagtag 373 C 10 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
3. Balayan 109 C 10 122.00 14.50 15.75 17.25 38.00 38.00 267.00 424.50 2/23/1999
4. Batangas City 8 A 30 118.00 14.45 15.60 17.10 18.65 18.65 262.50 418.50 1/12/2000
5. Lemery 169 C 18 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
6. Lian 609 D 5 150.00 16.00 17.50 18.95 20.50 20.50 310.00 485.00 4/1/2000
7. Lobo 422 C 13 1 90.00 9.70 10.00 11.00 11.00 11.00 187.00 287.00 9/8/1997
8. Mabini 93 C 27 90.00 9.70 10.00 11.00 11.00 11.00 187.00 287.00 9/8/1997
9. Metro Lipa 12 A 493 88.00 9.70 10.00 11.00 13.00 13.00 185.00 285.00 2/13/2000
10. Nasugbu 155 C 7 106.00 11.00 12.00 14.00 14.00 14.00 216.00 336.00 12/1/1997
11. Rosario 111 C 9 88.00 9.20 9.80 10.00 11.00 11.00 180.00 278.00 12/1/1997
12. San Juan 55 C 14 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
13. San Luis 677 D 1 125.00 13.00 14.00 15.00 15.00 15.00 255.00 395.00 7/6/1999
14. Taal 516 C 12 1 100.00 12.00 12.00 13.00 13.00 13.00 220.00 340.00 4/20/1993
15. Tanauan 333 B 87 114.00 13.00 15.00 15.00 17.00 17.00 244.00 394.00 7/6/1999
16. Taysan 470 C 6 114.00 13.00 15.00 15.00 17.00 17.00 244.00 394.00 7/6/1999
17. Tuy 377 C 6 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
Total/Average 765 2 92.75 9.82 10.41 11.37 11.87 11.87 191.00 295.12

Benguet - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baguio City 18 A 1 69 4 118.00 12.65 13.25 14.05 14.05 14.05 244.50 377.00 1/23/1995
2. La Trinidad 100 B 23 3 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50 8/21/1996
Total/Average 1 92 7 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50

Biliran - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Culaba 872 D 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50 8/21/1996
2. Naval 118 C 1 3 130.00 14.60 21.55 34.55 34.55 34.55 276.00 491.50 8/21/1996
Total/Average 1 3

Bohol - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Clarin 398 D 5 132.00 14.00 14.85 16.00 17.25 17.25 272.00 420.50 2/15/2000
2. Talibon 80 D 1 9 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
Total/Average 1 9 5 109.00 12.15 13.87 15.72 17.12 17.12 230.50 369.25

Bukidnon - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabanglasan 620 D 2 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
2. Damulog 639 D 1 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
3. Don Carlos 248 D 1 9 4 172.00 25.00 33.00 41.20 42.70 42.70 422.00 752.00 9/28/1998
4. Kibawe 400 D 4 105.00 11.00 12.75 14.50 15.50 15.50 215.00 342.50 7/7/1997
5. Lantapan 870 D 2 105.00 11.00 12.75 14.50 15.50 15.50 215.00 342.50 7/7/1997
6. Malaybalay City 33 B 5 12 1 75.00 10.00 11.30 12.20 12.80 13.20 175.00 288.00 11/11/1996
7. Manolo Fortich 401 C 1 10 15 75.00 10.00 11.30 12.20 12.80 13.20 175.00 288.00 11/11/1996
8. Maramag 496 C 7 4 138.00 15.20 20.25 26.25 33.65 33.65 290.00 492.50 9/11/1999
9. Quezon 627 D 3 2 138.00 15.20 20.25 26.25 33.65 33.65 290.00 492.50 9/11/1999
10. Valencia City 141 B 13 8 125.00 14.30 16.40 19.25 22.60 26.50 268.00 432.00 2/8/2000
Total/Average 10 59 35 98.25 11.25 13.35 15.68 17.52 18.60 210.75 344.25

Bulacan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angat 292 B 1 16 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
2. Balagtas 362 D 6 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
3. Baliwag 407 A 32 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
4. Bocaue 86 C 2 25 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
5. Bulacan 378 B 2 23 120.00 13.00 14.25 15.75 17.75 20.00 250.00 392.50 6/29/1999
6. Bustos 369 B 8 110.00 11.00 12.10 14.30 14.30 14.30 220.00 341.00 6/18/1999
7. Calumpit 140 B 22 110.00 11.85 13.20 15.70 16.70 16.70 228.50 360.50 7/6/1999
8. City of Malolos 288 A 76 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
9. Guiguinto 385 C 25 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
10. Hagonoy 31 B 52 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
11. Marilao 227 B 2 33 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
12. Meycauayan City 251 B 1 22 104.00 10.95 12.10 14.80 15.70 15.70 213.50 334.50 12/22/1997
13. Norzagaray 261 B 2 5 175.00 18.15 19.40 21.10 23.20 22.55 356.50 550.50 5/25/1998
14. Obando 186 C 2 4 175.00 18.15 19.40 21.10 23.20 22.55 356.50 550.50 5/25/1998
15. Pandi 271 C 1 19 98.00 10.75 11.60 12.85 14.35 14.35 205.50 321.50 11/17/1997
16. Plaridel 277 B 9 98.00 10.75 11.60 12.85 14.35 14.35 205.50 321.50 11/17/1997
17. San Ildefonso 273 C 18 110.00 12.00 13.25 14.75 16.50 18.50 230.00 362.50 4/13/1999
18. San Jose del Monte City 123 A 2 43 150.00 17.50 18.50 19.50 20.50 20.50 325.00 510.00 4/13/1998
19. San Miguel 132 B 20 119.00 12.20 13.15 15.40 17.90 20.75 241.00 372.50 5/18/1999
20. San Rafael 528 B 23 125.00 12.65 13.09 13.24 13.24 13.24 251.50 382.40 9/24/1996
21. Santa Maria 310 A 2 23 125.00 12.65 13.09 13.24 13.24 13.24 251.50 382.40 9/24/1996
Total/Average 17 505 112.62 12.15 13.26 15.13 16.41 17.23 234.18 366.87

