Water Districts Rates Data
Regional Averages
As of 12/31/2022

Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
01 49 3 389 18 8,097,742 314,457 1,301,852 18.44 230.11 24.58 26.49 28.98 31.85 31.96 475.96 740.95
02 37 5 218 9 3,787,874 140,562 581,927 20.20 235.00 25.53 27.52 30.00 32.35 32.35 490.37 765.60
03 85 31 1,343 8 32,464,006 1,274,665 5,277,113 19.47 196.70 21.42 23.27 25.52 28.13 30.74 410.95 643.67
04 74 17 1,638 83 29,493,985 1,035,349 4,286,345 20.65 210.02 22.83 25.08 27.98 31.25 31.58 438.34 689.15
05 43 31 201 101 9,527,657 319,740 1,323,724 20.01 203.85 23.82 26.34 29.60 33.23 33.78 442.06 705.49
06 66 18 338 39 10,894,604 369,938 1,531,543 19.54 205.60 23.50 26.18 29.60 32.79 33.06 440.63 702.51
07 20 19 320 67 12,570,107 379,589 1,571,498 21.74 166.16 19.14 21.93 26.71 30.47 30.62 357.58 576.97
08 30 14 74 34 3,651,266 153,936 637,295 17.69 203.26 22.22 24.49 27.42 30.56 30.63 425.52 670.49
09 14 5 76 30 6,587,334 142,264 588,973 21.61 203.76 25.47 27.91 31.20 33.63 34.48 458.55 737.73
10 26 11 167 78 10,573,528 279,680 1,157,875 21.84 179.64 21.21 24.58 28.37 32.05 33.51 391.81 637.62
11 20 9 257 11 14,014,420 367,003 1,519,392 25.65 201.63 21.87 24.37 27.72 31.69 32.02 420.40 664.19
12 23 3 191 21 7,735,597 266,036 1,101,389 21.91 214.12 23.74 26.68 29.81 33.40 33.56 451.58 718.38
ARMM 7 5 13 20 1,196,102 35,693 147,769 21.64 142.28 15.37 17.25 20.02 22.32 22.32 296.00 468.57
CAR 12 1 100 8 1,829,526 79,386 328,658 18.00 242.50 26.42 29.31 32.66 36.17 36.17 506.79 799.91
CARAGA 26 32 69 38 4,403,470 174,750 723,465 16.45 199.60 24.07 27.36 31.46 35.93 37.51 440.35 714.04
Total/Average 532 204 5,394 565 156,827,219 5,333,048 22,078,819 20.43 205.94 22.98 25.37 28.42 31.60 32.35 435.80 689.58

Water Districts Rates Data
Provincial Averages
As of 12/31/2022

Province Region Operational WD Count Surface Wells Springs Production m3/month Service Connections Population Served Ave. Cons. m3/month Min. Charge
10 m3
11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Abra CAR 8 5 1 256,363 12,644 52,346 16.01 224.75 24.05 26.14 28.78 32.13 32.13 465.25 726.68
Agusan Del Norte CARAGA 4 1 19 1 2,063,930 68,561 283,843 15.60 209.07 31.33 34.66 40.10 46.41 51.41 522.45 869.07
Agusan Del Sur CARAGA 5 10 14 16 609,478 24,934 103,227 18.10 196.96 22.14 24.35 27.04 30.07 31.84 418.36 661.86
Aklan 06 7 2 28 1,413,065 45,340 187,708 18.94 195.22 21.26 23.69 26.85 29.74 29.85 407.87 644.80
Albay 05 6 1 46 22 2,112,607 73,703 305,130 20.58 192.66 21.27 24.02 27.60 31.63 31.63 405.41 645.66
Antique 06 9 14 8 476,289 18,109 74,971 17.79 164.77 19.60 22.34 25.49 27.39 27.39 360.83 584.27
Aurora 03 2 1 1 12,213 738 3,055 13.79 139.50 14.75 16.02 17.02 18.15 18.15 287.00 447.25
Basilan ARMM 3 5 3 12 638,637 19,949 82,589 22.90 151.00 16.03 17.86 20.23 23.10 23.10 311.33 490.00
Bataan 03 9 194 5 3,065,555 104,538 432,787 22.72 146.22 16.01 17.50 19.45 21.54 22.77 306.33 481.38
Batangas 04 17 765 2 6,741,321 230,631 954,812 21.85 211.44 23.01 25.16 27.86 30.94 31.12 441.58 693.20
Benguet CAR 2 1 92 7 1,533,753 65,177 269,833 18.44 317.00 37.22 44.52 52.05 57.35 57.35 689.25 1,134.50
Biliran 08 2 1 3 184,203 6,978 28,889 21.20 184.50 24.15 29.25 34.37 37.10 38.05 426.00 718.50
Bohol 07 2 1 9 5 146,397 4,598 19,036 18.08 153.50 17.20 19.12 21.80 24.70 24.70 325.50 516.75
Bukidnon 10 10 10 59 35 2,738,381 92,109 381,331 18.64 166.45 19.90 24.04 28.74 33.65 35.40 365.45 605.85
Bulacan 03 21 17 505 13,381,991 536,063 2,219,301 18.06 201.79 22.62 24.92 27.92 31.41 34.97 428.05 677.29
Cagayan 02 14 3 70 7 1,893,631 59,587 246,690 23.90 238.21 25.26 26.53 28.16 30.00 30.00 490.85 756.25
Camarines Norte 05 3 6 13 8 1,141,763 42,845 177,378 17.71 238.66 26.96 29.95 35.36 41.20 41.20 508.33 807.83
Camarines Sur 05 17 8 80 52 4,140,596 134,712 557,708 20.82 212.99 26.47 29.32 32.83 37.18 38.02 477.73 770.99
Camiguin 10 1 12 95,015 3,214 13,306 25.05 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00
Capiz 06 9 3 11 5 1,239,402 56,150 232,461 18.30 180.88 21.86 24.49 27.58 30.41 30.95 399.50 644.44
Catanduanes 05 6 15 7 5 517,413 14,814 61,330 24.76 159.83 17.65 19.13 21.10 23.05 23.05 336.33 527.66
Cavite 04 12 378 9 8,722,107 305,431 1,264,484 19.65 205.55 22.75 25.19 28.09 31.43 32.12 433.09 685.05
Cebu 07 11 6 258 34 10,134,002 293,959 1,216,990 22.74 158.78 17.78 20.29 25.68 29.10 29.37 336.60 539.57
Compostela Valley 11 2 18 168,295 5,991 24,803 18.14 218.42 23.25 26.50 31.30 37.22 37.22 450.92 715.92
Davao (Del Norte) 11 8 9 67 4 1,723,943 67,051 277,591 19.88 211.48 23.36 25.98 29.48 33.29 34.13 445.11 704.92
Davao Del Sur 11 5 127 6 11,757,539 278,177 1,151,653 27.60 196.08 21.56 24.61 28.34 33.59 33.59 411.68 657.78
Davao Oriental 11 5 45 1 364,643 15,784 65,346 18.66 184.69 19.27 20.73 22.87 25.01 25.01 377.39 584.73
Dinagat Islands CARAGA 2 1 4 56,754 2,741 11,348 14.31 226.50 24.00 25.87 28.27 31.20 31.20 466.50 725.25
Eastern Samar 08 7 1 13 5 332,218 8,719 36,097 13.43 227.83 25.01 27.51 30.82 34.66 34.66 477.97 753.12
Guimaras 08 3 28 6 212,705 7,685 31,816 20.01 199.45 21.68 26.75 34.81 39.63 39.63 416.28 683.78
Ifugao CAR 2 3 39,410 1,565 6,479 15.84 239.00 25.15 26.77 28.77 31.15 31.15 490.50 758.25
Ilocos Norte 01 7 78 4 925,453 40,696 168,481 18.51 217.57 23.42 25.31 27.62 30.43 31.17 451.85 705.00
Ilocos Sur 01 8 2 29 2 615,202 25,663 106,245 19.30 230.18 25.33 27.39 29.96 33.00 33.00 483.50 757.43
Iloilo 06 21 10 89 2 2,443,514 58,815 243,494 22.21 245.13 27.05 29.42 32.65 35.93 36.39 515.65 809.91
Isabela 02 18 140 1,839,688 77,540 321,016 17.64 230.27 25.53 27.98 31.09 33.69 33.69 485.58 765.41
La Union 01 4 49 9 566,392 15,905 65,847 16.49 254.25 26.45 28.73 31.83 34.46 34.46 518.75 806.12
Laguna 04 11 251 14 7,636,766 265,272 1,098,226 20.92 180.54 19.41 21.36 23.86 26.47 27.41 374.72 588.36
Lanao Del Norte 10 6 27 8 647,334 23,691 98,081 19.81 179.66 20.81 22.97 25.60 26.93 26.93 387.83 617.58
Lanao Del Sur ARMM 2 3 6 396,421 9,853 40,791 21.33 167.50 18.42 20.50 23.55 26.80 26.80 351.75 556.75
Leyte 08 9 8 24 15 2,051,786 79,784 330,306 21.76 190.55 20.56 22.60 25.17 27.90 27.90 396.21 622.27
Maguindanao ARMM 1 1 9 1 1,452,391 40,410 167,297 26.25 184.00 20.35 23.50 26.70 29.95 29.95 387.50 622.50
Masbate 05 2 8 210,234 5,953 24,645 21.31 307.50 35.22 37.12 39.55 42.45 42.45 659.75 1,031.00
Misamis Occidental 10 3 1 25 5 786,839 35,869 148,498 17.49 210.33 24.50 28.66 32.96 37.30 43.30 455.33 742.00
Misamis Oriental 10 6 56 18 6,305,959 124,797 516,660 25.77 207.05 24.74 28.04 31.66 35.60 35.60 454.46 734.88
Negros Occidental 06 17 3 168 18 5,109,629 183,839 761,093 19.36 196.83 23.29 26.04 29.27 33.08 33.23 429.77 690.24
Negros Oriental 07 6 12 46 26 2,208,555 77,533 320,987 18.35 184.94 21.60 25.07 29.60 34.90 34.90 401.02 651.77
North Cotabato 12 8 2 60 10 1,538,268 68,204 282,365 17.59 223.31 25.23 28.40 31.85 35.54 35.99 475.68 759.68
Northern Samar 08 6 1 16 2 98,917 4,068 16,842 15.63 203.33 21.58 23.06 24.82 27.01 27.01 419.16 649.83
Nueva Ecija 03 19 9 211 1 4,861,300 188,154 778,958 19.91 226.78 24.01 25.62 27.62 30.02 32.66 466.92 723.18
Nueva Vizcaya 02 2 1 2 2 15,863 951 3,937 14.47 202.50 22.00 24.27 27.12 30.50 30.50 422.50 665.25
Occidental Mindoro 04 2 35 311,303 13,110 54,275 17.73 249.00 26.77 28.92 30.90 32.97 32.97 516.75 806.00
Oriental Mindoro 04 4 1 9 160,028 6,854 28,376 14.07 214.50 22.96 25.07 27.82 30.20 30.20 444.12 694.87
Palawan 04 5 10 40 4 1,502,406 58,007 240,149 20.83 254.40 27.47 30.42 34.32 39.23 39.23 529.10 833.30
Pampanga 03 13 236 7,536,112 287,338 1,189,579 21.47 182.30 19.86 21.84 24.10 26.64 29.23 380.92 599.34
Pangasinan 01 30 1 233 3 5,990,695 232,193 961,279 18.46 229.79 24.40 26.23 28.66 31.53 31.53 473.88 736.26
Quezon 04 17 6 97 51 2,769,470 103,642 429,078 20.63 216.03 23.57 25.69 28.67 31.94 31.94 451.80 708.71
Quirino 02 3 1 6 38,693 2,484 10,284 13.96 270.00 29.21 31.51 34.00 36.53 36.53 562.16 877.33
Rizal 04 4 55 2 1,514,582 46,681 193,259 21.51 220.00 23.47 25.93 29.47 33.73 34.55 454.75 714.12
Romblon 04 2 8 1 136,003 5,721 23,685 19.22 157.00 17.10 20.07 23.60 28.57 28.57 328.00 528.75
Sarangani 12 3 7 4 143,301 5,484 22,704 19.17 169.93 18.20 20.01 21.96 24.88 24.88 351.93 552.10
Siquijor 07 1 7 2 81,153 3,499 14,486 18.18 160.00 23.20 26.80 30.50 30.50 30.50 392.00 660.00
Sorsogon 05 9 1 47 14 1,405,045 47,713 197,532 17.32 188.77 21.03 23.46 26.40 28.93 29.94 399.16 633.77
South Cotabato 12 8 96 4 3,962,220 126,961 525,619 22.87 214.69 23.80 27.05 30.37 34.21 34.21 452.75 723.25
Southern Leyte 08 2 10 6 252,973 10,829 44,832 17.76 170.00 19.92 22.55 27.15 32.57 32.57 369.25 594.75
Sultan Kudarat 12 3 19 2 639,417 24,977 103,405 22.42 242.35 26.28 28.83 31.80 35.21 35.21 505.18 793.51
Sulu ARMM 1 1 2 103,040 3,828 15,848 16.51 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50
Surigao Del Norte CARAGA 6 14 8 7 786,107 38,400 158,976 16.46 180.80 22.07 26.93 32.22 37.67 39.73 401.55 670.88
Surigao Del Sur CARAGA 9 6 28 10 887,201 40,114 166,072 17.04 203.41 23.27 26.42 30.30 34.42 34.42 436.13 700.41
Tarlac 03 9 1 113 2,584,501 119,896 496,369 17.65 218.66 23.56 25.78 28.35 31.48 35.03 454.27 712.16
Tawi Tawi ARMM 1 6 58,004 2,063 8,541 20.40 123.00 14.50 16.00 17.00 18.00 18.00 268.00 428.00
Western Samar 08 4 4 10 3 731,169 43,558 180,330 10.40 214.75 22.23 24.21 27.10 30.45 30.45 437.12 679.25
Zambales 03 12 4 83 1 1,022,335 37,938 157,063 18.71 186.66 20.49 21.84 23.40 25.14 26.79 391.58 610.04
Zamboanga Del Norte 09 9 5 30 9 1,040,142 45,459 188,200 16.45 208.11 26.27 28.78 31.89 34.03 34.27 470.83 758.66
Zamboanga Del Sur 09 4 35 20 5,478,031 93,469 386,962 24.25 176.18 21.56 23.70 26.95 29.16 31.58 391.81 628.81
Zamboanga Sibugay 09 1 11 1 69,162 3,336 13,811 18.04 275.00 34.00 37.00 42.00 48.00 48.00 615.00 985.00
Total/Average 532 204 5,394 565 156,827,219 5,333,048 22,078,819 20.43 205.94 22.98 25.37 28.42 31.60 32.35 435.80 689.58

Abra - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bucay 642 D 1 5/31/2016 19,679 754 3,770 19.32 260.00 27.70 30.30 33.80 38.15 38.15 537.00 840.00 9/3/2019
2. Dolores 456 D 1 12/31/2015 12,328 699 3,495 11.84 267.00 28.00 30.00 32.10 34.45 34.45 547.00 847.00 10/5/2004
3. Lagangilang 442 D 1 12/31/2014 14,500 792 3,960 15.04 150.00 15.60 16.80 18.60 21.00 21.00 306.00 474.00 12/9/2020
4. Metro Bangued 28 B 1 12/31/2022 205,426 9,751 48,755 16.78 210.00 25.25 29.70 35.20 41.30 41.30 462.50 759.50 7/13/2010
5. Pilar 662 D 6/30/2016 4,430 648 3,240 6.18 228.00 23.80 25.05 26.55 28.30 28.30 466.00 716.50 5/22/2018
6. Sal-Lapadan 688 D 228.00 23.80 25.05 26.55 28.30 28.30 466.00 716.50 5/22/2018
7. San Isidro 692 D 180.00 19.00 20.25 21.75 23.50 23.50 370.00 572.50 5/22/2018
8. San Juan 453 D 1 275.00 29.25 32.00 35.75 42.10 42.10 567.50 887.50 5/22/2019
Total/Average 5 1 256,363 12,644 52,346 16.01 224.75 24.05 26.14 28.78 32.13 32.13 465.25 726.68