Cagayan - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abulug 625 D 4 125.00 12.65 13.09 13.24 13.24 13.24 251.50 382.40 9/24/1996
2. Amulung 657 D 2 125.00 12.65 13.09 13.24 13.24 13.24 251.50 382.40 9/24/1996
3. Aparri 68 D 1 7 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
4. Calayan 626 D 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
5. Claveria 203 D 4 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
6. Gattaran 239 D 1 3 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
7. Gonzaga 214 D 3 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
8. Lal-lo 302 D 1 4 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
9. Lasam 374 D 1 155.00 16.10 18.40 20.70 20.70 20.70 316.00 500.00 1/12/2000
10. Metropolitan Tuguegarao 65 A 30 6 65.00 7.20 8.10 9.15 9.15 9.15 137.00 218.00 3/3/1997
11. Penablanca 458 D 4 65.00 7.20 8.10 9.15 9.15 9.15 137.00 218.00 3/3/1997
12. Sanchez Mira 534 D 3 135.00 14.00 14.50 15.00 15.00 15.00 275.00 420.00 8/1/1997
13. Santa Ana 585 D 5 135.00 14.00 14.50 15.00 15.00 15.00 275.00 420.00 8/1/1997
14. Santa Praxedes 645 D 135.00 14.00 14.50 15.00 15.00 15.00 275.00 420.00 8/1/1997
Total/Average 3 70 7 115.00 12.47 13.60 14.80 15.17 15.17 239.75 375.75

Camarines Norte - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camarines Norte 9 B 1 7 6 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
2. Jose Panganiban 575 D 1 4 2 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
3. Paracale 167 D 4 2 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
Total/Average 6 13 8 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00

Camarines Sur - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baao 313 C 8 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
2. Balatan 445 D 146.00 17.50 19.00 20.50 22.00 22.00 321.00 511.00 3/31/1997
3. Bato 437 D 1 94.00 10.90 12.20 14.00 15.15 18.35 203.00 325.00 9/14/1999
4. Bombon 867 D 1 94.00 10.90 12.20 14.00 15.15 18.35 203.00 325.00 9/14/1999
5. Cabusao 813 D 1 94.00 10.90 12.20 14.00 15.15 18.35 203.00 325.00 9/14/1999
6. Calabanga 314 C 6 5 147.00 16.30 19.50 21.20 21.20 21.20 310.00 505.00 2/15/1998
7. Del Gallego 576 D 4 1 147.00 16.30 19.50 21.20 21.20 21.20 310.00 505.00 2/15/1998
8. Iriga City 91 C 9 3 147.00 16.30 19.50 21.20 21.20 21.20 310.00 505.00 2/15/1998
9. Libmanan 606 C 2 1 147.00 16.30 19.50 21.20 21.20 21.20 310.00 505.00 2/15/1998
10. Metro Naga 106 A 4 32 4 147.00 16.30 19.50 21.20 21.20 21.20 310.00 505.00 2/15/1998
11. Nabua 315 C 1 3 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
12. Ocampo 874 D 1 1 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
13. Pamplona 844 D 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
14. Pasacao 168 D 5 3 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
15. Pili 176 B 1 8 8 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
16. Ragay 85 D 3 4 150.00 25.75 28.35 31.80 36.00 36.00 407.50 691.00 12/21/1998
17. Sipocot 76 D 1 19 98.00 10.95 12.40 14.35 16.70 16.70 207.50 331.50 12/7/1999
Total/Average 8 80 52 128.25 16.45 18.57 20.72 22.80 22.80 292.75 478.50

Camiguin - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Mambajao 202 D 12 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
Total/Average 12 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00

Capiz - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cuartero 616 D 2 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
2. Dao 346 D 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
3. Dumalag 712 D 1 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
4. Dumarao 112 D 1 1 1 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
5. Mambusao 356 D 1 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
6. Metro Roxas 32 A 2 25.00 2.60 3.00 3.50 4.40 5.50 51.00 81.00 12/18/1995
7. Pilar 82 D 2 2 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
8. Pontevedra 372 D 2 1 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
9. Pres. Roxas 341 D 3 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
Total/Average 3 11 5 130.00 15.62 17.55 19.50 19.50 19.50 286.25 461.75

Catanduanes - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baras 455 D 8 1 1 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
2. Bato 101 D 1 3 75.00 8.15 8.55 9.65 9.65 9.65 156.50 242.00 4/18/1997
3. Pandan 380 D 1 1 75.00 8.15 8.55 9.65 9.65 9.65 156.50 242.00 4/18/1997
4. San Andres 180 D 1 1 100.00 10.50 12.45 15.10 15.10 15.10 205.00 329.50 2/23/1994
5. Viga 570 D 1 1 75.00 9.00 10.00 11.00 12.00 12.00 165.00 265.00 9/15/1998
6. Virac 181 C 4 3 75.00 9.00 10.00 11.00 12.00 12.00 165.00 265.00 9/15/1998
Total/Average 15 7 5 73.66 8.10 9.10 10.55 10.88 10.88 154.66 245.66

Cavite - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Amadeo 601 C 16 75.00 9.00 10.00 11.00 12.00 12.00 165.00 265.00 9/15/1998
2. Carmona 561 B 17 95.00 10.00 11.00 13.00 14.00 14.00 195.00 305.00 2/8/2000
3. Dasmarinas City 83 A 144 95.00 10.00 11.00 13.00 14.00 14.00 195.00 305.00 2/8/2000
4. Gen. E. Aguinaldo 555 D 4 2 71.00 7.50 8.55 10.20 12.00 12.00 146.00 231.50 3/9/1999
5. Gen. Mariano Alvarez 393 B 29 125.00 13.00 14.00 15.00 18.00 18.00 255.00 395.00 6/6/1998
6. Indang 99 C 15 3 79.00 8.70 9.70 11.00 11.00 11.00 166.00 263.00 8/10/1994
7. Maragondon 503 C 5 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
8. Mendez 424 C 10 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
9. Silang 115 A 77 2 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
10. Tagaytay City 37 B 19 2 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
11. Tanza 358 B 11 98.00 10.00 12.00 13.00 16.00 16.00 198.00 318.00 9/7/1999
12. Trece Martires City 574 B 31 81.00 9.40 10.00 12.00 14.00 14.00 175.00 275.00 4/13/1999
Total/Average 378 9 90.66 9.68 10.60 12.01 13.26 13.26 187.50 293.50

Cebu - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balamban 622 C 1 20 11 81.00 9.40 10.00 12.00 14.00 14.00 175.00 275.00 4/13/1999
2. Bogo City 577 C 5 117.00 13.10 15.00 17.35 20.30 20.30 248.00 398.00 11/24/1999
3. Carcar 117 B 31 6 85.00 8.70 9.65 11.35 11.35 11.35 172.00 268.50 5/3/1999
4. Daanbantayan 632 D 18 85.00 8.70 9.65 11.35 11.35 11.35 172.00 268.50 5/3/1999
5. Dalaguete 436 C 5 3 100.60 11.25 12.40 14.65 16.75 16.75 213.10 337.10 7/15/1997
6. Medellin 873 D 100.60 11.25 12.40 14.65 16.75 16.75 213.10 337.10 7/15/1997
7. Metro Cebu 11 A 5 140 108.51 11.97 14.07 38.61 38.61 38.61 228.21 368.91 6/15/2000
8. Moalboal 476 C 2 2 70.00 8.00 9.00 10.00 10.00 10.00 150.00 240.00 1/20/1997
9. Pinamungajan 420 C 16 5 87.00 8.85 9.70 11.50 13.75 13.75 175.50 272.50 7/7/1997
10. Tabuelan 617 D 3 87.00 8.85 9.70 11.50 13.75 13.75 175.50 272.50 7/7/1997
11. Toledo City 195 B 20 4 87.00 8.85 9.70 11.50 13.75 13.75 175.50 272.50 7/7/1997
Total/Average 6 258 34 90.65 9.70 10.83 12.71 14.36 14.36 187.65 296.02

Compostela Valley - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Compostela 863 D 3 87.00 8.85 9.70 11.50 13.75 13.75 175.50 272.50 7/7/1997
2. Nabunturan 146 D 15 144.95 15.35 18.00 22.25 27.55 27.55 298.45 478.45 11/23/1998
Total/Average 18

Davao Oriental - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baganga 154 D 3 75.00 7.80 8.50 9.50 9.50 9.50 153.00 238.00 9/16/1996
2. Lupon 428 D 3 138.10 14.65 16.30 17.95 19.60 19.60 284.60 447.60 3/24/1999
3. Mati City 35 C 31 100.00 10.75 11.67 12.90 12.90 12.90 207.50 324.20 9/22/1995
4. San Isidro 161 D 4 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
5. Tarragona 847 D 4 1 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
Total/Average 45 1 82.30 8.38 9.11 10.12 10.12 10.12 166.10 257.25

Davao del Norte - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Asuncion 685 D 3 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
2. Braulio E. Dujali 579 D 2 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
3. Carmen 319 D 4 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
4. Island Garden City of Samal 564 C 8 37 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
5. Kapalong 665 D 1 151.00 16.05 18.20 19.15 19.15 19.15 311.50 493.50 1/12/2000
6. New Corella 552 D 4 92.50 10.00 10.75 11.25 11.90 11.90 192.50 300.00 9/22/1997
7. Panabo City 200 C 13 92.50 10.00 10.75 11.25 11.90 11.90 192.50 300.00 9/22/1997
8. Tagum City 175 A 1 7 138.85 14.55 15.70 19.30 23.35 27.50 284.35 441.35 6/29/1999
Total/Average 9 67 4

Davao del Sur - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bansalan 57 C 2 4 138.85 14.55 15.70 19.30 23.35 27.50 284.35 441.35 6/29/1999
2. Davao City 5 A 112 2 80.00 8.40 10.85 14.40 21.00 21.00 164.00 272.50 5/23/2000
3. Digos City 147 B 10 80.00 8.40 10.85 14.40 21.00 21.00 164.00 272.50 5/23/2000
4. Hagonoy 548 D 2 114.00 12.50 14.50 15.00 16.00 16.00 239.00 384.00 1/13/1997
5. Kiblawan 507 D 1 114.00 12.50 14.50 15.00 16.00 16.00 239.00 384.00 1/13/1997
Total/Average 127 6 80.00 8.40 10.85 14.40 21.00 21.00 164.00 272.50

Dinagat Island - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dinagat 833 D 114.00 12.50 14.50 15.00 16.00 16.00 239.00 384.00 1/13/1997
2. San Jose (Dinagat Island) 578 D 1 4 114.00 12.50 14.50 15.00 16.00 16.00 239.00 384.00 1/13/1997
Total/Average 1 4

Eastern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Borongan 116 D 1 4 132.50 14.85 18.25 23.30 23.30 23.30 281.00 463.50 2/28/2000
2. Gen. Macarthur 568 D 1 1 132.50 14.85 18.25 23.30 23.30 23.30 281.00 463.50 2/28/2000
3. Guiuan 201 D 6 132.50 14.85 18.25 23.30 23.30 23.30 281.00 463.50 2/28/2000
4. Llorente 220 D 2 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
5. Oras 276 D 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
6. Sulat 425 D 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
7. Taft 584 D 1 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
Total/Average 1 13 5 116.25 13.57 15.70 18.65 18.65 18.65 252.00 409.00

Guimaras - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 164 C 22 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
2. Jordan 289 D 6 4 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
3. Nueva Valencia 242 D 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
Total/Average 28 6

Ifugao - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banaue 861 D 1 100.00 12.30 13.15 14.00 14.00 14.00 223.00 354.50 3/23/1994
2. Ifugao 325 D 2 45.00 1.50 1.75 2.00 2.00 2.00 60.00 77.50 2/17/1989
Total/Average 3 45.00 1.50 1.75 2.00 2.00 2.00 60.00 77.50

Ilocos Norte - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bangui 799 D 1 45.00 1.50 1.75 2.00 2.00 2.00 60.00 77.50 2/17/1989
2. Batac 250 D 14 190.00 20.00 21.50 23.50 26.00 26.00 390.00 605.00 7/13/1999
3. Dingras 208 D 10 158.40 16.50 17.15 17.80 18.45 18.45 323.40 494.90 6/1/1998
4. Ilocos Norte 210 B 45 2 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
5. Pagudpud 706 D 1 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
6. San Nicolas 207 C 6 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
7. Sarrat 350 D 2 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
Total/Average 78 4 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50

Ilocos Sur - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Candon City 571 D 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
2. Magsingal 526 D 4 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
3. Metro Vigan 53 B 1 15 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
4. Narvacan 352 D 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
5. Santa 299 D 1 1 184.00 19.55 21.10 22.75 24.50 24.50 379.50 590.50 8/3/1999
6. Sinait 573 D 6 133.00 14.00 15.00 16.25 17.60 17.60 273.00 423.00 3/7/2000
7. Sta. Lucia 349 D 1 133.00 14.00 15.00 16.25 17.60 17.60 273.00 423.00 3/7/2000
8. Tagudin 177 D 1 143.00 18.60 21.45 22.85 22.85 22.85 329.00 543.50 1/27/1996
Total/Average 2 29 2 143.00 18.60 21.45 22.85 22.85 22.85 329.00 543.50