Agusan del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 406 C 5 12/31/2022 165,870 6,929 34,645 16.86 210.00 24.50 28.20 32.40 37.20 37.20 455.00 737.00 5/20/2008
2. Butuan City 7 A 1 7 12/31/2022 1,701,312 55,689 278,445 15.20 208.65 38.35 41.75 49.00 57.55 67.55 592.15 1,009.65 8/10/2010
3. Las Nieves 871 D 1 208.65 38.35 41.75 49.00 57.55 67.55 592.15 1,009.65 8/10/2010
4. Nasipit 211 C 6 1 12/31/2022 196,748 5,943 29,715 17.86 209.00 24.15 26.95 30.00 33.35 33.35 450.50 720.00 12/14/2004
Total/Average 1 19 1 2,063,930 68,561 283,843 15.60 209.07 31.33 34.66 40.10 46.41 51.41 522.45 869.07

Agusan del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bayugan 243 C 9 5 12/31/2022 266,743 11,075 55,375 17.11 204.80 22.40 24.95 28.15 32.00 36.45 428.80 678.30 11/20/2001
2. Bunawan 549 D 4 2 12/31/2022 36,217 1,468 7,340 17.64 193.00 20.00 21.00 22.50 24.30 24.30 393.00 603.00 12/14/2004
3. Prosperidad 66 D 1 7/31/2022 59,053 2,519 12,595 19.13 171.00 18.25 21.75 25.90 30.40 30.40 353.50 571.00 12/10/2002
4. San Francisco 399 C 10 8 12/31/2022 235,801 9,212 46,060 19.29 236.00 27.30 30.80 34.65 38.65 43.05 509.00 817.00 1/19/2017
5. Sibagat 682 D 1 12/31/2014 11,664 660 3,300 15.23 180.00 22.75 23.25 24.00 25.00 25.00 407.50 640.00 5/21/2012
Total/Average 10 14 16 609,478 24,934 103,227 18.10 196.96 22.14 24.35 27.04 30.07 31.84 418.36 661.86

Aklan - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ibajay 434 D 5 12/31/2022 23,725 894 4,470 11.15 139.60 14.95 16.75 18.15 18.15 18.15 289.10 456.60 11/17/1997
2. Libacao 364 D 1 12/31/2014 28,708 671 3,355 26.11 190.00 19.50 20.00 20.70 21.45 22.25 385.00 585.00 2/7/2006
3. Madalag 669 D 4 12/31/2022 5,980 296 1,480 17.57 250.00 27.00 29.00 31.00 33.00 33.00 520.00 810.00 10/20/2015
4. Malay (Caticlan) 559 D 1 12/31/2022 174,929 2,326 11,630 40.76 208.00 23.10 25.75 28.90 32.60 32.60 439.00 696.50 6/3/2003
5. Malinao 258 D 1 12/31/2015 31,365 835 4,175 15.99 154.00 15.40 18.50 24.65 24.65 24.65 308.00 493.00 10/23/2001
6. Metro Kalibo 73 B 1 14 12/31/2022 1,040,652 34,194 170,970 19.30 205.00 21.35 22.50 23.95 25.50 25.50 418.50 643.50 11/12/2002
7. Numancia 259 D 2 12/31/2022 107,706 6,124 30,620 9.47 220.00 27.55 33.35 40.65 52.85 52.85 495.50 829.00 1/10/2006
Total/Average 2 28 1,413,065 45,340 187,708 18.94 195.22 21.26 23.69 26.85 29.74 29.85 407.87 644.80

Albay - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacacay 135 D 2 1 6/30/2022 88,368 3,836 19,180 18.71 190.00 20.80 23.30 26.70 31.30 31.30 398.00 631.00 12/18/2007
2. Camalig 125 C 2 4 12/31/2022 113,411 4,381 21,905 19.29 240.00 25.05 26.35 28.15 30.25 30.25 490.50 754.00 8/28/2007
3. Daraga 172 C 12 5 12/31/2015 221,396 9,584 47,920 16.38 200.00 22.10 24.65 27.70 31.20 31.20 421.00 667.50 6/25/2012
4. Legazpi City 173 B 1 14 3 12/31/2022 990,059 27,406 137,030 23.74 238.00 26.20 29.35 30.10 33.85 33.85 500.00 793.50 7/2/2013
5. Ligao City 149 C 9 5 6/30/2022 329,835 11,655 58,275 22.07 100.00 11.75 14.50 18.00 22.25 22.25 217.50 362.50 5/22/2019
6. Tabaco 13 B 7 4 12/31/2022 369,538 16,841 84,205 17.54 188.00 21.75 26.00 34.95 40.95 40.95 405.50 665.50 11/24/2009
Total/Average 1 46 22 2,112,607 73,703 305,130 20.58 192.66 21.27 24.02 27.60 31.63 31.63 405.41 645.66

Antique - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barbaza 497 D 2 12/31/2015 6,812 512 2,560 13.30 122.00 14.00 15.25 16.50 16.50 16.50 262.00 414.50 8/18/2001
2. Belison 602 D 1 12/31/2022 21,872 1,161 5,805 13.68 245.00 27.00 29.00 31.00 33.00 33.00 515.00 805.00 7/18/2006
3. Bugasong 348 D 3 1 12/31/2022 58,580 1,753 8,765 18.25 217.00 22.85 23.80 25.20 27.60 27.60 445.50 683.50 3/8/2005
4. Culasi 274 D 1 1 12/31/2022 45,057 2,166 10,830 20.80 86.00 9.30 11.20 13.70 13.70 13.70 179.00 291.00 8/19/1996
5. Hamtic 267 D 1 12/31/2014 3,489 321 1,605 9.94 111.00 15.00 16.00 17.00 17.00 17.00 261.00 421.00 2/6/1995
6. Pandan 523 C 3 12/31/2022 165,578 6,381 31,905 14.26 200.00 21.90 23.00 23.95 24.95 24.95 419.00 649.00 3/16/2010
7. Patnongon 296 D 2 6/30/2022 31,163 1,520 7,600 18.05 212.00 24.45 27.70 33.55 39.40 39.40 456.50 733.50 9/5/2006
8. Sibalom 249 D 5 6/30/2022 132,157 3,699 18,495 24.38 142.00 18.35 22.75 27.35 32.10 32.10 325.50 553.00 11/20/2001
9. Tobias Fornier 257 D 1 1 12/31/2022 11,581 596 2,980 17.73 148.00 23.60 32.40 41.20 42.30 42.30 384.00 708.00 9/12/2006
Total/Average 14 8 476,289 18,109 74,971 17.79 164.77 19.60 22.34 25.49 27.39 27.39 360.83 584.27

Aurora - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baler 233 D 1 12/31/2011 7,192 320 1,600 18.73 79.00 8.00 8.80 8.80 8.80 8.80 159.00 247.00 5/1/1995
2. Dipaculao 408 D 1 12/31/2012 5,021 418 2,090 10.01 200.00 21.50 23.25 25.25 27.50 27.50 415.00 647.50 3/16/2004
Total/Average 1 1 12,213 738 3,055 13.79 139.50 14.75 16.02 17.02 18.15 18.15 287.00 447.25

Basilan - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Isabela City 330 C 4 3 5 6/30/2022 370,242 10,635 53,175 25.57 160.00 17.60 19.50 21.50 24.00 24.00 336.00 531.00 4/29/2015
2. Lamitan City 269 C 3 12/31/2021 183,270 5,776 28,880 19.91 150.00 16.00 18.50 22.50 27.50 27.50 310.00 495.00 5/26/2010
3. Maluso 512 D 1 4 12/31/2022 85,125 3,538 17,690 19.78 143.00 14.50 15.60 16.70 17.80 17.80 288.00 444.00 2/10/2004
Total/Average 5 3 12 638,637 19,949 82,589 22.90 151.00 16.03 17.86 20.23 23.10 23.10 311.33 490.00

Bataan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bagac 272 D 14 12/31/2022 108,506 3,516 17,580 18.86 158.00 18.20 20.80 25.10 28.80 28.80 340.00 548.00 12/1/1997
2. Balanga City 124 B 47 1 12/31/2022 448,510 16,456 82,280 22.01 150.00 16.50 18.25 20.25 22.50 25.00 315.00 497.50 10/1/2012
3. Dinalupihan 409 B 21 1 12/31/2022 575,045 19,389 96,945 22.36 145.00 15.20 16.30 17.40 18.85 20.30 297.00 460.00 9/25/2000
4. Hermosa 286 C 11 12/31/2022 210,562 8,658 43,290 20.52 165.00 18.25 19.25 20.50 22.00 23.75 347.50 540.00 12/11/2000
5. Limay 379 B 27 12/31/2022 452,541 11,863 59,315 25.08 95.00 11.20 12.40 13.60 14.80 16.00 207.00 331.00 7/12/2005
6. Mariveles 48 B 31 12/31/2022 638,982 20,231 101,155 27.26 98.00 9.40 11.05 13.25 15.70 15.70 192.00 302.50 4/18/2007
7. Morong 264 D 3 11/30/2018 48,827 1,887 9,435 25.05 170.00 17.60 18.60 20.30 22.35 24.40 346.00 532.00 7/23/2015
8. Orani 54 B 14 3 12/31/2022 395,060 15,075 75,375 19.25 185.00 21.85 23.85 26.20 28.65 28.65 403.50 642.00 5/7/2015
9. Orion 527 C 26 12/31/2022 187,522 7,463 37,315 19.98 150.00 15.90 17.05 18.50 20.25 22.40 309.00 479.50 8/25/2010
Total/Average 194 5 3,065,555 104,538 432,787 22.72 146.22 16.01 17.50 19.45 21.54 22.77 306.33 481.38

Batangas - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Agoncillo 347 C 14 12/31/2022 104,007 5,234 26,170 15.24 162.00 19.50 21.25 23.25 25.50 25.50 357.00 569.50 1/5/2005
2. Alitagtag 373 C 10 12/31/2022 143,323 4,291 21,455 19.36 270.00 28.00 29.50 31.75 34.00 34.00 550.00 845.00 12/15/2010
3. Balayan 109 C 10 10/31/2018 101,250 4,952 24,760 17.04 202.00 23.20 26.45 29.95 33.95 33.95 434.00 698.50 12/18/2007
4. Batangas City 8 A 30 12/31/2022 1,398,963 44,557 222,785 22.05 205.00 22.50 24.70 27.00 29.50 29.50 430.00 677.00 4/22/2008
5. Lemery 169 C 18 12/31/2022 329,161 13,641 68,205 18.62 193.00 20.55 22.50 24.35 26.35 26.35 398.50 623.50 9/25/2017
6. Lian 609 D 5 12/31/2022 48,645 2,854 14,270 17.49 200.00 22.00 25.00 29.00 34.00 34.00 420.00 670.00 11/10/2009
7. Lobo 422 C 13 1 6/30/2020 110,093 4,497 22,485 18.76 270.00 28.30 30.00 32.00 34.75 34.75 553.00 853.00 7/9/2015
8. Mabini 93 C 27 6/30/2016 141,787 5,332 26,660 20.90 270.40 30.40 34.25 38.45 43.10 43.10 574.40 916.90 3/24/2009
9. Metro Lipa 12 A 493 11/30/2022 2,651,652 90,122 450,610 23.58 172.50 18.90 21.40 24.65 28.80 28.80 361.50 575.50 9/25/2014
10. Nasugbu 155 C 7 6/30/2016 236,305 6,345 31,725 30.26 215.00 24.20 26.35 30.10 31.80 31.80 457.00 720.50 12/5/2017
11. Rosario 111 C 9 12/31/2022 203,391 7,797 38,985 18.09 160.00 17.00 18.50 20.50 23.00 26.00 330.00 515.00 8/6/2003
12. San Juan 55 C 14 12/31/2022 290,809 8,444 42,220 19.32 210.00 22.50 25.00 28.50 33.00 33.00 435.00 685.00 2/22/2005
13. San Luis 677 D 1 12/31/2018 22,337 962 4,810 20.18 198.00 20.80 22.30 24.30 26.80 26.80 406.00 629.00 9/8/2011
14. Taal 516 C 12 1 12/31/2022 285,543 8,255 41,275 19.03 220.00 23.40 25.20 27.20 29.40 29.40 454.00 706.00 3/23/2010
15. Tanauan 333 B 87 6/30/2016 408,143 16,223 81,115 21.34 239.80 25.85 28.90 33.50 40.30 40.30 498.30 787.30 3/13/2012
16. Taysan 470 C 6 6/30/2016 90,618 2,953 14,765 21.55 206.80 22.70 24.00 25.50 26.60 26.60 433.80 673.80 2/1/2011
17. Tuy 377 C 6 12/31/2022 175,294 4,172 20,860 24.76 200.00 21.45 22.45 23.75 25.20 25.20 414.50 639.00 4/25/2018
Total/Average 765 2 6,741,321 230,631 954,812 21.85 211.44 23.01 25.16 27.86 30.94 31.12 441.58 693.20

Benguet - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baguio City 18 A 1 69 4 12/31/2022 1,145,922 46,726 233,630 19.70 370.00 40.50 46.20 52.35 59.05 59.05 775.00 1,237.00 2/1/2013
2. La Trinidad 100 B 23 3 12/31/2022 387,831 18,451 92,255 15.25 264.00 33.95 42.85 51.75 55.65 55.65 603.50 1,032.00 10/20/2020
Total/Average 1 92 7 1,533,753 65,177 269,833 18.44 317.00 37.22 44.52 52.05 57.35 57.35 689.25 1,134.50

Biliran - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Culaba 872 D 264.00 33.95 42.85 51.75 55.65 55.65 603.50 1,032.00 10/20/2020
2. Naval 118 C 1 3 12/31/2022 184,203 6,978 34,890 21.20 105.00 14.35 15.65 17.00 18.55 20.45 248.50 405.00 2/10/2021
Total/Average 1 3 184,203 6,978 28,889 21.20 184.50 24.15 29.25 34.37 37.10 38.05 426.00 718.50

Bohol - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Clarin 398 D 5 12/31/2022 64,808 1,367 6,835 18.13 132.00 14.00 14.85 16.00 17.25 17.25 272.00 420.50 2/15/2000
2. Talibon 80 D 1 9 12/31/2022 81,589 3,231 16,155 18.05 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
Total/Average 1 9 5 146,397 4,598 19,036 18.08 153.50 17.20 19.12 21.80 24.70 24.70 325.50 516.75