Iloilo - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ajuy 110 D 1 80.00 11.90 12.90 13.90 13.90 13.90 199.00 328.00 8/6/1996
2. Alimodian 185 D 10 150.00 15.32 16.92 17.55 17.55 17.55 303.20 472.40 5/5/1997
3. Anilao 331 D 1 158.00 17.20 18.95 21.00 23.40 23.40 330.00 519.50 11/23/1999
4. Banate 318 D 5 158.00 17.20 18.95 21.00 23.40 23.40 330.00 519.50 11/23/1999
5. Calinog 363 D 1 6 158.00 17.20 18.95 21.00 23.40 23.40 330.00 519.50 11/23/1999
6. Concepcion 375 D 4 213.75 22.90 24.60 26.35 28.15 28.15 442.75 688.75 7/6/1999
7. Dingle-Pototan 77 D 1 2 213.75 22.90 24.60 26.35 28.15 28.15 442.75 688.75 7/6/1999
8. Duenas 345 D 14 213.75 22.90 24.60 26.35 28.15 28.15 442.75 688.75 7/6/1999
9. Dumangas-Barotac Nuevo 237 C 7 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
10. Estancia 360 D 1 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
11. Igbaras 390 D 1 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
12. Janiuay 226 D 6 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
13. Lambunao 225 D 3 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
14. Lemery 431 D 1 98.50 10.00 11.00 12.00 12.00 12.00 198.50 308.50 3/1/1996
15. Leon 466 D 1 170.00 17.70 18.65 19.95 21.60 21.60 347.00 533.50 5/30/2000
16. Metro Iloilo 71 A 7 10 170.00 17.70 18.65 19.95 21.60 21.60 347.00 533.50 5/30/2000
17. Miagao 383 D 1 2 170.00 17.70 18.65 19.95 21.60 21.60 347.00 533.50 5/30/2000
18. New Lucena 446 D 4 109.00 11.48 12.58 13.67 13.67 13.67 223.80 349.60 6/5/1995
19. San Joaquin 388 D 1 109.00 11.48 12.58 13.67 13.67 13.67 223.80 349.60 6/5/1995
20. Tubungan 595 D 1 109.00 11.48 12.58 13.67 13.67 13.67 223.80 349.60 6/5/1995
21. Zarraga 508 D 1 5 109.00 11.48 12.58 13.67 13.67 13.67 223.80 349.60 6/5/1995
Total/Average 10 89 2 106.77 11.84 12.99 14.20 14.33 14.33 225.18 355.14

Isabela - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alicia 198 D 7 210.00 23.00 25.20 28.50 32.00 32.00 440.00 692.00 3/11/2000
2. Angadanan 278 D 1 150.00 16.00 17.50 18.75 20.75 20.75 310.00 485.00 3/2/2000
3. Aurora 856 D 5 150.00 16.00 17.50 18.75 20.75 20.75 310.00 485.00 3/2/2000
4. Benito Soliven 283 D 6 150.00 16.00 17.50 18.75 20.75 20.75 310.00 485.00 3/2/2000
5. Cabagan 182 C 7 115.00 30.10 36.10 43.40 43.40 43.40 416.00 777.00 5/13/2000
6. Cauayan City 183 B 17 60.00 6.70 7.50 8.50 9.80 9.80 127.00 202.00 1/3/2000
7. City of Ilagan 90 C 26 195.00 20.40 23.25 27.05 30.70 30.70 399.00 631.50 1/25/2000
8. Cordon 287 D 3 198.00 20.50 21.50 22.75 24.25 24.25 403.00 618.00 2/19/2000
9. Gamu 615 D 9 198.00 20.50 21.50 22.75 24.25 24.25 403.00 618.00 2/19/2000
10. Luna 460 D 1 198.00 20.50 21.50 22.75 24.25 24.25 403.00 618.00 2/19/2000
11. Naguilian 781 D 9 198.00 20.50 21.50 22.75 24.25 24.25 403.00 618.00 2/19/2000
12. Ramon 294 D 4 157.00 17.70 19.80 22.10 24.70 24.70 334.00 532.00 1/27/2000
13. Reina Mercedes 572 D 2 157.00 17.70 19.80 22.10 24.70 24.70 334.00 532.00 1/27/2000
14. Roxas 199 C 7 120.00 12.40 13.70 15.20 16.80 16.80 244.00 381.00 5/25/1999
15. San Guillermo 485 D 4 120.00 12.40 13.70 15.20 16.80 16.80 244.00 381.00 5/25/1999
16. San Manuel 421 D 4 140.00 15.00 16.00 17.00 18.00 18.00 290.00 450.00 11/9/1999
17. Santiago City 92 B 19 297.00 32.00 37.00 47.00 51.00 51.00 617.00 987.00 3/23/1999
18. Tumauini 309 C 9 297.00 32.00 37.00 47.00 51.00 51.00 617.00 987.00 3/23/1999
Total/Average 140 138.96 18.38 21.26 25.37 26.62 26.62 322.76 535.36

La Union - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balaoan 59 D 4 2 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 4/13/1999
2. Metro San Fernando 16 B 35 2 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 4/13/1999
3. Naguilian 84 D 6 1 122.05 12.35 14.40 15.75 15.75 15.75 245.55 389.55 8/24/1999
4. Rosario 89 D 2 4 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
Total/Average 49 9 138.15 14.15 15.42 16.25 16.62 16.62 279.65 433.90

Laguna - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
2. Cabuyao 596 C 18 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
3. Calamba 29 A 82 1 154.25 15.95 16.45 16.75 17.50 17.50 313.75 478.25 6/18/1999
4. Laguna 38 A 16 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
5. Mabitac 668 D 1 90.00 9.30 10.00 12.00 13.00 15.00 183.00 283.00 6/23/1997
6. Pagsanjan 122 C 8 3 138.80 15.00 16.40 18.35 18.35 18.35 288.80 452.80 2/22/2000
7. Pakil 518 D 1 1 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
8. San Pablo City 4 A 31 6 74.00 8.05 8.80 9.65 10.60 10.60 154.50 242.50 9/14/1999
9. San Pedro 170 B 54 98.00 10.00 10.00 10.00 10.00 10.00 198.00 298.00 5/16/1997
10. Siniloan 395 C 9 2 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
11. Sta. Cruz 127 B 19 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
Total/Average 251 14 102.90 10.76 11.33 12.66 13.00 13.66 210.56 323.90

Lanao del Norte - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod 543 C 3 92.75 10.00 11.00 12.30 14.15 14.15 192.75 302.75 3/20/2000
2. Kapatagan 418 C 2 1 85.80 10.05 11.45 12.85 12.85 12.85 186.30 300.80 10/21/1995
3. Kauswagan 540 D 10 2 85.80 10.05 11.45 12.85 12.85 12.85 186.30 300.80 10/21/1995
4. Kolambugan 539 D 2 2 107.00 14.65 15.15 15.85 15.85 15.85 253.50 405.00 2/16/1999
5. Linamon 517 D 3 77.00 8.47 8.86 9.24 9.24 9.24 161.70 250.30 12/7/1998
6. Tubod-Baroy 228 D 10 103.35 11.80 13.30 14.75 14.75 14.75 221.35 354.35 9/16/1996
Total/Average 27 8 93.28 11.24 12.19 13.17 13.17 13.17 205.71 327.61

Lanao del Sur - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Marawi City 3 D 3 90.00 10.35 12.75 15.65 16.20 16.20 193.50 321.00 7/28/1998
2. Wao 519 C 6 75.00 8.00 8.50 9.00 9.00 9.00 155.00 240.00 12/13/1998
Total/Average 3 6 75.00 8.00 8.50 9.00 9.00 9.00 155.00 240.00

Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abuyog 121 D 3 146.16 14.45 18.06 20.96 20.96 20.96 290.66 471.26 2/13/1995
2. Babatngon 438 D 1 1 146.16 14.45 18.06 20.96 20.96 20.96 290.66 471.26 2/13/1995
3. Baybay City 39 C 2 2 9 78.00 8.90 9.80 10.45 11.85 11.85 167.00 265.00 8/24/1998
4. Isabel 521 D 7 2 78.00 8.90 9.80 10.45 11.85 11.85 167.00 265.00 8/24/1998
5. Jaro 157 D 1 2 95.00 12.00 14.00 16.00 17.50 17.50 215.00 355.00 7/4/1997
6. Leyte Metro 19 B 3 1 95.00 12.00 14.00 16.00 17.50 17.50 215.00 355.00 7/4/1997
7. Merida 520 D 2 95.00 12.00 14.00 16.00 17.50 17.50 215.00 355.00 7/4/1997
8. Metro Carigara 246 B 2 1 181.45 19.05 20.95 24.00 28.80 28.80 371.95 581.45 4/11/2000
9. Metro Hilongos 189 C 5 2 214.00 25.30 26.45 27.60 28.75 28.75 467.00 731.50 3/30/1998
Total/Average 8 24 15 145.00 16.85 18.33 20.11 22.11 22.11 313.50 496.83

Maguindanao - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Cotabato 30 A 1 8 1 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
Total/Average 1 9 1

Masbate - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aroroy 137 D 1 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
2. Masbate-Mobo 69 C 7 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
Total/Average 8

Misamis Occidental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Ozamis 10 B 4 1 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
2. Oroquieta City 694 C 1 5 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
3. Tangub City 158 C 16 4 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
Total/Average 1 25 5

Misamis Oriental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balingasag 501 D 3 1 127.90 14.15 16.35 18.55 20.85 20.85 269.40 432.90 6/1/1998
2. Cagayan de Oro City 1 A 25 1 90.00 12.50 13.00 13.50 14.00 14.00 215.00 345.00 10/26/1998
3. Claveria 212 D 8 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
4. Gingoog City 25 C 23 6 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
5. Tagoloan 634 D 3 1 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
6. Talisayan 864 D 2 1 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
Total/Average 56 18 81.40 10.50 11.37 12.25 13.12 13.12 186.40 300.15

Negros Occidental - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod City 2 A 1 65 2 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
2. Bago City 317 C 11 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
3. Binalbagan 103 C 5 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
4. Cadiz City 386 C 1 1 72.80 8.50 9.75 11.00 12.25 12.25 157.80 255.30 2/10/1997
5. Escalante 165 D 2 2 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
6. Himamaylan 102 C 7 1 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
7. Kabankalan City 50 C 2 3 1 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
8. La Carlota City 49 C 17 2 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
9. La Castellana 281 D 3 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
10. Manapla 234 D 2 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
11. Murcia 611 C 6 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
12. Pulupandan 631 D 1 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
13. Sagay 129 C 16 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
14. Silay City 27 C 10 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
15. Sipalay 252 D 1 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
16. Talisay City 533 C 9 190.00 21.95 25.15 27.90 33.00 33.00 409.50 661.00 12/8/1997
17. Victorias 70 C 12 190.00 21.95 25.15 27.90 33.00 33.00 409.50 661.00 12/8/1997
Total/Average 3 168 18 113.57 12.59 14.42 16.66 18.61 19.01 239.47 383.72

Negros Oriental - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ayungon 569 D 9 4 190.00 21.95 25.15 27.90 33.00 33.00 409.50 661.00 12/8/1997
2. Bais City 530 C 2 11 3 171.00 18.55 20.65 23.80 27.70 27.70 356.50 563.00 11/13/1995
3. Bayawan 221 C 1 14 152.00 24.30 28.55 31.65 36.70 36.70 395.00 680.50 11/24/1997
4. Dumaguete City 47 B 20 92.00 9.40 11.10 12.80 16.15 16.15 186.00 297.00 2/23/1998
5. Sibulan 253 C 9 7 165.00 20.25 22.75 26.25 30.50 30.50 367.50 595.00 7/22/1998
6. Tanjay 163 C 1 1 2 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
Total/Average 12 46 26 96.33 12.03 14.03 16.10 18.90 18.90 216.66 357.00

North Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aleosan 755 D 3 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
2. Kabacan 194 C 8 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
3. Metro Kidapawan 41 A 1 4 9 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
4. Metro Midsayap 174 C 1 20 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
5. Mlang 209 C 7 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
6. Pigcawayan 477 D 7 176.65 18.85 20.05 21.25 22.45 22.45 365.15 565.65 4/27/1999
7. Pikit 495 D 5 176.65 18.85 20.05 21.25 22.45 22.45 365.15 565.65 4/27/1999
8. Tulunan 590 D 1 176.65 18.85 20.05 21.25 22.45 22.45 365.15 565.65 4/27/1999
Total/Average 2 60 10 84.75 9.60 10.75 11.90 13.05 13.05 180.75 288.25

Northern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Catarman 359 D 4 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
2. Gamay 619 D 1 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
3. Laoang 381 D 7 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
4. San Isidro 557 D 1 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
5. San Jose 583 D 1 3 1 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
6. Victoria 556 D 1 158.00 18.50 21.25 25.50 30.25 30.25 343.00 555.50 1/19/2000
Total/Average 1 16 2

Nueva Ecija - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongabon 410 C 1 18 110.00 11.50 12.25 13.25 14.50 15.90 225.00 347.50 1/12/2000
2. Cabanatuan City 15 A 47 110.00 11.50 12.50 14.00 16.00 19.00 225.00 350.00 6/15/2000
3. Cabiao 414 B 6 160.00 16.15 16.30 16.65 16.65 16.65 321.50 484.50 4/4/2000
4. Cuyapo 224 D 7 90.00 9.60 10.50 11.25 12.00 12.00 186.00 291.00 10/12/1998
5. Gapan City 21 C 10 176.00 18.65 20.00 21.75 24.15 27.60 362.50 562.50 3/13/2000
6. Gen. M. Natividad 353 D 3 176.00 18.65 20.00 21.75 24.15 27.60 362.50 562.50 3/13/2000
7. Gen. Tinio 191 C 1 7 170.00 17.50 18.50 20.00 22.00 24.50 345.00 530.00 8/30/1999
8. Guimba 295 B 10 170.00 17.50 18.50 20.00 22.00 24.50 345.00 530.00 8/30/1999
9. Jaen 290 C 12 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
10. Licab 603 C 4 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
11. Lupao 316 D 5 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
12. Munoz City 328 C 7 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
13. Palayan City 343 C 6 15 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
14. Penaranda 306 C 7 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
15. San Antonio 131 C 7 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
16. San Jose City 36 C 4 1 155.00 16.25 17.10 18.05 19.25 19.25 317.50 488.50 8/3/1999
17. Sta. Rosa 217 B 1 15 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
18. Talavera 293 B 16 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
19. Talugtug 494 D 10 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
Total/Average 9 211 1 133.20 13.71 14.53 15.56 16.28 16.85 270.30 415.60