Bukidnon - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabanglasan 620 D 2 12/31/2022 11,662 1,063 5,315 18.75 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
2. Damulog 639 D 1 3/31/2013 663 642 3,210 0.86 175.00 20.40 23.40 27.60 32.15 32.15 379.00 613.00 11/23/1998
3. Don Carlos 248 D 1 9 4 12/31/2022 80,607 4,276 21,380 12.65 231.00 33.60 44.35 55.40 66.65 66.65 567.00 1,010.50 6/7/2004
4. Kibawe 400 D 4 5/31/2016 52,441 1,721 8,605 18.59 136.50 14.30 16.60 18.85 20.15 20.15 279.50 445.50 12/13/2010
5. Lantapan 870 D 2 12/31/2022 137,800 5,795 28,975 13.87 136.50 14.30 16.60 18.85 20.15 20.15 279.50 445.50 12/13/2010
6. Malaybalay City 33 B 5 12 1 12/31/2022 670,754 22,188 110,940 21.43 120.00 13.50 15.25 17.10 19.05 21.10 255.00 407.50 8/5/2007
7. Manolo Fortich 401 C 1 10 15 12/31/2022 355,003 13,025 65,125 21.76 157.50 22.80 30.35 38.30 46.50 55.00 385.50 689.00 7/5/2014
8. Maramag 496 C 7 4 12/31/2022 362,779 9,811 49,055 18.59 138.00 15.20 20.25 26.25 33.65 33.65 290.00 492.50 9/11/1999
9. Quezon 627 D 3 2 12/31/2022 248,751 9,551 47,755 18.41 176.00 19.50 21.50 23.75 26.50 26.50 371.00 586.00 2/10/2021
10. Valencia City 141 B 13 8 6/30/2021 817,922 24,037 120,185 17.16 219.00 25.00 28.70 33.75 39.55 46.50 469.00 756.00 1/21/2015
Total/Average 10 59 35 2,738,381 92,109 381,331 18.64 166.45 19.90 24.04 28.74 33.65 35.40 365.45 605.85

Bulacan - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angat 292 B 1 16 12/31/2022 285,966 11,899 59,495 19.39 200.00 21.90 24.10 26.60 29.45 32.60 419.00 660.00 11/19/2019
2. Balagtas 362 D 6 12/31/2011 98,940 2,592 12,960 21.62 160.00 16.15 16.55 17.10 17.75 18.55 321.50 487.00 3/12/2001
3. Baliwag 407 A 32 12/31/2022 752,532 34,624 173,120 18.23 200.00 22.90 26.00 29.20 33.05 37.35 429.00 689.00 1/19/2017
4. Bocaue 86 C 2 25 12/31/2022 503,349 16,262 81,310 18.51 250.00 27.00 29.50 32.50 36.00 40.00 520.00 815.00 5/23/2018
5. Bulacan 378 B 2 23 2/28/2021 351,922 13,352 66,760 17.73 250.00 26.20 27.95 30.15 32.70 32.70 512.00 791.50 11/11/2022
6. Bustos 369 B 8 12/31/2022 386,606 14,048 70,240 21.54 132.00 13.40 14.75 17.45 20.00 20.00 266.00 413.50 9/29/2020
7. Calumpit 140 B 22 12/31/2022 687,187 25,300 126,500 20.44 174.00 18.75 21.00 23.75 27.50 31.50 361.50 571.50 6/26/2012
8. City of Malolos 288 A 76 12/31/2022 1,415,485 55,248 276,240 17.54 125.00 13.50 14.75 16.25 18.00 20.00 260.00 407.50 1/2/2006
9. Guiguinto 385 C 25 160.00 17.00 18.25 19.75 21.50 23.50 330.00 512.50 8/22/2001
10. Hagonoy 31 B 52 12/31/2022 736,549 32,320 161,600 18.28 125.00 14.00 15.50 17.00 17.00 17.00 265.00 420.00 12/6/2011
11. Marilao 227 B 2 33 6/30/2021 852,063 31,511 157,555 18.57 225.00 32.30 37.95 43.90 50.10 56.55 548.00 927.50 8/25/2010
12. Meycauayan City 251 B 1 22 12/31/2022 716,821 23,341 116,705 16.28 317.60 46.20 48.50 54.35 61.70 70.45 779.60 1,264.60 5/21/2002
13. Norzagaray 261 B 2 5 12/31/2022 423,029 22,152 110,760 15.34 245.00 25.30 27.10 29.50 32.45 35.75 498.00 769.00 2/3/2009
14. Obando 186 C 2 4 12/31/2015 177,999 8,413 42,065 12.99 367.00 40.95 49.15 61.65 78.40 99.25 776.50 1,268.00 4/26/2005
15. Pandi 271 C 1 19 12/31/2022 175,228 9,547 47,735 13.98 195.00 19.50 21.75 24.25 27.00 30.00 390.00 607.50 5/17/2005
16. Plaridel 277 B 9 12/31/2022 655,897 23,023 115,115 22.04 124.00 13.20 14.75 16.45 18.30 20.30 256.00 403.50 2/9/2022
17. San Ildefonso 273 C 18 12/31/2022 370,685 15,900 79,500 18.58 180.00 19.00 20.25 21.75 23.50 25.50 370.00 572.50 4/15/2008
18. San Jose del Monte City 123 A 2 43 12/31/2022 2,978,084 120,973 604,865 16.33 280.00 30.95 34.00 37.25 40.55 40.55 589.50 929.50 5/20/2008
19. San Miguel 132 B 20 12/31/2022 438,192 15,636 78,180 22.30 143.00 15.50 16.75 18.25 20.00 22.00 298.00 465.50 3/21/2006
20. San Rafael 528 B 23 12/31/2022 348,910 18,105 90,525 15.79 190.00 20.71 22.35 24.25 26.43 28.89 397.10 620.60 2/10/2004
21. Santa Maria 310 A 2 23 12/31/2022 1,026,548 41,817 209,085 21.25 195.00 20.75 22.50 25.00 28.30 31.95 402.50 627.50 11/7/2007
Total/Average 17 505 13,381,991 536,063 2,219,301 18.06 201.79 22.62 24.92 27.92 31.41 34.97 428.05 677.29

Cagayan - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abulug 625 D 4 180.00 18.75 19.50 20.25 21.00 21.00 367.50 562.50 7/30/2012
2. Amulung 657 D 2 12/31/2022 20,805 1,261 6,305 16.37 230.00 24.00 25.25 26.75 28.50 28.50 470.00 722.50 12/1/2011
3. Aparri 68 D 1 7 3/31/2019 45,173 1,524 7,620 14.20 328.00 33.50 34.15 34.75 35.40 35.40 663.00 1,004.50 7/23/2015
4. Calayan 626 D 328.00 33.50 34.15 34.75 35.40 35.40 663.00 1,004.50 7/23/2015
5. Claveria 203 D 4 12/31/2022 35,013 2,213 11,065 14.34 190.00 21.25 23.60 26.25 29.00 29.00 402.50 638.50 2/10/2021
6. Gattaran 239 D 1 3 4/30/2019 10,268 304 1,520 14.56 194.00 20.00 20.70 21.50 22.50 22.50 394.00 601.00 2/19/2002
7. Gonzaga 214 D 3 12/31/2022 68,271 2,105 10,525 16.90 271.00 28.30 29.35 30.75 32.40 32.40 554.00 847.50 12/14/2004
8. Lal-lo 302 D 1 4 8/31/2022 69,118 3,605 18,025 16.20 224.00 23.75 25.10 27.05 29.70 29.70 461.50 712.50 3/1/2005
9. Lasam 374 D 1 12/31/2015 4,042 20,210 240.00 24.75 25.65 26.70 27.90 27.90 487.50 744.00 3/5/2011
10. Metropolitan Tuguegarao 65 A 30 6 12/31/2022 1,495,917 41,538 207,690 27.28 150.00 16.90 18.15 20.55 21.65 21.65 319.00 500.50 10/25/2019
11. Penablanca 458 D 4 12/31/2022 82,449 3,352 16,760 18.61 170.00 19.20 22.15 25.50 29.55 29.55 362.00 583.50 6/27/2001
12. Sanchez Mira 534 D 3 12/31/2022 36,421 2,528 12,640 12.92 230.00 25.90 26.80 27.80 29.00 29.00 489.00 757.00 12/9/2020
13. Santa Ana 585 D 5 6/30/2021 30,195 1,157 5,785 20.83 300.00 31.95 33.50 35.85 39.00 39.00 619.50 954.50 11/21/2007
14. Santa Praxedes 645 D 300.00 31.95 33.50 35.85 39.00 39.00 619.50 954.50 11/21/2007
Total/Average 3 70 7 1,893,631 59,587 246,690 23.90 238.21 25.26 26.53 28.16 30.00 30.00 490.85 756.25

Camarines Norte - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camarines Norte 9 B 1 7 6 12/31/2022 982,558 35,256 176,280 17.91 202.00 24.25 26.35 28.45 30.55 30.55 444.50 708.00 6/26/2014
2. Jose Panganiban 575 D 1 4 2 12/31/2022 94,546 4,471 22,355 16.97 260.00 27.75 30.00 33.25 37.35 37.35 537.50 837.50 1/28/2016
3. Paracale 167 D 4 2 12/31/2022 64,659 3,118 15,590 16.47 254.00 28.90 33.50 44.40 55.70 55.70 543.00 878.00 11/13/2007
Total/Average 6 13 8 1,141,763 42,845 177,378 17.71 238.66 26.96 29.95 35.36 41.20 41.20 508.33 807.83

Camarines Sur - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baao 313 C 8 7/31/2022 255,873 8,125 40,625 19.58 237.00 24.60 25.90 28.05 31.25 31.25 483.00 742.00 7/16/2013
2. Balatan 445 D 12/31/2009 9,240 544 2,720 12.57 172.00 22.40 24.70 27.35 30.45 30.45 396.00 643.00 10/21/2008
3. Bato 437 D 1 12/31/2021 65,487 2,499 12,495 23.14 170.00 19.70 22.05 25.10 29.40 29.40 367.00 587.50 3/12/2008
4. Bombon 867 D 1 12/31/2021 25,582 950 4,750 16.86 198.00 26.00 30.00 34.00 38.00 42.00 458.00 758.00 10/20/2015
5. Cabusao 813 D 1 250.00 31.00 37.25 43.75 50.50 57.50 560.00 932.50 11/6/2017
6. Calabanga 314 C 6 5 12/31/2022 262,433 10,631 53,155 15.28 236.00 24.60 26.10 28.10 30.60 30.60 482.00 743.00 12/18/2007
7. Del Gallego 576 D 4 1 12/31/2022 39,413 2,019 10,095 15.62 280.00 30.00 33.50 37.00 44.00 46.00 580.00 915.00 12/5/2017
8. Iriga City 91 C 9 3 12/31/2022 471,556 15,914 79,570 18.92 214.95 23.45 25.45 28.20 31.50 31.50 449.45 703.95 7/8/2008
9. Libmanan 606 C 2 1 12/31/2022 255,878 9,070 45,350 21.02 120.00 14.00 14.80 15.60 16.40 16.40 260.00 408.00 7/22/2008
10. Metro Naga 106 A 4 32 4 12/31/2022 1,982,187 57,488 287,440 23.23 125.00 14.40 15.50 16.60 17.70 18.95 269.00 424.00 6/7/2005
11. Nabua 315 C 1 3 12/31/2015 95,039 4,466 22,330 16.53 219.00 37.70 41.50 46.55 52.65 52.65 596.00 1,011.00 10/4/2012
12. Ocampo 874 D 1 1 219.00 37.70 41.50 46.55 52.65 52.65 596.00 1,011.00 10/4/2012
13. Pamplona 844 D 219.00 37.70 41.50 46.55 52.65 52.65 596.00 1,011.00 10/4/2012
14. Pasacao 168 D 5 3 9/30/2022 84,987 2,539 12,695 16.36 291.00 33.35 37.35 42.45 48.95 48.95 624.50 998.00 9/4/2007
15. Pili 176 B 1 8 8 12/31/2022 465,773 14,140 70,700 23.38 245.00 26.85 29.20 32.65 37.20 37.20 513.50 805.50 7/3/2007
16. Ragay 85 D 3 4 12/31/2022 55,055 2,810 14,050 13.73 250.00 27.15 30.20 34.20 38.50 38.50 521.50 823.50 10/12/2010
17. Sipocot 76 D 1 19 9/30/2022 72,093 3,517 17,585 16.74 175.00 19.45 22.05 25.50 29.80 29.80 369.50 590.00 4/1/2009
Total/Average 8 80 52 4,140,596 134,712 557,708 20.82 212.99 26.47 29.32 32.83 37.18 38.02 477.73 770.99

Camiguin - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Mambajao 202 D 12 12/31/2015 95,015 3,214 16,070 25.05 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
Total/Average 12 95,015 3,214 13,306 25.05 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00

Capiz - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cuartero 616 D 2 12/31/2015 3,420 188 940 18.19 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
2. Dao 346 D 11/30/2020 224,000 10,882 54,410 16.60 55.00 5.80 6.60 7.75 9.70 12.15 113.00 179.00 2/26/2003
3. Dumalag 712 D 1 12/31/2022 36,336 1,835 9,175 18.67 195.00 21.50 23.50 28.50 30.00 30.00 410.00 645.00 9/11/2014
4. Dumarao 112 D 1 1 1 12/31/2015 20,408 913 4,565 20.94 168.00 16.90 20.20 23.60 27.15 27.15 337.00 539.00 3/20/2018
5. Mambusao 356 D 1 12/31/2010 8,293 664 3,320 11.00 258.00 38.15 40.75 44.25 48.00 48.00 639.50 1,047.00 2/7/2006
6. Metro Roxas 32 A 2 7/31/2019 830,922 36,920 184,600 18.76 252.00 30.45 35.70 41.15 47.15 47.15 556.50 913.50 6/25/2015
7. Pilar 82 D 2 2 12/31/2022 23,923 1,373 6,865 13.84 130.00 17.25 19.50 21.00 21.00 21.00 302.50 497.50 4/11/2000
8. Pontevedra 372 D 2 1 6/30/2022 85,473 3,147 15,735 21.02 287.00 35.85 41.40 46.95 52.50 52.50 645.50 1,059.50 1/14/2003
9. Pres. Roxas 341 D 3 12/31/2012 6,627 228 1,140 23.42 228.00 25.05 26.20 27.35 28.50 28.50 478.50 740.50 4/21/2009
Total/Average 3 11 5 1,239,402 56,150 232,461 18.30 180.88 21.86 24.49 27.58 30.41 30.95 399.50 644.44

Catanduanes - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baras 455 D 8 1 1 12/31/2013 57,080 526 2,630 23.61 228.00 25.05 26.20 27.35 28.50 28.50 478.50 740.50 4/21/2009
2. Bato 101 D 1 3 12/31/2022 51,862 2,374 11,870 18.41 135.00 14.65 15.40 17.40 19.65 19.65 281.50 435.50 9/7/2010
3. Pandan 380 D 1 1 6/30/2022 22,072 1,012 5,060 15.57 162.00 17.80 18.25 19.10 19.10 19.10 340.00 522.50 1/23/2008
4. San Andres 180 D 1 1 12/31/2015 16,070 774 3,870 13.25 170.00 17.80 21.15 25.60 30.65 30.65 348.00 559.50 12/18/2007
5. Viga 570 D 1 1 12/31/2022 15,080 806 4,030 17.23 150.00 18.00 19.95 22.00 24.00 24.00 330.00 529.50 12/13/2010
6. Virac 181 C 4 3 12/31/2022 355,249 9,322 46,610 29.04 114.00 12.60 13.85 15.15 16.45 16.45 240.00 378.50 12/16/2021
Total/Average 15 7 5 517,413 14,814 61,330 24.76 159.83 17.65 19.13 21.10 23.05 23.05 336.33 527.66

Cavite - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Amadeo 601 C 16 12/31/2022 242,038 8,732 43,660 20.83 211.00 26.00 28.00 31.00 35.00 35.00 471.00 751.00 3/15/2005
2. Carmona 561 B 17 12/31/2022 384,599 15,548 77,740 19.08 238.60 26.20 29.00 32.60 37.00 37.00 500.60 790.60 3/16/2004
3. Dasmarinas City 83 A 144 12/31/2022 3,704,810 121,879 609,395 18.59 173.00 20.80 24.95 29.35 33.80 33.80 381.00 630.50 8/7/2014
4. Gen. E. Aguinaldo 555 D 4 2 12/31/2022 89,799 3,689 18,445 16.24 163.00 17.30 19.70 23.45 27.60 27.60 336.00 533.00 6/3/2003
5. Gen. Mariano Alvarez 393 B 29 12/31/2022 547,457 23,102 115,510 18.96 280.00 29.65 32.35 35.70 40.65 40.65 576.50 900.00 6/23/2011
6. Indang 99 C 15 3 12/31/2022 261,499 9,872 49,360 21.84 188.00 22.25 24.90 27.25 27.25 27.25 410.50 659.50 2/23/2010
7. Maragondon 503 C 5 12/31/2022 116,862 4,069 20,345 20.23 185.00 19.80 21.45 23.70 26.45 29.75 383.00 597.50 5/22/2019
8. Mendez 424 C 10 12/31/2022 178,172 6,011 30,055 18.77 195.00 21.50 24.00 27.25 30.75 30.75 410.00 650.00 6/19/2002
9. Silang 115 A 77 2 12/31/2022 1,411,612 49,445 247,225 19.69 229.00 25.00 28.00 30.00 34.00 34.00 479.00 759.00 8/7/2014
10. Tagaytay City 37 B 19 2 12/31/2022 680,537 18,763 93,815 25.62 254.00 28.00 31.00 35.00 38.00 43.00 534.00 844.00 12/11/2014
11. Tanza 358 B 11 12/31/2022 463,981 16,428 82,140 23.43 180.00 18.30 19.45 20.90 23.25 23.25 363.00 557.50 2/3/2009
12. Trece Martires City 574 B 31 12/31/2022 640,741 27,893 139,465 18.25 170.00 18.25 19.55 20.90 23.50 23.50 352.50 548.00 7/8/2008
Total/Average 378 9 8,722,107 305,431 1,264,484 19.65 205.55 22.75 25.19 28.09 31.43 32.12 433.09 685.05

Cebu - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balamban 622 C 1 20 11 12/31/2022 442,008 15,764 78,820 17.33 170.00 19.15 21.75 24.85 29.20 29.20 361.50 579.00 11/7/2017
2. Bogo City 577 C 5 12/31/2022 156,431 10,230 51,150 16.39 231.00 26.00 29.75 34.40 40.30 40.30 491.00 788.50 9/3/2019
3. Carcar 117 B 31 6 12/31/2022 567,093 24,426 122,130 18.65 169.00 18.15 21.10 24.50 28.55 28.55 350.50 561.50 11/22/2021
4. Daanbantayan 632 D 18 139.00 15.30 16.80 18.50 20.30 20.30 292.00 460.00 5/21/2015
5. Dalaguete 436 C 5 3 12/31/2022 205,922 6,308 31,540 19.68 100.60 11.25 12.40 14.65 16.75 16.75 213.10 337.10 7/15/1997
6. Medellin 873 D 190.00 20.00 21.50 23.50 26.00 29.00 390.00 605.00 11/22/2021
7. Metro Cebu 11 A 5 140 12/31/2022 7,798,051 203,428 1,017,140 24.59 152.00 16.80 19.77 48.40 48.40 48.40 320.00 517.70 8/7/2014
8. Moalboal 476 C 2 2 12/31/2022 132,803 4,117 20,585 21.38 115.00 13.00 14.75 17.00 20.00 20.00 245.00 392.50 9/30/2003
9. Pinamungajan 420 C 16 5 6/30/2022 163,643 7,670 38,350 18.39 145.00 16.65 19.30 22.15 25.45 25.45 311.50 504.50 1/27/2009
10. Tabuelan 617 D 3 12/31/2022 114,713 4,683 23,415 17.93 135.00 16.00 19.00 23.00 28.00 28.00 295.00 485.00 6/26/2012
11. Toledo City 195 B 20 4 12/31/2022 553,338 17,333 86,665 20.29 200.00 23.30 27.15 31.60 37.15 37.15 433.00 704.50 10/19/2021
Total/Average 6 258 34 10,134,002 293,959 1,216,990 22.74 158.78 17.78 20.29 25.68 29.10 29.37 336.60 539.57

Compostela Valley - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Compostela 863 D 3 7/31/2022 31,450 1,722 8,610 15.05 195.00 21.00 23.00 25.50 28.50 28.50 405.00 635.00 5/22/2018
2. Nabunturan 146 D 15 12/31/2022 136,845 4,269 21,345 19.39 241.85 25.50 30.00 37.10 45.95 45.95 496.85 796.85 9/8/2009
Total/Average 18 168,295 5,991 24,803 18.14 218.42 23.25 26.50 31.30 37.22 37.22 450.92 715.92

Davao Oriental - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Baganga 154 D 3 12/31/2022 47,725 2,190 10,950 16.42 210.45 21.95 23.80 26.60 30.40 30.40 429.95 667.95 6/18/2021
2. Lupon 428 D 3 12/31/2022 70,893 3,217 16,085 17.51 210.00 22.20 24.80 27.45 30.15 30.15 432.00 680.00 4/1/2003
3. Mati City 35 C 31 12/31/2022 186,460 8,218 41,090 19.53 100.00 10.75 11.67 12.90 12.90 12.90 207.50 324.20 9/22/1995
4. San Isidro 161 D 4 12/31/2022 59,565 2,159 10,795 19.32 218.00 22.45 23.40 26.20 29.10 29.10 442.50 676.50 11/6/2019
5. Tarragona 847 D 4 1 185.00 19.00 20.00 21.20 22.50 22.50 375.00 575.00 8/17/2017
Total/Average 45 1 364,643 15,784 65,346 18.66 184.69 19.27 20.73 22.87 25.01 25.01 377.39 584.73

Davao del Norte - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Asuncion 685 D 3 12/31/2022 84,946 4,770 23,850 14.40 230.00 29.00 36.00 43.00 50.00 50.00 520.00 880.00 3/20/2014
2. Braulio E. Dujali 579 D 2 12/31/2015 13,655 546 2,730 14.36 262.00 27.50 29.15 31.00 33.35 33.35 537.00 828.50 6/25/2002
3. Carmen 319 D 4 6/30/2022 19,954 973 4,865 16.47 248.50 25.65 28.55 31.55 34.60 34.60 505.00 790.50 1/13/2004
4. Island Garden City of Samal 564 C 8 37 12/31/2021 251,704 7,812 39,060 20.95 155.90 17.70 19.85 22.00 24.15 24.15 332.90 531.40 5/20/2003
5. Kapalong 665 D 1 192.00 21.60 24.30 27.90 32.50 32.50 408.00 651.00 9/25/2017
6. New Corella 552 D 4 12/31/2022 28,703 1,742 8,710 13.73 187.56 21.95 23.65 25.40 27.25 27.25 407.06 643.56 3/10/2004
7. Panabo City 200 C 13 12/31/2022 235,951 9,589 47,945 23.47 194.35 19.60 20.60 23.35 26.25 26.25 390.35 596.35 2/17/2004
8. Tagum City 175 A 1 7 11/30/2022 1,089,030 41,619 208,095 19.90 221.60 23.90 25.75 31.65 38.25 45.00 460.60 718.10 11/23/2004
Total/Average 9 67 4 1,723,943 67,051 277,591 19.88 211.48 23.36 25.98 29.48 33.29 34.13 445.11 704.92

Davao del Sur - 11
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bansalan 57 C 2 4 12/31/2022 112,683 5,145 25,725 15.85 170.00 20.00 23.00 26.00 29.00 29.00 370.00 600.00 8/22/2001
2. Davao City 5 A 112 2 12/31/2022 10,923,644 243,873 1,219,365 28.84 178.50 18.70 24.20 32.10 46.80 46.80 365.50 607.50 6/2/2022
3. Digos City 147 B 10 12/31/2022 662,104 26,161 130,805 19.54 183.90 20.50 23.35 26.95 31.25 31.25 388.90 622.40 12/4/2001
4. Hagonoy 548 D 2 12/31/2022 40,886 2,337 11,685 15.69 195.00 21.60 23.75 26.10 28.50 28.50 411.00 648.50 9/25/2014
5. Kiblawan 507 D 1 12/31/2015 18,222 661 3,305 19.88 253.00 27.00 28.75 30.55 32.40 32.40 523.00 810.50 12/5/2017
Total/Average 127 6 11,757,539 278,177 1,151,653 27.60 196.08 21.56 24.61 28.34 33.59 33.59 411.68 657.78

Dinagat Island - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dinagat 833 D 253.00 27.00 28.75 30.55 32.40 32.40 523.00 810.50 12/5/2017
2. San Jose (Dinagat Island) 578 D 1 4 9/30/2020 56,754 2,741 13,705 14.31 200.00 21.00 23.00 26.00 30.00 30.00 410.00 640.00 6/5/2014
Total/Average 1 4 56,754 2,741 11,348 14.31 226.50 24.00 25.87 28.27 31.20 31.20 466.50 725.25

Eastern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Borongan 116 D 1 4 11/30/2022 88,300 2,261 11,305 8.89 210.00 22.00 24.00 27.00 31.00 31.00 430.00 670.00 1/2/2003
2. Gen. Macarthur 568 D 1 1 12/31/2022 14,600 886 4,430 12.83 300.00 32.00 35.00 39.00 44.00 44.00 620.00 970.00 2/9/2022
3. Guiuan 201 D 6 7/31/2022 198,301 3,680 18,400 17.19 228.00 24.20 25.90 28.00 30.50 30.50 470.00 729.00 11/26/2002
4. Llorente 220 D 2 12/31/2004 109 545 180.00 21.00 24.50 27.50 31.50 31.50 390.00 635.00 11/24/2009
5. Oras 276 D 1 198.00 22.80 26.80 31.80 37.80 37.80 426.00 694.00 5/22/2019
6. Sulat 425 D 1 12/31/2015 5,164 438 2,190 11.25 198.85 22.35 22.90 24.95 26.10 26.10 422.35 651.35 5/20/2008
7. Taft 584 D 1 1 4/30/2022 25,853 1,454 7,270 11.98 280.00 30.75 33.50 37.50 41.75 41.75 587.50 922.50 3/5/2011
Total/Average 1 13 5 332,218 8,719 36,097 13.43 227.83 25.01 27.51 30.82 34.66 34.66 477.97 753.12

Guimaras - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Buenavista 164 C 22 1 12/31/2022 169,735 6,392 31,960 18.57 205.00 20.55 27.95 43.70 49.65 49.65 410.50 690.00 6/27/2006
2. Jordan 289 D 6 4 12/31/2012 33,901 763 3,815 36.13 177.35 22.50 27.30 32.75 38.25 38.25 402.35 675.35 11/27/2000
3. Nueva Valencia 242 D 1 12/31/2012 9,069 530 2,650 14.26 216.00 22.00 25.00 28.00 31.00 31.00 436.00 686.00 2/26/2020
Total/Average 28 6 212,705 7,685 31,816 20.01 199.45 21.68 26.75 34.81 39.63 39.63 416.28 683.78

Ifugao - CAR
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banaue 861 D 1 12/31/2022 11,684 509 2,545 18.14 178.00 19.30 21.05 23.05 25.30 25.30 371.00 581.50 9/3/2019
2. Ifugao 325 D 2 6/30/2022 27,726 1,056 5,280 14.74 300.00 31.00 32.50 34.50 37.00 37.00 610.00 935.00 5/22/2019
Total/Average 3 39,410 1,565 6,479 15.84 239.00 25.15 26.77 28.77 31.15 31.15 490.50 758.25

Ilocos Norte - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bangui 799 D 1 6/30/2022 18,799 826 4,130 19.63 200.00 21.50 23.25 25.25 27.50 27.50 415.00 647.50 8/7/2017
2. Batac 250 D 14 12/31/2022 77,681 1,723 8,615 15.24 300.00 31.30 32.70 34.25 36.30 36.30 613.00 940.00 3/21/2006
3. Dingras 208 D 10 12/31/2022 49,633 2,291 11,455 15.72 283.00 29.40 30.55 31.80 33.20 33.20 577.00 882.50 3/15/2011
4. Ilocos Norte 210 B 45 2 12/31/2022 576,183 27,728 138,640 18.87 155.00 17.80 21.35 25.25 30.00 30.00 333.00 546.50 1/28/2000
5. Pagudpud 706 D 1 12/31/2022 18,895 1,194 5,970 12.90 190.00 20.00 21.25 22.75 24.50 24.50 390.00 602.50 11/5/2012
6. San Nicolas 207 C 6 12/31/2022 148,359 5,883 29,415 20.19 166.00 19.50 21.65 25.55 30.85 36.05 361.00 577.50 11/19/2019
7. Sarrat 350 D 2 1 12/31/2022 35,903 1,051 5,255 16.69 229.00 24.50 26.45 28.55 30.70 30.70 474.00 738.50 3/21/2006
Total/Average 78 4 925,453 40,696 168,481 18.51 217.57 23.42 25.31 27.62 30.43 31.17 451.85 705.00

Ilocos Sur - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Candon City 571 D 1 12/31/2022 108,582 4,177 20,885 20.74 290.00 31.90 36.00 41.30 48.60 48.60 609.00 969.00 2/23/2009
2. Magsingal 526 D 4 12/31/2022 19,728 859 4,295 19.58 200.00 21.50 23.50 25.75 28.75 28.75 415.00 650.00 3/20/2014
3. Metro Vigan 53 B 1 15 1 6/30/2022 386,749 15,284 76,420 20.11 215.50 25.00 26.00 27.15 28.45 28.45 465.50 725.50 2/27/2001
4. Narvacan 352 D 1 12/31/2022 39,401 1,911 9,555 16.66 276.00 30.40 32.35 34.80 37.35 37.35 580.00 903.50 9/24/2015
5. Santa 299 D 1 1 12/31/2014 9,479 513 2,565 18.47 100.00 11.00 12.00 14.00 16.00 16.00 210.00 330.00 11/8/2010
6. Sinait 573 D 6 7/31/2022 12,280 661 3,305 17.46 230.00 24.50 26.65 29.30 32.25 32.25 475.00 741.50 7/16/2012
7. Sta. Lucia 349 D 1 12/31/2022 24,352 1,359 6,795 14.51 275.00 28.00 29.00 30.50 32.50 32.50 555.00 845.00 5/4/2010
8. Tagudin 177 D 1 12/31/2022 14,631 899 4,495 13.24 255.00 30.35 33.65 36.90 40.15 40.15 558.50 895.00 9/3/2019
Total/Average 2 29 2 615,202 25,663 106,245 19.30 230.18 25.33 27.39 29.96 33.00 33.00 483.50 757.43