Nueva Vizcaya - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Diadi 613 D 1 2 1 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
2. Kasibu 759 D 1 126.00 12.60 13.80 15.50 15.15 15.50 252.00 390.00 12/11/1995
Total/Average 1 2 2

Occidental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Sablayan 197 C 13 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
2. San Jose 62 C 20 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
Total/Average 35

Oriental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Naujan 245 D 3 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
2. Pinamalayan 327 D 1 3 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
3. Pola 96 D 1 150.00 15.00 16.00 18.00 21.00 21.00 300.00 460.00 5/18/1999
4. Roxas 334 D 1 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
Total/Average 1 9 65.80 6.87 7.65 8.55 8.65 8.65 134.55 211.05

Palawan - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aborlan 440 D 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
2. Culion 599 D 1 4 63.00 6.40 6.70 7.00 7.20 7.20 127.00 194.00 1/1/2000
3. Puerto Princesa City 26 A 9 36 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
4. Roxas 449 D 1 1 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
5. Taytay 604 D 1 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00 7/6/1999
Total/Average 10 40 4 150.00 16.00 17.00 19.00 22.00 22.00 310.00 480.00

Pampanga - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angeles City 322 A 40 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
2. Bacolor 160 D 7 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
3. Candaba 593 C 7 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
4. City of San Fernando 40 A 46 122.00 13.15 13.90 14.65 14.65 14.65 253.50 392.50 1/28/2000
5. Floridablanca 256 B 22 85.00 8.60 8.70 8.90 9.20 9.60 171.00 258.00 3/23/1999
6. Guagua 46 B 16 80.00 9.00 9.00 12.50 12.50 12.50 170.00 260.00 9/14/1994
7. Lubao 232 B 19 104.00 11.10 11.90 13.00 13.00 13.00 215.00 334.00 5/23/2000
8. Mabalacat City 61 A 45 104.00 11.10 11.90 13.00 13.00 13.00 215.00 334.00 5/23/2000
9. Macabebe 171 C 8 107.50 10.80 12.00 13.45 13.45 13.45 215.50 335.50 10/26/1998
10. Masantol 320 C 6 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
11. Porac 402 C 11 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
12. Sasmuan 484 D 7 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
13. Sta Rita 618 D 2 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
Total/Average 236 106.87 11.06 11.68 12.40 12.47 12.57 217.50 334.37

Pangasinan - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos City 34 B 10 1 125.00 13.00 13.50 14.00 14.00 14.00 255.00 390.00 8/26/1996
2. Alcala 166 C 17 172.00 18.70 20.70 23.20 26.70 26.70 359.00 566.00 6/18/1999
3. Asingan 524 C 5 172.00 18.70 20.70 23.20 26.70 26.70 359.00 566.00 6/18/1999
4. Balungao 560 D 1 172.00 18.70 20.70 23.20 26.70 26.70 359.00 566.00 6/18/1999
5. Bani 74 D 1 172.00 18.70 20.70 23.20 26.70 26.70 359.00 566.00 6/18/1999
6. Basista 544 D 3 172.00 18.70 20.70 23.20 26.70 26.70 359.00 566.00 6/18/1999
7. Bayambang 119 C 1 16 168.00 18.20 19.95 22.05 24.85 24.85 350.00 549.50 2/8/2000
8. Binalonan 285 C 9 168.00 18.20 19.95 22.05 24.85 24.85 350.00 549.50 2/8/2000
9. Binmaley 97 B 13 120.00 13.25 15.15 17.70 20.85 20.85 252.50 404.00 1/12/2000
10. Bugallon 567 D 3 87.00 9.00 10.45 14.80 14.80 14.80 177.00 281.50 11/6/1990
11. Calasiao 700 D 87.00 9.00 10.45 14.80 14.80 14.80 177.00 281.50 11/6/1990
12. Dagupan City 297 B 25 99.00 10.89 11.88 15.84 15.84 15.84 207.90 326.70 5/18/1999
13. Dasol 674 D 2 99.00 10.89 11.88 15.84 15.84 15.84 207.90 326.70 5/18/1999
14. Lingayen 52 C 12 115.00 12.50 14.00 16.00 18.50 18.50 240.00 380.00 4/13/1999
15. Manaoag 128 C 5 1 125.00 13.75 16.25 18.95 18.95 18.95 262.50 425.00 12/27/1995
16. Mangaldan 139 B 16 72.00 7.80 9.30 10.70 10.70 10.70 150.00 243.00 11/27/1995
17. Mapandan 612 C 5 72.00 7.80 9.30 10.70 10.70 10.70 150.00 243.00 11/27/1995
18. Metro Tayug 113 C 5 98.00 10.78 11.76 12.74 12.74 12.74 205.80 323.40 10/26/1998
19. Pozorrubio 133 C 7 125.00 13.00 14.00 15.50 18.00 18.00 255.00 395.00 2/23/1999
20. Rosales 270 C 9 144.00 15.20 16.00 16.80 16.80 16.80 296.00 456.00 9/28/1998
21. San Carlos City 44 C 18 144.00 15.20 16.00 16.80 16.80 16.80 296.00 456.00 9/28/1998
22. San Manuel 562 D 3 132.00 14.00 14.90 15.90 17.00 17.00 272.00 421.00 5/18/1999
23. San Nicolas 255 D 8 135.00 14.00 15.00 16.50 18.50 18.50 275.00 425.00 9/21/1998
24. San Quintin 553 D 2 1 135.00 14.00 15.00 16.50 18.50 18.50 275.00 425.00 9/21/1998
25. Santa Maria 554 C 5 135.00 14.00 15.00 16.50 18.50 18.50 275.00 425.00 9/21/1998
26. Santo Tomas 636 D 1 135.00 14.00 15.00 16.50 18.50 18.50 275.00 425.00 9/21/1998
27. Umingan 148 D 10 135.00 14.00 15.00 16.50 18.50 18.50 275.00 425.00 9/21/1998
28. Urbiztondo 304 D 2 110.00 11.50 12.00 12.50 12.70 12.70 225.00 345.00 4/27/1998
29. Urdaneta City 24 B 9 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
30. Villasis 95 C 9 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
Total/Average 1 233 3 114.91 12.40 13.67 15.78 16.74 16.74 238.95 375.65