Iloilo - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ajuy 110 D 1 12/31/2012 8,035 313 1,565 16.74 80.00 11.90 12.90 13.90 13.90 13.90 199.00 328.00 8/6/1996
2. Alimodian 185 D 10 8/31/2020 49,996 1,494 7,470 21.79 210.00 22.20 23.50 24.90 26.40 28.00 432.00 667.00 10/25/2019
3. Anilao 331 D 1 12/31/2014 12,736 870 4,350 11.71 158.00 17.20 18.95 21.00 23.40 23.40 330.00 519.50 11/23/1999
4. Banate 318 D 5 12/31/2014 24,592 1,582 7,910 10.56 303.00 31.70 33.75 36.95 41.20 41.20 620.00 957.50 11/1/2005
5. Calinog 363 D 1 6 12/31/2022 31,360 1,330 6,650 17.68 230.00 24.00 25.00 26.00 27.00 27.00 470.00 720.00 5/28/2008
6. Concepcion 375 D 4 7/31/2020 4,628 285 1,425 12.51 213.75 22.90 24.60 26.35 28.15 28.15 442.75 688.75 7/6/1999
7. Dingle-Pototan 77 D 1 2 6/30/2021 97,028 4,196 20,980 17.52 250.00 29.65 35.90 42.75 51.40 51.40 546.50 905.50 1/29/2008
8. Duenas 345 D 14 9/30/2021 9,750 506 2,530 14.87 262.00 27.60 29.00 40.00 47.00 47.00 538.00 828.00 12/5/2017
9. Dumangas-Barotac Nuevo 237 C 7 283.00 28.60 32.00 37.35 44.30 52.45 569.00 889.00 4/22/2003
10. Estancia 360 D 1 12/31/2015 16,644 733 3,665 16.25 260.00 29.00 32.00 35.50 39.50 39.50 550.00 870.00 2/8/2005
11. Igbaras 390 D 1 12/31/2022 25,574 1,280 6,400 18.37 352.00 37.15 39.15 41.15 43.15 43.15 723.50 1,115.00 4/29/2015
12. Janiuay 226 D 6 6/30/2016 28,382 1,094 5,470 17.50 288.00 32.00 34.90 37.85 40.75 40.75 608.00 957.00 2/16/2010
13. Lambunao 225 D 3 12/31/2014 23,206 1,200 6,000 16.72 352.00 39.50 43.85 48.20 52.65 52.65 747.00 1,185.50 12/11/2014
14. Lemery 431 D 1 12/31/2014 5,171 128 640 13.28 225.00 23.10 24.40 26.40 26.40 26.40 456.00 700.00 2/23/2009
15. Leon 466 D 1 170.00 17.70 18.65 19.95 21.60 21.60 347.00 533.50 5/30/2000
16. Metro Iloilo 71 A 7 10 6/30/2016 1,942,347 36,096 180,480 25.74 200.00 22.00 25.00 29.00 34.00 34.00 420.00 670.00 11/9/2018
17. Miagao 383 D 1 2 6/30/2022 30,573 1,191 5,955 17.76 262.00 39.25 43.35 47.45 51.55 51.55 654.50 1,088.00 5/3/2005
18. New Lucena 446 D 4 12/31/2015 7,926 600 3,000 9.93 221.00 23.20 24.75 27.00 30.00 30.00 453.00 700.50 5/6/2021
19. San Joaquin 388 D 1 12/31/2021 27,530 1,190 5,950 16.41 308.00 31.90 33.30 34.90 36.85 36.85 627.00 960.00 3/16/2004
20. Tubungan 595 D 1 12/31/2020 16,466 1,077 5,385 12.56 195.00 23.75 27.00 30.25 33.50 33.50 432.50 702.50 5/16/2006
21. Zarraga 508 D 1 5 12/31/2022 81,570 3,650 18,250 18.62 325.00 33.80 36.00 38.85 41.85 41.85 663.00 1,023.00 10/19/2021
Total/Average 10 89 2 2,443,514 58,815 243,494 22.21 245.13 27.05 29.42 32.65 35.93 36.39 515.65 809.91

Isabela - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alicia 198 D 7 12/31/2022 119,851 6,136 30,680 14.72 285.00 30.50 33.50 37.00 41.00 41.00 590.00 925.00 5/9/2006
2. Angadanan 278 D 1 12/31/2022 22,856 916 4,580 19.07 210.00 22.70 24.70 27.00 29.50 29.50 437.00 684.00 11/25/2003
3. Aurora 856 D 5 12/31/2022 41,834 1,831 9,155 16.28 145.00 19.25 22.20 25.30 28.45 28.45 337.50 559.50 1/22/2022
4. Benito Soliven 283 D 6 12/31/2022 23,408 1,705 8,525 11.15 290.00 38.00 39.00 40.00 41.00 41.00 670.00 1,060.00 1/28/2016
5. Cabagan 182 C 7 12/31/2022 100,649 5,451 27,255 13.73 204.00 30.10 36.10 43.40 43.40 43.40 505.00 866.00 10/9/2007
6. Cauayan City 183 B 17 12/31/2022 370,008 13,296 66,480 22.36 150.00 16.60 18.70 21.15 24.45 24.45 316.00 503.00 9/25/2017
7. City of Ilagan 90 C 26 12/31/2022 171,809 8,421 42,105 13.61 350.00 36.45 41.65 48.45 55.00 55.00 714.50 1,131.00 12/5/2017
8. Cordon 287 D 3 12/31/2022 16,434 858 4,290 15.39 325.00 33.65 35.30 37.35 39.80 39.80 661.50 1,014.50 2/12/2002
9. Gamu 615 D 9 6/30/2022 46,624 2,502 12,510 15.28 170.00 18.45 19.90 21.35 22.80 22.80 354.50 553.50 6/15/2010
10. Luna 460 D 1 12/31/2022 5,052 290 1,450 18.12 225.00 24.50 26.75 29.25 32.00 32.00 470.00 737.50 8/7/2017
11. Naguilian 781 D 9 11/30/2022 43,409 2,480 12,400 14.12 235.00 24.25 25.25 26.50 28.00 28.00 477.50 730.00 11/22/2021
12. Ramon 294 D 4 12/31/2022 41,113 1,109 5,545 12.58 265.00 29.85 33.45 37.30 41.60 41.60 563.50 898.00 2/17/2004
13. Reina Mercedes 572 D 2 12/31/2022 60,879 2,521 12,605 20.09 150.00 16.25 17.50 18.75 20.00 20.00 312.50 487.50 10/12/2010
14. Roxas 199 C 7 12/31/2022 91,766 4,112 20,560 17.38 230.00 23.60 26.20 29.30 32.30 32.30 466.00 728.00 12/2/2009
15. San Guillermo 485 D 4 12/31/2022 21,316 1,112 5,560 16.48 210.00 21.75 23.50 26.25 30.00 30.00 427.50 662.50 12/20/2018
16. San Manuel 421 D 4 6/30/2022 77,900 3,180 15,900 19.60 204.00 21.00 21.60 22.20 22.80 22.80 414.00 630.00 3/22/2011
17. Santiago City 92 B 19 12/31/2022 436,055 15,614 78,070 18.57 297.00 32.00 37.00 47.00 51.00 51.00 617.00 987.00 3/23/1999
18. Tumauini 309 C 9 12/31/2022 148,725 6,006 30,030 20.97 200.00 20.65 21.40 22.20 23.45 23.45 406.50 620.50 1/22/2018
Total/Average 140 1,839,688 77,540 321,016 17.64 230.27 25.53 27.98 31.09 33.69 33.69 485.58 765.41

La Union - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balaoan 59 D 4 2 6/30/2022 40,533 2,365 11,825 15.13 278.00 29.40 31.30 33.65 36.45 36.45 572.00 885.00 10/5/2020
2. Metro San Fernando 16 B 35 2 4/30/2022 376,423 9,091 45,455 16.37 250.00 26.00 31.15 39.05 43.85 43.85 510.00 821.50 1/13/2010
3. Naguilian 84 D 6 1 6/30/2021 129,852 4,045 20,225 18.30 220.00 22.55 23.85 25.70 28.30 28.30 445.50 684.00 4/27/2011
4. Rosario 89 D 2 4 12/31/2022 19,584 404 2,020 9.14 269.00 27.85 28.65 28.95 29.25 29.25 547.50 834.00 9/14/2005
Total/Average 49 9 566,392 15,905 65,847 16.49 254.25 26.45 28.73 31.83 34.46 34.46 518.75 806.12

Laguna - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos 120 C 12 1 12/31/2018 151,510 6,526 32,630 18.42 175.00 20.10 23.20 27.00 32.10 37.30 376.00 608.00 10/25/2019
2. Cabuyao 596 C 18 12/31/2022 589,439 19,795 98,975 19.80 190.00 21.00 22.60 24.70 27.00 27.00 400.00 626.00 6/25/2015
3. Calamba 29 A 82 1 12/31/2022 2,037,293 69,200 346,000 21.36 183.00 20.30 24.05 30.80 36.45 36.45 386.00 626.50 7/8/2008
4. Laguna 38 A 16 12/31/2022 1,129,768 44,143 220,715 20.15 193.00 20.25 23.20 26.65 29.20 34.40 395.50 627.50 6/28/2005
5. Mabitac 668 D 1 12/31/2022 43,839 2,029 10,145 20.10 170.00 17.50 18.25 19.25 20.50 20.50 345.00 527.50 6/26/2014
6. Pagsanjan 122 C 8 3 10/31/2018 243,116 9,358 46,790 15.32 200.00 22.00 24.00 26.00 29.00 29.00 420.00 660.00 2/15/2005
7. Pakil 518 D 1 1 12/31/2017 60,438 2,476 12,380 16.50 160.00 17.30 18.70 20.30 21.90 21.90 333.00 520.00 10/29/2012
8. San Pablo City 4 A 31 6 12/31/2022 1,752,734 47,717 238,585 23.97 182.00 19.35 21.45 23.60 24.75 24.75 375.50 590.00 7/26/2018
9. San Pedro 170 B 54 12/31/2022 894,999 35,747 178,735 22.03 198.00 20.40 21.20 22.20 23.30 23.30 402.00 614.00 8/10/2010
10. Siniloan 395 C 9 2 6/30/2022 263,365 9,149 45,745 19.38 160.00 16.90 18.60 20.80 24.00 24.00 329.00 515.00 8/28/2012
11. Sta. Cruz 127 B 19 12/31/2021 470,265 19,132 95,660 17.52 175.00 18.50 19.75 21.25 23.00 23.00 360.00 557.50 3/12/2002
Total/Average 251 14 7,636,766 265,272 1,098,226 20.92 180.54 19.41 21.36 23.86 26.47 27.41 374.72 588.36

Lanao del Norte - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod 543 C 3 6/30/2022 96,747 3,890 19,450 18.27 214.00 23.00 25.70 28.75 32.25 32.25 444.00 701.00 3/2/2022
2. Kapatagan 418 C 2 1 6/30/2022 220,141 6,357 31,785 21.51 173.50 20.75 24.00 27.75 32.25 32.25 381.00 621.00 7/16/2013
3. Kauswagan 540 D 10 2 12/31/2022 68,530 2,666 13,330 21.32 200.00 22.00 24.00 26.50 26.50 26.50 420.00 660.00 12/2/2009
4. Kolambugan 539 D 2 2 12/31/2022 62,773 3,169 15,845 14.93 155.00 21.25 22.10 23.00 23.00 23.00 367.50 588.50 5/12/2016
5. Linamon 517 D 3 6/30/2022 55,256 2,205 11,025 20.79 147.00 16.40 17.80 20.60 20.60 20.60 311.00 489.00 12/18/2007
6. Tubod-Baroy 228 D 10 12/31/2022 143,888 5,404 27,020 20.63 188.50 21.50 24.25 27.00 27.00 27.00 403.50 646.00 1/28/2016
Total/Average 27 8 647,334 23,691 98,081 19.81 179.66 20.81 22.97 25.60 26.93 26.93 387.83 617.58

Lanao del Sur - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Marawi City 3 D 3 7/31/2016 232,055 4,082 20,410 26.45 190.00 21.50 24.50 29.00 35.50 35.50 405.00 650.00 7/15/2008
2. Wao 519 C 6 12/31/2022 164,366 5,771 28,855 17.71 145.00 15.35 16.50 18.10 18.10 18.10 298.50 463.50 1/22/2018
Total/Average 3 6 396,421 9,853 40,791 21.33 167.50 18.42 20.50 23.55 26.80 26.80 351.75 556.75

Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Abuyog 121 D 3 12/31/2022 46,315 1,815 9,075 17.72 240.00 25.70 28.00 30.85 34.25 34.25 497.00 777.00 4/1/2003
2. Babatngon 438 D 1 1 12/31/2022 81,570 3,650 18,250 18.62 180.00 18.50 19.25 20.25 21.50 21.50 365.00 557.50 10/28/2014
3. Baybay City 39 C 2 2 9 12/31/2022 265,519 12,071 60,355 18.32 154.00 17.40 19.90 22.90 26.70 26.70 328.00 527.00 9/29/2020
4. Isabel 521 D 7 2 12/31/2022 44,390 5,638 28,190 16.52 240.00 26.50 29.50 33.00 37.00 37.00 505.00 800.00 11/19/2019
5. Jaro 157 D 1 2 12/31/2015 32,773 1,366 6,830 16.16 180.00 19.00 20.25 21.75 23.50 23.50 370.00 572.50 8/19/2008
6. Leyte Metro 19 B 3 1 12/31/2018 1,237,754 37,303 186,515 27.65 148.50 16.35 19.00 22.15 22.15 22.15 312.00 502.00 5/20/2003
7. Merida 520 D 2 12/31/2022 48,288 1,775 8,875 19.39 129.00 13.90 15.40 17.40 19.65 19.65 268.00 422.00 6/30/2009
8. Metro Carigara 246 B 2 1 12/31/2022 195,590 11,354 56,770 13.89 181.45 19.05 20.95 24.00 28.80 28.80 371.95 581.45 4/11/2000
9. Metro Hilongos 189 C 5 2 12/31/2021 99,586 4,812 24,060 15.83 262.00 28.70 31.20 34.30 37.60 37.60 549.00 861.00 12/16/2003
Total/Average 8 24 15 2,051,786 79,784 330,306 21.76 190.55 20.56 22.60 25.17 27.90 27.90 396.21 622.27

Maguindanao - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Cotabato 30 A 1 8 1 12/31/2022 1,452,391 40,410 202,050 26.25 184.00 20.35 23.50 26.70 29.95 29.95 387.50 622.50 2/11/2003
Total/Average 1 9 1 1,452,391 40,410 167,297 26.25 184.00 20.35 23.50 26.70 29.95 29.95 387.50 622.50

Masbate - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aroroy 137 D 1 12/31/2007 21,473 798 3,990 21.01 355.00 37.75 39.60 41.85 44.40 44.40 732.50 1,128.50 1/8/2008
2. Masbate-Mobo 69 C 7 12/31/2010 188,761 5,155 25,775 21.36 260.00 32.70 34.65 37.25 40.50 40.50 587.00 933.50 9/28/2005
Total/Average 8 210,234 5,953 24,645 21.31 307.50 35.22 37.12 39.55 42.45 42.45 659.75 1,031.00

Misamis Occidental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Ozamis 10 B 4 1 12/31/2022 401,620 21,614 108,070 16.18 250.00 30.00 35.00 41.00 48.00 58.00 550.00 900.00 9/11/2007
2. Oroquieta City 694 C 1 5 12/31/2022 241,990 9,491 47,455 17.87 220.00 26.00 30.00 35.00 41.00 49.00 480.00 780.00 9/11/2007
3. Tangub City 158 C 16 4 6/30/2022 143,229 4,764 23,820 22.71 161.00 17.50 21.00 22.90 22.90 22.90 336.00 546.00 7/23/2002
Total/Average 1 25 5 786,839 35,869 148,498 17.49 210.33 24.50 28.66 32.96 37.30 43.30 455.33 742.00

Misamis Oriental - 10
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Balingasag 501 D 3 1 12/31/2022 121,701 5,875 29,375 16.04 213.00 30.65 40.60 51.25 62.55 62.55 519.50 925.50 8/28/2007
2. Cagayan de Oro City 1 A 25 1 6/30/2019 5,649,982 99,671 498,355 27.16 218.40 30.55 31.85 33.65 36.00 36.00 523.90 842.40 6/17/2011
3. Claveria 212 D 8 12/31/2022 29,299 1,292 6,460 18.14 194.90 22.75 26.30 30.10 34.10 34.10 422.40 685.40 12/10/2010
4. Gingoog City 25 C 23 6 12/31/2022 342,486 13,990 69,950 20.18 208.00 22.00 24.00 26.00 28.00 28.00 428.00 668.00 10/16/2001
5. Tagoloan 634 D 3 1 12/31/2022 150,991 3,253 16,265 30.27 208.00 22.00 24.00 26.00 28.00 28.00 428.00 668.00 10/16/2001
6. Talisayan 864 D 2 1 12/31/2022 11,500 716 3,580 13.18 200.00 20.50 21.50 23.00 25.00 25.00 405.00 620.00 10/25/2019
Total/Average 56 18 6,305,959 124,797 516,660 25.77 207.05 24.74 28.04 31.66 35.60 35.60 454.46 734.88