Quezon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Atimonan 260 D 1 4 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
2. Burdeos 581 D 1 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
3. Calauag 78 C 1 8 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
4. Candelaria 114 C 9 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
5. Catanauan 531 D 1 134.20 14.80 15.45 16.20 17.10 17.10 282.20 436.70 1/19/2000
6. Dolores 462 D 1 3 3 80.00 8.80 10.00 11.00 11.00 11.00 168.00 268.00 12/11/1995
7. Guinayangan 303 D 1 3 9 150.00 16.25 17.85 19.60 21.50 21.50 312.50 491.00 7/6/1999
8. Gumaca 79 D 9 180.00 19.00 20.55 22.55 22.65 22.65 370.00 575.50 6/29/1999
9. Infanta - Gen. Nakar 229 C 6 95.00 10.00 11.00 13.00 13.00 13.00 195.00 305.00 3/2/1998
10. Lopez 45 D 3 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
11. Macalelon 580 D 3 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
12. Mauban 298 D 5 4 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
13. Polilio 600 D 2 128.00 13.00 14.00 15.00 17.00 17.00 258.00 398.00 3/9/1999
14. Quezon Metro 17 A 36 16 90.00 9.80 10.00 11.00 11.00 11.00 188.00 288.00 7/27/1999
15. San Francisco 842 D 2 90.00 9.80 10.00 11.00 11.00 11.00 188.00 288.00 7/27/1999
16. Tagkawayan 130 C 1 3 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
17. Tiaong 151 C 7 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
Total/Average 6 97 51 105.16 11.26 12.09 13.42 13.60 13.60 217.83 338.75

Quirino - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aglipay 354 D 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
2. Diffun 279 D 4 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
3. Maddela 337 D 1 1 106.00 11.00 11.00 12.00 13.00 13.00 216.00 326.00 3/7/2000
Total/Average 1 6

Rizal - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
2. Pililla 487 C 17 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
3. Tanay 88 B 15 2 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
4. Teresa 536 C 11 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
Total/Average 55 2

Romblon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 115.00 12.00 13.00 15.00 16.00 16.00 235.00 365.00 3/23/1999
2. Romblon 64 D 7 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55 2/2/1994
Total/Average 8 1 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55

Sarangani - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Glan 439 D 5 66.55 7.40 7.80 9.35 9.35 9.35 140.55 218.55 2/2/1994
2. Maasim 444 D 2 2 80.00 8.50 9.00 9.50 10.00 10.00 165.00 255.00 3/10/1997
3. Malungon 592 D 2 80.00 8.50 9.00 9.50 10.00 10.00 165.00 255.00 3/10/1997
Total/Average 7 4

Siquijor - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Siquijor 142 D 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00 3/13/1995
Total/Average 7 2 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00

Sorsogon - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barcelona 681 D 1 99.00 14.70 16.30 18.40 18.40 18.40 246.00 409.00 3/13/1995
2. Bulan 22 C 1 3 1 100.00 11.60 12.25 13.25 13.25 13.25 216.00 338.50 5/7/1996
3. Casiguran 366 C 1 88.00 9.80 10.80 12.00 12.00 12.00 186.00 294.00 6/8/1994
4. Donsol 72 D 4 88.00 9.80 10.80 12.00 12.00 12.00 186.00 294.00 6/8/1994
5. Gubat 136 C 18 5 120.00 15.80 17.50 19.50 22.00 22.00 278.00 453.00 12/8/1997
6. Irosin 586 D 1 120.00 15.80 17.50 19.50 22.00 22.00 278.00 453.00 12/8/1997
7. Matnog 263 D 5 120.00 15.80 17.50 19.50 22.00 22.00 278.00 453.00 12/8/1997
8. Pilar 474 D 5 112.00 11.80 12.65 13.80 15.15 15.15 230.00 356.50 12/8/1997
9. Sorsogon City 20 B 12 5 108.00 11.75 13.00 14.60 16.50 18.75 225.50 355.50 10/5/1999
Total/Average 1 47 14 96.50 10.23 11.06 12.22 13.03 13.60 198.87 309.50

South Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banga 230 D 2 108.00 11.75 13.00 14.60 16.50 18.75 225.50 355.50 10/5/1999
2. City of Koronadal 156 B 23 119.30 14.60 17.30 20.05 22.85 22.85 265.30 438.30 2/8/2000
3. Gen. Santos City 370 A 33 119.30 14.60 17.30 20.05 22.85 22.85 265.30 438.30 2/8/2000
4. Norala 213 D 2 162.00 17.30 19.45 21.60 23.75 23.75 335.00 529.50 5/16/2000
5. Polomolok 153 B 17 1 108.75 13.05 16.70 17.80 19.30 19.30 239.25 406.25 11/14/1994
6. Sto. Nino 648 D 1 108.75 13.05 16.70 17.80 19.30 19.30 239.25 406.25 11/14/1994
7. Surallah 500 C 12 1 156.00 16.80 18.95 21.15 23.40 23.40 324.00 513.50 6/26/2000
8. Tupi 280 D 6 2 154.00 16.35 17.30 18.30 19.30 19.30 317.50 490.50 11/9/1999
Total/Average 96 4 117.31 12.96 14.98 16.15 17.45 17.45 246.98 396.81

Southern Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Maasin City 291 C 7 2 154.00 16.35 17.30 18.30 19.30 19.30 317.50 490.50 11/9/1999
2. Sogod 188 C 3 4 154.00 16.35 17.30 18.30 19.30 19.30 317.50 490.50 11/9/1999
Total/Average 10 6

Sultan Kudarat - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kalamansig 376 D 1 176.00 20.00 22.50 25.10 17.90 27.90 376.00 601.00 2/8/2000
2. Lebak 499 D 2 1 176.00 20.00 22.50 25.10 17.90 27.90 376.00 601.00 2/8/2000
3. Sultan Kudarat 247 B 17 152.40 16.80 18.80 20.85 22.95 22.95 320.40 508.40 2/15/2000
Total/Average 19 2

Sulu - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Jolo Mainland 254 C 2 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50 5/20/1992
Total/Average 1 2

Surigao del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacuag 515 D 2 1 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50 5/20/1992
2. Del Carmen 588 D 2 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50 5/20/1992
3. Metro Siargao 56 D 2 1 78.40 8.40 9.30 9.60 9.60 9.60 162.40 255.40 4/1/1994
4. Placer 355 C 3 99.20 10.35 11.35 12.90 13.40 13.40 202.70 316.20 2/23/1999
5. Socorro 628 D 99.20 10.35 11.35 12.90 13.40 13.40 202.70 316.20 2/23/1999
6. Surigao Metro 324 B 14 3 80.00 12.00 14.00 16.00 18.00 18.00 200.00 340.00 1/12/2000
Total/Average 14 8 7 82.32 8.70 10.25 10.62 10.62 10.62 169.32 271.82