Negros Occidental - 06
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacolod City 2 A 1 65 2 12/31/2022 2,101,569 68,597 342,985 22.50 208.00 21.40 22.75 25.80 30.05 30.05 422.00 649.50 9/15/2009
2. Bago City 317 C 11 4/30/2022 233,098 8,283 41,415 18.06 152.00 15.85 17.50 18.90 20.40 20.40 310.50 485.50 4/5/2005
3. Binalbagan 103 C 5 6/30/2022 135,312 5,504 27,520 15.83 230.00 33.00 37.70 42.70 48.10 48.10 560.00 937.00 7/24/2003
4. Cadiz City 386 C 1 1 6/30/2016 312,588 8,100 40,500 20.01 140.00 16.80 17.75 19.60 21.95 21.95 308.00 485.50 3/8/2005
5. Escalante 165 D 2 2 1/31/2018 43,419 2,269 11,345 15.95 144.70 18.10 22.90 27.70 32.50 32.50 325.70 554.70 4/21/1997
6. Himamaylan 102 C 7 1 3/31/2022 146,705 7,458 37,290 13.93 225.00 30.00 32.00 34.00 36.00 36.00 525.00 845.00 7/8/2003
7. Kabankalan City 50 C 2 3 1 12/31/2022 174,192 8,941 44,705 14.81 195.00 38.90 42.75 47.80 53.55 53.55 584.00 1,011.50 4/22/2008
8. La Carlota City 49 C 17 2 12/31/2022 378,373 14,486 72,430 20.21 137.50 15.25 17.00 19.05 22.40 22.40 290.00 460.00 5/22/2019
9. La Castellana 281 D 3 6/30/2016 74,911 1,806 9,030 22.93 127.00 13.05 13.55 14.30 14.80 14.80 257.50 393.00 2/9/1998
10. Manapla 234 D 2 12/31/2022 50,148 2,852 14,260 16.79 240.00 26.70 32.10 37.50 42.90 42.90 507.00 828.00 5/12/2004
11. Murcia 611 C 6 12/31/2022 291,637 6,651 33,255 19.71 150.00 16.85 18.50 20.90 22.95 22.95 318.50 503.50 3/25/2008
12. Pulupandan 631 D 1 12/31/2022 36,053 2,303 11,515 14.46 260.00 27.25 28.75 30.75 33.25 33.25 532.50 820.00 9/27/2012
13. Sagay 129 C 16 3/31/2022 335,679 17,788 88,940 15.39 197.00 20.15 21.95 23.80 26.05 28.65 398.50 618.00 11/10/2020
14. Silay City 27 C 10 12/31/2022 272,688 11,528 57,640 15.18 271.00 29.85 36.10 43.55 53.50 53.50 569.50 930.50 9/21/2010
15. Sipalay 252 D 1 6/30/2022 33,409 1,282 6,410 17.95 279.00 28.50 29.75 31.25 33.25 33.25 564.00 861.50 11/5/2003
16. Talisay City 533 C 9 12/31/2020 241,511 7,817 39,085 18.92 190.00 21.95 25.15 27.90 33.00 33.00 409.50 661.00 12/8/1997
17. Victorias 70 C 12 11/30/2021 248,337 8,174 40,870 21.74 200.00 22.40 26.60 32.20 37.80 37.80 424.00 690.00 4/22/2015
Total/Average 3 168 18 5,109,629 183,839 761,093 19.36 196.83 23.29 26.04 29.27 33.08 33.23 429.77 690.24

Negros Oriental - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ayungon 569 D 9 4 3/31/2022 76,002 4,087 20,435 17.10 135.00 15.50 18.50 22.50 27.50 27.50 290.00 475.00 6/18/2021
2. Bais City 530 C 2 11 3 12/31/2017 157,764 8,026 40,130 15.43 238.00 25.80 28.70 33.10 38.50 38.50 496.00 783.00 4/27/2011
3. Bayawan 221 C 1 14 12/31/2022 191,560 10,119 50,595 15.38 230.00 28.20 33.90 39.80 45.80 45.80 512.00 851.00 2/11/2016
4. Dumaguete City 47 B 20 7/31/2022 1,301,248 35,632 178,160 21.61 202.50 24.60 29.00 34.85 40.75 40.75 448.50 738.50 11/22/2021
5. Sibulan 253 C 9 7 12/31/2022 211,508 12,113 60,565 14.51 165.00 20.25 22.75 26.25 30.50 30.50 367.50 595.00 7/22/1998
6. Tanjay 163 C 1 1 2 12/31/2022 270,473 7,556 37,780 16.94 139.15 15.30 17.60 21.10 26.40 26.40 292.15 468.15 4/13/1999
Total/Average 12 46 26 2,208,555 77,533 320,987 18.35 184.94 21.60 25.07 29.60 34.90 34.90 401.02 651.77

North Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aleosan 755 D 3 12/31/2022 7,890 469 2,345 15.52 235.00 26.50 30.00 34.00 38.50 38.50 500.00 800.00 8/7/2017
2. Kabacan 194 C 8 12/31/2022 208,692 9,367 46,835 20.92 175.00 21.30 25.60 30.40 35.70 35.70 388.00 644.00 3/20/2018
3. Metro Kidapawan 41 A 1 4 9 12/31/2022 859,121 38,388 191,940 17.48 204.50 23.40 26.40 29.50 32.80 36.40 438.50 702.50 9/17/2020
4. Metro Midsayap 174 C 1 20 12/31/2022 220,819 9,718 48,590 15.06 255.00 33.00 40.50 48.00 55.50 55.50 585.00 990.00 6/5/2015
5. Mlang 209 C 7 12/31/2022 120,557 4,986 24,930 18.52 233.25 25.05 26.85 28.85 31.05 31.05 483.75 752.25 1/15/2002
6. Pigcawayan 477 D 7 12/31/2022 46,324 1,880 9,400 16.53 199.60 21.30 22.65 24.00 25.35 25.35 412.60 639.10 5/22/2019
7. Pikit 495 D 5 12/31/2022 64,960 2,983 14,915 17.27 237.50 25.45 27.70 30.80 33.85 33.85 492.00 769.00 8/19/2008
8. Tulunan 590 D 1 6/30/2022 9,905 413 2,065 10.43 246.65 25.90 27.50 29.30 31.60 31.60 505.65 780.65 8/13/2002
Total/Average 2 60 10 1,538,268 68,204 282,365 17.59 223.31 25.23 28.40 31.85 35.54 35.99 475.68 759.68

Northern Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Catarman 359 D 4 12/31/2021 34,659 1,409 7,045 15.67 243.00 27.85 31.50 35.00 39.00 39.00 521.50 836.50 11/7/2017
2. Gamay 619 D 1 180.00 19.30 20.70 22.20 24.00 24.00 373.00 580.00 7/23/2015
3. Laoang 381 D 7 12/31/2010 18,502 441 2,205 15.22 250.00 26.00 27.50 29.25 31.25 31.25 510.00 785.00 3/5/2003
4. San Isidro 557 D 1 7/31/2022 6,094 307 1,535 19.85 185.00 19.25 20.20 21.70 23.70 23.70 377.50 579.50 7/13/2012
5. San Jose 583 D 1 3 1 11/30/2021 29,662 1,485 7,425 15.64 230.00 23.70 24.65 26.30 28.30 28.30 467.00 713.50 6/25/2002
6. Victoria 556 D 1 12/31/2014 10,000 426 2,130 12.89 132.00 13.40 13.85 14.50 15.85 15.85 266.00 404.50 5/3/2001
Total/Average 1 16 2 98,917 4,068 16,842 15.63 203.33 21.58 23.06 24.82 27.01 27.01 419.16 649.83

Nueva Ecija - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongabon 410 C 1 18 12/31/2022 122,604 6,546 32,730 16.32 265.00 27.50 29.25 31.65 34.70 38.05 540.00 832.50 12/10/2002
2. Cabanatuan City 15 A 47 5/31/2022 1,612,228 53,524 267,620 21.74 192.00 21.60 23.80 26.40 29.60 33.70 408.00 646.00 9/13/2012
3. Cabiao 414 B 6 5/31/2021 311,538 13,616 68,080 21.61 160.00 16.15 16.30 16.65 16.65 16.65 321.50 484.50 4/4/2000
4. Cuyapo 224 D 7 4/30/2021 86,535 4,119 20,595 17.62 300.00 31.50 33.05 34.70 36.45 38.25 615.00 945.50 1/19/2017
5. Gapan City 21 C 10 12/31/2022 338,961 10,880 54,400 19.48 193.00 20.50 22.00 24.00 26.60 30.35 398.00 618.00 11/14/2006
6. Gen. M. Natividad 353 D 3 12/31/2022 43,903 1,806 9,030 20.91 240.00 24.70 25.50 26.35 27.25 28.20 487.00 742.00 10/22/2002
7. Gen. Tinio 191 C 1 7 12/31/2022 85,939 3,848 19,240 17.61 245.00 25.50 27.50 30.50 34.50 39.50 500.00 775.00 11/10/2009
8. Guimba 295 B 10 12/31/2022 261,926 14,976 74,880 15.77 235.00 26.15 28.75 31.70 35.10 38.85 496.50 784.00 12/21/2004
9. Jaen 290 C 12 12/31/2022 197,721 9,164 45,820 18.67 245.00 26.20 27.55 29.05 31.00 33.20 507.00 782.50 7/8/2008
10. Licab 603 C 4 12/31/2022 60,799 3,608 18,040 15.80 239.00 25.30 26.90 28.85 31.10 33.70 492.00 761.00 7/3/2007
11. Lupao 316 D 5 3/31/2019 27,653 1,560 7,800 13.59 295.00 31.65 33.95 36.60 39.85 39.85 611.50 951.00 10/20/2020
12. Munoz City 328 C 7 12/31/2022 149,156 6,667 33,335 19.31 220.00 23.00 25.00 28.00 32.00 37.00 450.00 700.00 11/17/2009
13. Palayan City 343 C 6 15 11/30/2022 206,520 6,746 33,730 21.38 235.00 24.80 26.45 28.45 30.80 33.50 483.00 747.50 11/23/2004
14. Penaranda 306 C 7 12/31/2022 146,603 6,069 30,345 20.30 200.00 20.85 22.15 23.70 25.35 27.50 408.50 630.00 2/13/2001
15. San Antonio 131 C 7 12/31/2015 125,219 5,691 28,455 15.53 200.00 21.40 23.30 25.50 27.90 30.50 414.00 647.00 7/27/2010
16. San Jose City 36 C 4 1 12/31/2022 282,935 8,812 44,060 17.83 225.00 23.65 25.45 27.80 30.65 34.10 461.50 716.00 3/9/2010
17. Sta. Rosa 217 B 1 15 12/31/2022 286,062 13,681 68,405 20.87 180.00 19.15 20.65 22.45 24.55 26.95 371.50 578.00 8/23/2005
18. Talavera 293 B 16 12/31/2022 469,896 14,450 72,250 23.79 180.00 18.30 18.70 19.30 20.10 21.00 363.00 550.00 5/3/2001
19. Talugtug 494 D 10 12/31/2022 45,102 2,391 11,955 14.56 260.00 28.35 30.65 33.30 36.30 39.75 543.50 850.00 9/4/2007
Total/Average 9 211 1 4,861,300 188,154 778,958 19.91 226.78 24.01 25.62 27.62 30.02 32.66 466.92 723.18

Nueva Vizcaya - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Diadi 613 D 1 2 1 12/31/2022 6,696 491 2,455 13.49 250.00 27.50 30.80 35.00 40.00 40.00 525.00 833.00 11/14/2011
2. Kasibu 759 D 1 12/31/2021 9,167 460 2,300 15.51 155.00 16.50 17.75 19.25 21.00 21.00 320.00 497.50 11/6/2017
Total/Average 1 2 2 15,863 951 3,937 14.47 202.50 22.00 24.27 27.12 30.50 30.50 422.50 665.25

Occidental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Sablayan 197 C 13 3/31/2021 116,857 5,492 27,460 19.19 240.00 26.55 29.45 31.80 34.15 34.15 505.50 800.00 9/3/2019
2. San Jose 62 C 20 12/31/2022 194,446 7,618 38,090 16.67 258.00 27.00 28.40 30.00 31.80 31.80 528.00 812.00 3/17/2009
Total/Average 35 311,303 13,110 54,275 17.73 249.00 26.77 28.92 30.90 32.97 32.97 516.75 806.00

Oriental Mindoro - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Naujan 245 D 3 12/31/2022 29,635 1,767 8,835 12.71 250.00 27.25 30.35 34.10 36.10 36.10 522.50 826.00 6/5/2012
2. Pinamalayan 327 D 1 3 12/31/2022 94,432 3,590 17,950 14.32 196.00 21.00 23.00 26.40 29.70 29.70 406.00 636.00 7/7/2009
3. Pola 96 D 1 12/31/2022 29,812 1,137 5,685 15.36 200.00 21.40 23.55 26.00 28.60 28.60 414.00 649.50 1/21/2016
4. Roxas 334 D 1 12/31/2020 6,149 360 1,800 14.23 212.00 22.20 23.40 24.80 26.40 26.40 434.00 668.00 2/6/2008
Total/Average 1 9 160,028 6,854 28,376 14.07 214.50 22.96 25.07 27.82 30.20 30.20 444.12 694.87

Palawan - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aborlan 440 D 4/30/2001 212.00 22.20 23.40 24.80 26.40 26.40 434.00 668.00 2/6/2008
2. Culion 599 D 1 4 12/31/2022 36,585 1,484 7,420 17.50 225.00 24.05 27.25 32.10 38.50 38.50 465.50 738.00 12/5/2017
3. Puerto Princesa City 26 A 9 36 12/31/2022 1,392,189 52,917 264,585 21.12 280.00 29.90 32.70 36.40 41.10 41.10 579.00 906.00 12/15/2009
4. Roxas 449 D 1 1 5/31/2022 63,411 2,839 14,195 19.47 285.00 32.45 37.25 43.25 50.50 50.50 609.50 982.00 9/24/2015
5. Taytay 604 D 1 12/31/2012 10,221 767 3,835 11.90 270.00 28.75 31.50 35.05 39.65 39.65 557.50 872.50 7/2/2013
Total/Average 10 40 4 1,502,406 58,007 240,149 20.83 254.40 27.47 30.42 34.32 39.23 39.23 529.10 833.30

Pampanga - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Angeles City 322 A 40 1/31/2019 1,629,819 56,676 283,380 22.81 220.00 24.50 26.20 28.20 30.50 33.35 465.00 727.00 1/22/2018
2. Bacolor 160 D 7 7/31/2022 308,816 11,722 58,610 21.11 150.00 16.50 17.75 19.25 21.00 23.00 315.00 492.50 2/13/2007
3. Candaba 593 C 7 6/30/2019 150,860 6,717 33,585 20.28 240.00 27.00 29.25 31.75 34.50 37.50 510.00 802.50 8/9/2005
4. City of San Fernando 40 A 46 12/31/2022 1,592,346 60,406 302,030 22.38 185.00 20.75 23.50 26.55 30.00 34.00 392.50 627.50 10/29/2012
5. Floridablanca 256 B 22 12/31/2022 623,075 27,431 137,155 21.41 155.00 16.25 17.25 18.50 20.00 21.75 317.50 490.00 4/27/2010
6. Guagua 46 B 16 12/31/2022 539,605 20,231 101,155 21.37 160.00 17.60 20.00 23.20 27.20 32.00 336.00 536.00 2/17/2009
7. Lubao 232 B 19 12/31/2022 614,564 25,315 126,575 22.92 160.00 17.50 19.25 21.25 23.50 26.00 335.00 527.50 2/3/2009
8. Mabalacat City 61 A 45 12/31/2022 1,251,486 52,666 263,330 20.30 200.00 22.00 24.50 27.50 31.00 31.00 420.00 665.00 9/8/2009
9. Macabebe 171 C 8 12/31/2022 332,273 7,907 39,535 16.53 195.00 20.85 22.65 24.85 27.35 30.25 403.50 630.00 4/14/2009
10. Masantol 320 C 6 12/31/2022 167,986 6,252 31,260 16.96 195.00 20.25 21.10 22.00 23.00 24.00 397.50 608.50 7/2/2013
11. Porac 402 C 11 12/31/2014 170,645 5,826 29,130 19.21 180.00 16.25 17.75 19.50 21.50 23.75 342.50 520.00 1/25/2005
12. Sasmuan 484 D 7 6/30/2022 107,680 4,004 20,020 19.85 170.00 17.75 18.45 18.80 18.80 18.80 347.50 532.00 9/14/2005
13. Sta Rita 618 D 2 6/30/2022 46,957 2,185 10,925 20.50 160.00 21.00 26.30 32.00 38.00 44.65 370.00 633.00 12/2/2009
Total/Average 236 7,536,112 287,338 1,189,579 21.47 182.30 19.86 21.84 24.10 26.64 29.23 380.92 599.34

Pangasinan - 01
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Alaminos City 34 B 10 1 12/31/2022 596,457 19,657 98,285 19.98 176.00 20.70 24.85 30.00 36.20 36.20 383.00 631.50 8/7/2014
2. Alcala 166 C 17 12/31/2022 191,989 11,547 57,735 15.11 246.95 26.85 29.70 33.30 37.60 37.60 515.45 812.45 5/3/2004
3. Asingan 524 C 5 12/31/2021 125,854 5,880 29,400 16.97 299.00 31.00 32.50 34.50 37.00 37.00 609.00 934.00 8/2/2005
4. Balungao 560 D 1 3/31/2021 46,710 2,458 12,290 15.04 262.00 27.20 28.20 29.35 30.55 30.55 534.00 816.00 3/24/2009
5. Bani 74 D 1 6/30/2016 51,611 2,669 13,345 15.93 178.00 20.50 23.30 26.35 29.85 29.85 383.00 616.00 11/11/2008
6. Basista 544 D 3 12/31/2022 52,053 2,261 11,305 16.14 220.00 22.15 22.30 22.60 22.95 22.95 441.50 664.50 2/22/2011
7. Bayambang 119 C 1 16 12/31/2022 414,760 14,039 70,195 20.11 199.00 21.65 23.75 26.25 29.60 29.60 415.50 653.00 6/15/2005
8. Binalonan 285 C 9 12/31/2022 241,414 7,057 35,285 17.80 245.00 26.45 28.75 31.50 35.00 35.00 509.50 797.00 7/8/2008
9. Binmaley 97 B 13 6/30/2022 265,522 12,746 63,730 18.36 185.00 20.40 23.35 27.25 32.10 32.10 389.00 622.50 4/27/2011
10. Bugallon 567 D 3 11/30/2022 60,759 3,409 17,045 15.15 265.00 28.60 31.80 36.85 43.00 43.00 551.00 869.00 4/5/2011
11. Calasiao 700 D 6/30/2022 65,693 3,902 19,510 14.89 265.00 28.60 31.80 36.85 43.00 43.00 551.00 869.00 4/5/2011
12. Dagupan City 297 B 25 9/30/2016 802,252 23,215 116,075 22.93 182.00 20.00 21.80 25.45 26.85 26.85 382.00 600.00 11/8/2011
13. Dasol 674 D 2 12/31/2013 6,721 423 2,115 13.24 260.00 26.75 27.50 28.25 29.00 29.00 527.50 802.50 4/30/2012
14. Lingayen 52 C 12 5/31/2022 156,661 6,731 33,655 16.90 270.00 28.15 29.50 31.10 33.10 33.10 551.50 846.50 6/9/2016
15. Manaoag 128 C 5 1 5/31/2022 222,085 7,749 38,745 24.10 220.00 23.00 24.50 26.50 28.50 28.50 450.00 695.00 4/29/2008
16. Mangaldan 139 B 16 12/31/2022 525,749 15,292 76,460 21.53 125.00 13.50 15.00 17.00 20.50 20.50 260.00 410.00 7/2/2013
17. Mapandan 612 C 5 12/31/2022 125,865 6,662 33,310 18.34 240.00 24.75 26.25 28.50 31.50 31.50 487.50 750.00 4/29/2008
18. Metro Tayug 113 C 5 12/31/2022 129,100 4,546 22,730 15.38 204.00 22.40 24.50 26.60 28.90 28.90 428.00 673.00 2/8/2007
19. Pozorrubio 133 C 7 12/31/2022 179,787 7,522 37,610 16.74 215.00 22.35 24.00 26.70 31.00 31.00 438.50 678.50 7/8/2008
20. Rosales 270 C 9 12/31/2022 287,995 13,641 68,205 18.15 169.00 17.80 18.75 19.75 20.80 20.80 347.00 534.50 1/2/2007
21. San Carlos City 44 C 18 12/31/2022 248,116 11,556 57,780 16.17 315.00 33.05 35.60 38.50 42.30 42.30 645.50 1,001.50 12/20/2018
22. San Manuel 562 D 3 12/31/2022 109,561 4,161 20,805 17.21 199.00 20.40 21.40 22.90 24.90 24.90 403.00 617.00 4/14/2009
23. San Nicolas 255 D 8 12/31/2022 103,726 4,348 21,740 16.04 255.00 28.15 30.30 33.70 39.10 39.10 536.50 839.50 8/10/2010
24. San Quintin 553 D 2 1 11/30/2022 56,493 2,381 11,905 13.62 295.00 30.90 32.60 34.65 37.15 37.15 604.00 930.00 11/8/2010
25. Santa Maria 554 C 5 12/31/2022 110,292 6,839 34,195 14.91 218.00 22.60 23.95 25.70 27.75 27.75 444.00 683.50 7/4/2006
26. Santo Tomas 636 D 1 12/31/2022 38,442 1,942 9,710 20.51 220.00 23.00 24.00 25.00 26.00 26.00 450.00 690.00 10/20/2015
27. Umingan 148 D 10 12/31/2022 130,810 5,069 25,345 16.83 240.00 25.85 28.30 32.00 34.30 34.30 498.50 781.50 3/29/2005
28. Urbiztondo 304 D 2 12/31/2022 43,585 1,007 5,035 14.78 250.00 26.10 27.30 28.60 30.00 30.00 511.00 784.00 5/25/2004
29. Urdaneta City 24 B 9 12/31/2022 413,380 15,137 75,685 17.27 288.00 29.10 29.50 30.00 30.60 30.60 579.00 874.00 11/24/2009
30. Villasis 95 C 9 12/31/2022 187,254 8,347 41,735 18.54 188.00 20.30 22.10 24.25 26.80 26.80 391.00 612.00 1/22/2007
Total/Average 1 233 3 5,990,695 232,193 961,279 18.46 229.79 24.40 26.23 28.66 31.53 31.53 473.88 736.26

Quezon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Atimonan 260 D 1 4 12/31/2022 26,790 2,070 10,350 9.31 285.65 33.85 38.60 43.70 49.60 49.60 624.15 1,010.15 4/28/2009
2. Burdeos 581 D 1 12/31/2020 41,472 784 3,920 17.04 155.00 16.00 17.00 18.50 20.50 20.50 315.00 485.00 6/9/2016
3. Calauag 78 C 1 8 11/30/2022 86,000 4,275 21,375 15.88 235.00 29.00 30.00 35.00 35.00 35.00 525.00 825.00 7/2/2003
4. Candelaria 114 C 9 12/31/2022 209,654 8,267 41,335 20.38 200.00 21.50 23.50 26.00 29.00 29.00 415.00 650.00 9/17/2015
5. Catanauan 531 D 1 12/31/2012 26,486 1,234 6,170 14.86 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 10/29/2001
6. Dolores 462 D 1 3 3 12/31/2022 35,715 1,603 8,015 16.88 130.00 14.50 16.25 18.50 21.25 21.25 275.00 437.50 4/10/2003
7. Guinayangan 303 D 1 3 9 12/31/2022 56,802 3,219 16,095 14.37 201.00 21.85 24.00 26.40 28.90 28.90 419.50 659.50 1/8/2008
8. Gumaca 79 D 9 12/31/2022 53,447 1,595 7,975 18.14 262.00 28.40 30.80 33.85 38.05 38.05 546.00 854.00 2/1/2005
9. Infanta - Gen. Nakar 229 C 6 11/30/2022 238,370 11,558 57,790 17.34 248.00 27.05 29.90 33.85 36.05 36.05 518.50 817.50 10/10/2014
10. Lopez 45 D 3 4 12/31/2022 59,520 3,410 17,050 13.18 251.00 26.45 28.15 30.30 33.60 33.60 515.50 797.00 3/4/2008
11. Macalelon 580 D 3 12/31/2010 11,377 579 2,895 12.31 322.00 33.50 35.50 38.50 42.50 42.50 657.00 1,012.00 3/1/2005
12. Mauban 298 D 5 4 3/31/2022 63,444 3,421 17,105 16.66 221.00 23.55 25.95 29.20 33.25 33.25 456.50 716.00 5/4/2010
13. Polilio 600 D 2 10/31/2022 21,257 1,312 6,560 13.50 200.00 21.00 22.50 24.50 27.00 27.00 410.00 635.00 1/20/2004
14. Quezon Metro 17 A 36 16 6/30/2016 1,468,056 42,886 214,430 25.95 146.00 15.75 17.20 18.85 20.95 20.95 303.50 475.50 6/23/2011
15. San Francisco 842 D 2 12/31/2022 54,161 1,969 9,845 20.80 185.00 19.00 20.50 22.50 25.00 25.00 375.00 580.00 1/1/2001
16. Tagkawayan 130 C 1 3 12/31/2022 72,021 3,756 18,780 16.05 246.00 27.90 31.40 35.40 39.90 39.90 525.00 839.00 1/28/2016
17. Tiaong 151 C 7 10/31/2022 244,898 11,704 58,520 17.72 200.00 22.50 25.00 30.00 37.50 37.50 425.00 675.00 8/23/2005
Total/Average 6 97 51 2,769,470 103,642 429,078 20.63 216.03 23.57 25.69 28.67 31.94 31.94 451.80 708.71

Quirino - 02
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Aglipay 354 D 4/30/2001 200.00 22.50 25.00 27.50 30.00 30.00 425.00 675.00 12/20/2018
2. Diffun 279 D 4 3/31/2021 21,133 1,294 6,470 14.88 330.00 36.65 40.45 44.60 48.75 48.75 696.50 1,101.00 10/12/2010
3. Maddela 337 D 1 1 6/30/2022 17,560 1,190 5,950 12.97 280.00 28.50 29.10 29.90 30.85 30.85 565.00 856.00 11/15/2010
Total/Average 1 6 38,693 2,484 10,284 13.96 270.00 29.21 31.51 34.00 36.53 36.53 562.16 877.33

Rizal - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Morong 144 C 12 12/31/2022 417,876 11,478 57,390 20.97 205.00 22.00 24.95 27.00 29.15 32.40 425.00 674.50 10/19/2021
2. Pililla 487 C 17 12/31/2022 308,691 11,009 55,045 21.26 225.00 23.50 25.50 28.50 32.50 32.50 460.00 715.00 6/25/2007
3. Tanay 88 B 15 2 12/31/2022 568,152 18,203 91,015 21.77 226.00 23.80 26.00 31.80 38.40 38.40 464.00 724.00 7/13/2010
4. Teresa 536 C 11 12/31/2015 219,863 5,991 29,955 22.24 224.00 24.60 27.30 30.60 34.90 34.90 470.00 743.00 5/22/2018
Total/Average 55 2 1,514,582 46,681 193,259 21.51 220.00 23.47 25.93 29.47 33.73 34.55 454.75 714.12

Romblon - 04
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Odiongan 75 D 1 1 12/31/2022 88,400 3,339 16,695 21.91 115.00 11.65 14.80 19.00 23.65 23.65 231.50 379.50 2/8/2005
2. Romblon 64 D 7 12/31/2022 47,603 2,382 11,910 15.45 199.00 22.55 25.35 28.20 33.50 33.50 424.50 678.00 12/5/2017
Total/Average 8 1 136,003 5,721 23,685 19.22 157.00 17.10 20.07 23.60 28.57 28.57 328.00 528.75

Sarangani - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Glan 439 D 5 6/30/2022 59,992 2,086 10,430 12.71 205.40 22.35 25.70 29.05 34.95 34.95 428.90 685.90 2/26/2002
2. Maasim 444 D 2 2 11/30/2014 31,843 1,397 6,985 22.79 80.00 8.50 9.00 9.50 10.00 10.00 165.00 255.00 3/10/1997
3. Malungon 592 D 2 12/31/2022 51,466 2,001 10,005 23.38 224.40 23.75 25.35 27.35 29.70 29.70 461.90 715.40 12/5/2017
Total/Average 7 4 143,301 5,484 22,704 19.17 169.93 18.20 20.01 21.96 24.88 24.88 351.93 552.10

Siquijor - 07
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Metro Siquijor 142 D 7 2 12/31/2022 81,153 3,499 17,495 18.18 160.00 23.20 26.80 30.50 30.50 30.50 392.00 660.00 8/30/2017
Total/Average 7 2 81,153 3,499 14,486 18.18 160.00 23.20 26.80 30.50 30.50 30.50 392.00 660.00

Sorsogon - 05
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barcelona 681 D 1 2/28/2022 45,000 2,589 12,945 14.61 160.00 23.20 26.80 30.50 30.50 30.50 392.00 660.00 8/30/2017
2. Bulan 22 C 1 3 1 12/31/2022 195,827 6,059 30,295 19.46 182.00 19.50 21.00 22.50 23.75 23.75 377.00 587.00 7/26/2018
3. Casiguran 366 C 1 12/31/2022 293,359 6,407 32,035 17.05 98.00 10.90 12.05 13.40 13.40 13.40 207.00 327.50 8/28/2012
4. Donsol 72 D 4 3/31/2022 54,495 2,738 13,690 15.08 278.00 29.80 33.65 38.70 44.30 44.30 576.00 912.50 12/13/2010
5. Gubat 136 C 18 5 10/31/2022 167,500 7,197 35,985 14.97 150.00 16.00 18.30 20.40 23.05 23.05 310.00 493.00 8/22/2006
6. Irosin 586 D 1 3/31/2021 160,000 3,603 18,015 21.92 120.00 13.40 14.40 15.40 16.40 16.40 254.00 398.00 6/25/2002
7. Matnog 263 D 5 12/31/2022 32,906 1,590 7,950 16.06 190.00 21.00 24.75 30.25 35.25 40.25 400.00 647.50 10/26/2022
8. Pilar 474 D 5 4/30/2022 65,644 2,589 12,945 18.16 330.00 34.70 37.15 40.50 44.55 44.55 677.00 1,048.50 7/22/2008
9. Sorsogon City 20 B 12 5 12/31/2021 390,314 14,941 74,705 17.45 191.00 20.85 23.05 25.95 29.25 33.30 399.50 630.00 1/3/2006
Total/Average 1 47 14 1,405,045 47,713 197,532 17.32 188.77 21.03 23.46 26.40 28.93 29.94 399.16 633.77