Surigao del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barobo 193 D 2 80.00 12.00 14.00 16.00 18.00 18.00 200.00 340.00 1/12/2000
2. Bislig City 23 B 1 3 7 80.00 12.00 14.00 16.00 18.00 18.00 200.00 340.00 1/12/2000
3. Cantilan 441 D 1 2 1 94.00 9.85 10.40 11.00 11.00 11.00 192.50 296.50 12/2/1996
4. Carmen 646 D 1 94.00 9.85 10.40 11.00 11.00 11.00 192.50 296.50 12/2/1996
5. Hinatuan 143 D 2 7 149.00 20.00 23.00 26.00 29.00 29.00 349.00 579.00 3/25/2000
6. Lianga 104 D 1 1 1 117.00 13.20 15.20 17.90 21.00 21.00 249.00 401.00 2/23/1999
7. Madrid 504 D 1 75.00 12.00 12.50 13.00 13.50 13.50 195.00 320.00 4/6/1998
8. Tagbina 419 D 5 130.00 15.60 16.90 18.20 19.50 19.50 286.00 455.00 10/26/1998
9. Tandag City 105 C 6 1 130.00 15.60 16.90 18.20 19.50 19.50 286.00 455.00 10/26/1998
Total/Average 6 28 10 96.60 12.11 13.46 14.92 16.02 16.02 217.70 352.30

Tarlac - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camiling 43 C 16 130.00 15.60 16.90 18.20 19.50 19.50 286.00 455.00 10/26/1998
2. Concepcion 134 B 21 130.00 15.60 16.90 18.20 19.50 19.50 286.00 455.00 10/26/1998
3. Gerona 222 C 10 130.00 15.60 16.90 18.20 19.50 19.50 286.00 455.00 10/26/1998
4. Mayantoc 335 D 1 7 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50 7/17/1995
5. Moncada 60 C 11 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50 7/17/1995
6. Paniqui 58 C 10 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50 7/17/1995
7. Ramos 482 C 4 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50 7/17/1995
8. Sta. Ignacia 413 D 5 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50 7/17/1995
9. Tarlac City 14 B 29 105.00 11.35 12.55 14.00 15.80 15.80 218.50 344.00 5/25/1998
Total/Average 1 113 150.00 15.75 18.00 20.25 20.25 20.25 307.50 487.50

Tawi-Tawi - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongao 301 D 6 123.00 14.50 16.00 17.00 18.00 18.00 268.00 428.00 8/24/1999
Total/Average 6 116.45 13.95 15.25 16.35 16.35 16.35 255.95 408.45

Western Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Basey 215 D 1 1 179.00 18.90 20.40 22.40 24.90 24.90 368.00 572.00 2/28/1998
2. Calbayog City 284 B 1 2 140.70 15.60 18.55 21.50 21.50 21.50 296.70 482.20 9/9/1997
3. Calbiga 491 D 1 1 125.00 13.05 13.70 14.45 14.45 14.45 255.50 392.50 4/15/1996
4. Catbalogan City 107 C 1 6 3 140.00 15.55 17.10 19.85 22.85 22.85 295.50 466.50 4/13/1999
Total/Average 4 10 3 139.00 14.78 15.96 18.40 19.65 19.86 286.83 446.50

Zambales - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabangan 505 D 4 145.00 15.00 15.45 15.90 15.90 15.90 295.00 449.50 12/14/1999
2. Candelaria 541 D 3 145.00 15.00 15.45 15.90 15.90 15.90 295.00 449.50 12/14/1999
3. Castillejos 551 C 12 145.00 15.00 15.45 15.90 15.90 15.90 295.00 449.50 12/14/1999
4. Iba 238 D 3 120.00 13.00 14.25 15.75 17.50 17.50 250.00 392.50 3/31/1997
5. Masinloc 430 D 1 1 70.00 7.30 7.75 8.30 8.30 8.30 143.00 220.50 3/25/1996
6. Palauig 529 D 1 98.00 10.50 11.00 11.50 11.50 11.50 203.00 313.00 10/12/1998
7. San Antonio 152 D 6 1 95.00 10.00 10.50 11.00 11.50 11.50 195.00 300.00 1/19/1998
8. San Felipe 472 D 8 130.00 13.80 14.55 15.45 16.45 17.55 268.00 413.50 2/15/2000
9. San Marcelino 427 C 6 130.00 13.80 14.55 15.45 16.45 17.55 268.00 413.50 2/15/2000
10. San Narciso 307 D 7 130.00 13.80 14.55 15.45 16.45 17.55 268.00 413.50 2/15/2000
11. Sta. Cruz 365 D 6 108.00 11.40 12.00 12.60 12.60 12.60 222.00 342.00 1/23/1995
12. Subic 126 C 3 25 102.00 11.50 13.00 15.00 15.00 15.00 217.00 347.00 4/20/1999
Total/Average 4 83 1 98.20 10.44 11.10 11.83 12.28 12.28 202.60 313.60

Zamboanga Sibugay - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ipil-Titay 492 D 11 1 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00 1/19/1999
Total/Average 11 1 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00

Zamboanga del Norte - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dapitan City 184 C 5 2 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00 1/19/1999
2. Dipolog City 179 B 15 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00 1/19/1999
3. Labason 205 D 3 120.00 12.70 13.50 14.50 15.75 15.75 247.00 382.00 1/19/1999
4. Liloy 187 D 1 4 85.00 8.60 9.60 10.60 10.60 10.60 171.00 267.00 4/27/1994
5. Polanco 532 C 7 120.00 20.00 22.00 23.00 24.00 24.00 320.00 540.00 7/28/1998
6. Pres. M.A. Roxas 506 D 2 120.00 20.00 22.00 23.00 24.00 24.00 320.00 540.00 7/28/1998
7. Rizal 514 D 2 84.00 9.60 10.80 12.00 12.00 12.00 180.00 288.00 8/28/1995
8. Sindangan 479 D 1 110.00 10.75 11.25 12.25 12.25 12.25 217.50 330.00 12/18/1995
9. Siocon 98 D 1 85.00 10.75 11.75 12.75 12.75 12.75 192.50 310.00 3/13/2000
Total/Average 5 30 9 93.50 12.23 13.53 14.58 14.83 14.83 215.87 351.25

Zamboanga del Sur - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kumalarang 241 D 2 85.00 10.75 11.75 12.75 12.75 12.75 192.50 310.00 3/13/2000
2. Pagadian City 51 B 11 9 105.00 11.85 12.75 13.75 15.00 16.50 223.50 351.00 7/7/1997
3. Tukuran 465 D 1 1 105.00 11.85 12.75 13.75 15.00 16.50 223.50 351.00 7/7/1997
4. Zamboanga City 6 A 23 7 90.00 11.00 12.00 13.00 14.00 15.00 200.00 320.00 2/28/2000
Total/Average 35 20 105.00 11.85 12.75 13.75 15.00 16.50 223.50 351.00

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.