South Cotabato - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Banga 230 D 2 12/31/2022 59,520 2,488 12,440 17.91 282.75 31.05 34.00 37.00 40.10 40.10 593.25 933.25 5/14/2002
2. City of Koronadal 156 B 23 12/31/2022 794,598 29,395 146,975 20.62 180.30 22.05 26.15 30.25 34.45 34.45 400.80 662.30 11/15/2010
3. Gen. Santos City 370 A 33 12/31/2022 2,068,369 56,741 283,705 25.92 212.00 23.05 26.65 30.50 34.50 34.50 442.50 709.00 3/12/2001
4. Norala 213 D 2 6/30/2022 46,613 2,243 11,215 17.87 236.65 25.20 28.35 31.55 38.40 38.40 488.65 772.15 3/13/2012
5. Polomolok 153 B 17 1 6/30/2022 638,592 23,397 116,985 19.83 195.10 23.40 29.95 36.55 43.15 43.15 429.10 728.60 12/13/2010
6. Sto. Nino 648 D 1 12/31/2022 41,322 1,819 9,095 20.31 250.00 26.50 28.25 30.10 32.00 32.00 515.00 797.50 10/25/2011
7. Surallah 500 C 12 1 12/31/2022 191,756 7,403 37,015 20.43 206.75 22.85 25.75 28.75 31.80 31.80 435.25 692.75 2/22/2005
8. Tupi 280 D 6 2 12/31/2022 121,450 3,475 17,375 26.08 154.00 16.35 17.30 18.30 19.30 19.30 317.50 490.50 11/9/1999
Total/Average 96 4 3,962,220 126,961 525,619 22.87 214.69 23.80 27.05 30.37 34.21 34.21 452.75 723.25

Southern Leyte - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Maasin City 291 C 7 2 6/30/2022 161,967 7,288 36,440 17.81 160.00 18.45 20.20 22.00 24.00 24.00 344.50 546.50 3/1/2005
2. Sogod 188 C 3 4 12/31/2018 91,006 3,541 17,705 17.67 180.00 21.40 24.90 32.30 41.15 41.15 394.00 643.00 1/18/2005
Total/Average 10 6 252,973 10,829 44,832 17.76 170.00 19.92 22.55 27.15 32.57 32.57 369.25 594.75

Sultan Kudarat - 12
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kalamansig 376 D 1 12/31/2022 39,889 2,091 10,455 15.82 240.55 27.30 30.65 34.25 38.10 38.10 513.55 820.05 8/11/2008
2. Lebak 499 D 2 1 12/31/2022 61,896 2,777 13,885 21.17 268.10 27.60 29.35 31.30 33.40 33.40 544.10 837.60 4/28/2004
3. Sultan Kudarat 247 B 17 12/31/2022 537,632 20,109 100,545 23.28 218.40 23.95 26.50 29.85 34.15 34.15 457.90 722.90 9/1/2010
Total/Average 19 2 639,417 24,977 103,405 22.42 242.35 26.28 28.83 31.80 35.21 35.21 505.18 793.51

Sulu - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Jolo Mainland 254 C 2 6/30/2016 103,040 3,828 19,140 16.51 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50 5/20/1992
Total/Average 1 2 103,040 3,828 15,848 16.51 85.00 8.15 10.20 15.35 15.35 15.35 166.50 268.50

Surigao del Norte - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bacuag 515 D 2 1 12/31/2015 17,658 1,217 6,085 12.01 182.00 20.85 24.00 27.30 30.75 30.75 390.50 630.50 2/12/2002
2. Del Carmen 588 D 2 12/31/2013 18,728 852 4,260 11.87 222.60 25.95 30.40 35.50 40.95 40.95 482.10 786.10 9/7/2005
3. Metro Siargao 56 D 2 1 3/31/2021 64,680 3,077 15,385 14.14 204.00 31.20 42.60 54.60 67.20 67.20 516.00 942.00 10/22/2002
4. Placer 355 C 3 12/31/2022 90,153 3,353 16,765 22.12 99.20 10.35 11.35 12.90 13.40 13.40 202.70 316.20 2/23/1999
5. Socorro 628 D 8/31/2016 26,822 1,637 8,185 13.41 190.00 20.85 24.00 27.30 30.75 34.35 398.50 638.50 4/11/2014
6. Surigao Metro 324 B 14 3 11/30/2021 568,066 28,264 141,320 16.55 187.00 23.25 29.25 35.75 43.00 51.75 419.50 712.00 8/22/2001
Total/Average 14 8 7 786,107 38,400 158,976 16.46 180.80 22.07 26.93 32.22 37.67 39.73 401.55 670.88

Surigao del Sur - CARAGA
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Barobo 193 D 2 12/31/2022 29,614 1,162 5,810 20.90 195.00 20.00 21.00 22.50 24.50 24.50 395.00 605.00 1/22/2018
2. Bislig City 23 B 1 3 7 12/31/2022 266,383 11,175 55,875 16.83 196.00 20.75 22.60 27.00 32.55 32.55 403.50 629.50 12/2/2009
3. Cantilan 441 D 1 2 1 7/31/2022 83,526 3,476 17,380 18.21 227.70 25.00 26.35 27.95 29.85 29.85 477.70 741.20 7/10/2017
4. Carmen 646 D 1 3/31/2022 20,340 1,128 5,640 14.78 180.00 20.00 22.25 24.75 27.50 27.50 380.00 602.50 9/25/2017
5. Hinatuan 143 D 2 7 12/31/2022 75,824 4,336 21,680 13.30 200.00 26.75 33.75 41.00 46.40 46.40 467.50 805.00 5/18/2004
6. Lianga 104 D 1 1 1 12/31/2022 82,992 3,994 19,970 16.11 265.00 30.65 35.25 41.50 48.75 48.75 571.50 924.00 3/8/2005
7. Madrid 504 D 1 12/31/2022 28,440 1,658 8,290 17.15 160.00 19.70 23.50 27.40 31.40 31.40 357.00 592.00 2/3/2009
8. Tagbina 419 D 5 12/31/2022 56,480 2,724 13,620 17.43 187.00 20.10 21.90 24.25 27.10 27.10 388.00 607.00 6/28/2005
9. Tandag City 105 C 6 1 12/31/2022 243,602 10,461 52,305 18.47 220.00 26.50 31.25 36.35 41.75 41.75 485.00 797.50 1/21/2016
Total/Average 6 28 10 887,201 40,114 166,072 17.04 203.41 23.27 26.42 30.30 34.42 34.42 436.13 700.41

Tarlac - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Camiling 43 C 16 10/31/2021 274,723 13,368 66,840 16.55 235.00 25.00 28.00 31.00 35.00 40.00 485.00 765.00 12/18/2007
2. Concepcion 134 B 21 12/31/2022 441,902 17,054 85,270 22.27 198.00 21.55 23.55 26.00 28.80 32.00 413.50 649.00 9/7/2005
3. Gerona 222 C 10 12/31/2022 184,436 9,451 47,255 15.57 195.00 21.40 23.80 26.55 29.90 33.60 409.00 647.00 7/16/2008
4. Mayantoc 335 D 1 7 12/31/2012 19,621 1,141 5,705 14.33 215.00 23.00 26.20 29.75 33.65 37.90 445.00 707.00 2/8/2005
5. Moncada 60 C 11 12/31/2022 197,077 9,243 46,215 17.21 185.00 20.00 21.95 24.20 26.90 30.00 385.00 604.50 3/4/2008
6. Paniqui 58 C 10 12/31/2022 295,700 17,248 86,240 13.12 235.00 24.60 26.40 29.00 32.40 36.35 481.00 745.00 2/9/2011
7. Ramos 482 C 4 12/31/2022 82,914 4,432 22,160 16.80 195.00 20.70 22.10 23.70 25.50 27.50 402.00 623.00 11/11/2008
8. Sta. Ignacia 413 D 5 12/31/2022 35,006 2,188 10,940 13.23 290.00 30.80 33.10 36.00 39.20 43.00 598.00 929.00 11/13/2015
9. Tarlac City 14 B 29 12/31/2022 1,053,122 45,771 228,855 18.86 220.00 25.00 27.00 29.00 32.00 35.00 470.00 740.00 3/15/2012
Total/Average 1 113 2,584,501 119,896 496,369 17.65 218.66 23.56 25.78 28.35 31.48 35.03 454.27 712.16

Tawi-Tawi - ARMM
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Bongao 301 D 6 12/31/2022 58,004 2,063 10,315 20.40 123.00 14.50 16.00 17.00 18.00 18.00 268.00 428.00 8/24/1999
Total/Average 6 58,004 2,063 8,541 20.40 123.00 14.50 16.00 17.00 18.00 18.00 268.00 428.00

Western Samar - 08
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Basey 215 D 1 1 12/31/2022 71,420 2,333 11,665 11.92 192.00 20.25 21.90 24.00 26.70 26.70 394.50 613.50 8/23/2005
2. Calbayog City 284 B 1 2 1/31/2015 360,768 11,588 57,940 17.76 287.00 33.15 36.00 40.00 44.75 44.75 618.50 978.50 11/23/2004
3. Calbiga 491 D 1 1 12/31/2022 22,940 19,956 99,780 1.05 180.00 13.40 14.65 16.15 17.90 17.90 314.00 460.50 12/8/2009
4. Catbalogan City 107 C 1 6 3 12/31/2022 276,041 9,681 48,405 18.85 200.00 22.15 24.30 28.25 32.45 32.45 421.50 664.50 2/13/2018
Total/Average 4 10 3 731,169 43,558 180,330 10.40 214.75 22.23 24.21 27.10 30.45 30.45 437.12 679.25

Zambales - 03
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Cabangan 505 D 4 245.00 27.00 29.25 31.75 34.50 37.50 515.00 807.50 3/31/2015
2. Candelaria 541 D 3 10/31/2020 28,505 1,139 5,695 16.61 150.00 15.70 16.65 17.85 19.15 20.45 307.00 473.50 9/18/2001
3. Castillejos 551 C 12 12/31/2022 128,183 7,390 36,950 16.73 245.00 26.10 28.10 30.55 33.45 36.75 506.00 787.00 6/23/2011
4. Iba 238 D 3 12/31/2015 47,410 1,506 7,530 16.78 120.00 13.00 14.25 15.75 17.50 17.50 250.00 392.50 3/31/1997
5. Masinloc 430 D 1 1 12/31/2022 60,369 3,201 16,005 15.21 160.00 17.00 18.00 19.00 20.00 21.00 330.00 510.00 10/26/2005
6. Palauig 529 D 1 12/31/2012 11,179 591 2,955 17.19 150.00 15.65 16.30 16.95 17.60 18.25 306.50 469.50 11/22/2005
7. San Antonio 152 D 6 1 11/30/2019 74,855 3,627 18,135 17.20 215.00 23.20 24.65 26.45 28.55 29.45 447.00 693.50 2/1/2005
8. San Felipe 472 D 8 7/31/2019 53,972 2,701 13,505 16.65 195.00 20.80 21.85 23.10 24.50 26.35 403.00 621.50 3/26/2012
9. San Marcelino 427 C 6 12/31/2022 83,846 4,008 20,040 16.01 275.00 28.80 30.60 32.65 35.20 38.10 563.00 869.00 4/20/2010
10. San Narciso 307 D 7 12/31/2022 11,173 736 3,680 12.65 180.00 25.50 26.10 26.85 27.75 28.75 435.00 696.00 5/21/2002
11. Sta. Cruz 365 D 6 6/30/2021 33,968 1,430 7,150 19.80 170.00 18.15 19.40 20.65 22.00 23.45 351.50 545.50 1/31/2006
12. Subic 126 C 3 25 12/31/2022 488,875 11,609 58,045 23.59 135.00 15.00 17.00 19.25 21.50 24.00 285.00 455.00 7/25/2006
Total/Average 4 83 1 1,022,335 37,938 157,063 18.71 186.66 20.49 21.84 23.40 25.14 26.79 391.58 610.04

Zamboanga Sibugay - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Ipil-Titay 492 D 11 1 6/30/2022 69,162 3,336 16,680 18.04 275.00 34.00 37.00 42.00 48.00 48.00 615.00 985.00 8/4/2009
Total/Average 11 1 69,162 3,336 13,811 18.04 275.00 34.00 37.00 42.00 48.00 48.00 615.00 985.00

Zamboanga del Norte - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Dapitan City 184 C 5 2 12/31/2022 242,107 6,826 34,130 18.71 252.00 26.50 28.20 30.20 32.90 32.90 517.00 799.00 5/28/2008
2. Dipolog City 179 B 15 12/31/2022 462,323 22,232 111,160 16.23 205.00 32.75 34.80 36.85 39.00 41.15 532.50 880.50 5/7/2015
3. Labason 205 D 3 12/31/2022 61,714 2,433 12,165 18.87 210.00 22.00 23.50 25.50 25.50 25.50 430.00 665.00 7/8/2008
4. Liloy 187 D 1 4 12/31/2022 38,907 2,233 11,165 12.55 160.00 18.00 20.25 23.00 23.00 23.00 340.00 542.50 3/16/2004
5. Polanco 532 C 7 12/31/2022 90,490 5,147 25,735 14.84 265.00 40.00 45.50 53.50 64.00 64.00 665.00 1,120.00 8/13/2015
6. Pres. M.A. Roxas 506 D 2 6/30/2022 37,687 1,741 8,705 17.19 234.00 35.00 37.50 40.50 40.50 40.50 584.00 959.00 6/25/2002
7. Rizal 514 D 2 9/30/2022 22,998 1,277 6,385 14.21 213.00 26.10 29.30 32.70 32.70 32.70 474.00 767.00 1/21/2015
8. Sindangan 479 D 1 10/31/2022 57,916 2,281 11,405 17.02 154.00 16.50 17.90 19.50 19.50 19.50 319.00 498.00 3/25/2003
9. Siocon 98 D 1 12/31/2015 26,000 1,289 6,445 17.06 180.00 19.60 22.10 25.30 29.20 29.20 376.00 597.00 9/21/2004
Total/Average 5 30 9 1,040,142 45,459 188,200 16.45 208.11 26.27 28.78 31.89 34.03 34.27 470.83 758.66

Zamboanga del Sur - 09
Water District CCC Category Surface Well Spring As of Production m3/month Service Conn. Population Served Ave. Cons. m3/month Min. Charge 11-20 m3 21-30 m3 31-40 m3 41-50 m3 51-up m3 Cost per
20 m3
Cost per
30 m3
Date Approved
1. Kumalarang 241 D 2 12/31/2022 19,009 899 4,495 15.86 149.75 17.95 20.95 24.50 24.50 24.50 329.25 538.75 10/23/2001
2. Pagadian City 51 B 11 9 6/30/2022 575,858 23,202 116,010 20.22 225.00 25.30 28.20 31.60 35.90 41.10 478.00 760.00 3/20/2014
3. Tukuran 465 D 1 1 12/31/2022 24,960 1,244 6,220 18.09 120.00 13.50 15.00 16.50 16.50 16.50 255.00 405.00 8/20/2002
4. Zamboanga City 6 A 23 7 12/31/2022 4,858,203 68,124 340,620 25.85 210.00 29.50 30.65 35.20 39.75 44.25 505.00 811.50 10/28/2020
Total/Average 35 20 5,478,031 93,469 467,345 24.25 176.18 21.56 23.70 26.95 29.16 31.58 391.81 628.81

Note: Charges apply only for a 1/2" inch domestic connection. For other sizes and connection types the Water District applies a multiplying factor.